ML20151T875

From kanterella
Jump to navigation Jump to search
Ack Receipt of Informing NRC of Steps Taken to Correct Deviations Noted in Insp Repts 50-313/88-10 & 50-368/88-10
ML20151T875
Person / Time
Site: Arkansas Nuclear  Entergy icon.png
Issue date: 08/10/1988
From: Callan L
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
To: Campbell G
ARKANSAS POWER & LIGHT CO.
References
NUDOCS 8808180318
Download: ML20151T875 (1)


See also: IR 05000313/1988010

Text

.

-

,

. l

l

!

'

) AUG ! O Mg

In Reply Refer To:

Dockets: 50-313/88 10

50-368/88-10

Arkansas Power & Light Company

AT1N: Mr. Gene Campbell

Vice President, Nuclear

Operations

P.O. Box 551

Little Rock, Arkansas 72203

Gentlemen:

Thank you for your letter of June 27, 1988, in response to our letter and

Notice of Deviation dated May 20, 1988. We have raviewed your reply and find it

responsive to the concerns raised in our Notice of Deviation. We will review

the implementation of your corrective actions during a future inspection to

determine that full compliance has been achieved and will be maintained.

Sincerely,

original signed by:

Beach for:

L. J. Callan, Director

Division of Reactor Projects

cc:

Arkansas Nuclear One

ATTN: J. H. Levine, Director

Site Nuclear Operations

P.O.' Box 608

Russellville, Arkansas 72801

Arkansas Radiation Control Program Director

bec to DMS (IE01)

-bec distrib. by RIV:

RRI R. D. Martin, RA

RP8-DRSS SectionChief(DRP/A)

Lisa Shea, RM/ALF RIV File

DRP. MIS System

RSTS Operator Project Engineer, DRP/A

G. Dick, NRR Proj.!ct Manager DRS

G. F. Sanborn, E0 80081so31s seosto

PDR ADOCK 05000313

G PNU ,

v

RIV:PSA Q

ATHowell;df

C:PSAh/,

DDChamber

lain hC/llan'Ph(

N I,

8/10/88 8/to/88 8/go/88

_ TEO)