Confirmatory Action Ltr CAL-RIII-86-01A,clarifying & Amending Item 5 in 860131 Confirmatory Action Ltr CAL-RIII-01A Re Maint of Seismic Monitoring Instrumentation. Equipment Will Be Maintained in as Found Condition
ML20151T756
Person / Time
Site: Perry  FirstEnergy icon.png
Issue date: 02/04/1986
From: James Keppler
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
To: Edelman M
CLEVELAND ELECTRIC ILLUMINATING CO.
References
CAL-RIII-86-01A, CAL-RIII-86-1A, NUDOCS 8602100352
Download: ML20151T756 (2)


Text

gg

~

CONFIRMATORY ACTION LETTER CAL-RIII-86-01A

.g, Docket No. 50-440 Docket No. 50-441 The Cleveland Electric Illuminating Company ATTN: Mr. Murray R. Edelman Vice President Nuclear Group Post Office Box 5000 Cleveland, OH 44101 Gentlemen:

This letter refers to our earlier Confirmatory Action Letter, CAL-RIII-86-01, dated January 31, 1986. Item 5 of that letter states that all affected equipment will be maintained in the "as found" condition but allowed routine maintenance to be performed. As a result of the inspections by our Augmented Investigation Team (AIT) and the subsequent conversations between the AIT leader, Dr. C. J. Paperiello, and Mr. M. D. Lyster, of your staff, we _are amending and clarifying Item 5 as follows. It is our understanding, with regard to this matter, that you will:

1. Maintain all seismic monitoring instrumentation in the "as found" condition. Take no action such as removing, repairing, calibrating or replacing instrumentation which would destroy or cause to be lost, any evidence which would be needed_to. investigate the event. Maintenance, surveillance, and calibration will be performed only with the prior concurrence of NRC Region III management.
2. Resume all other activities including work such as, but not limited to, maintenance, training, surveillance, operations and calibrations under the following conditions:

A. All off normal conditions identified during these activities will be documented in accordance with CEI's programs and procedures.

B. Off normal conditions will be evaluated to determine if they were potentially earthquake related.

'B602100352 860204

~

hPR ADOCK 05000440 PDR CONFIRMATORY ACTION LETTER t 1g I

g60

a CONFIRMATORY ACTION LETTER The Cleveland Electric Illuminating 2 Company C. Equipment identified in an off normal condition will be maintained "as found" until evaluated. Equipment determined to be potentially earthquake affected will be maintained in an "as found" condition until released by the NRC.

D. The NRC will be notified of all off nomal potentially earthquake related conditions within 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br />.

3. . Develop special procedures to. implement Item 2.

Please let us know immediately if your understanding differs fro:n that set out above.

Sincerely, Original s,1;ned by J.tes G. Keppler James G. Keppler Regional Administrator cc: J. J. Waldron, Manager, Perry Plant Technical Department M. D. Lyster, Manager, Perry Plant Operations Department L. O. Beck, General Supervising Fuel Management Section DCS/RSB (RIDS)

Licensing F1e Management Branch Resident Inspector, RIII Harold W. Kohn, Ohio EPA Terry J. Lodge, Esq.

James W. Harris, State of Ohio Robart H. Quillin, Ohio Depart:::ent of Health RIIIves RIII g, R RIII RJII RII CCL Knop /pd DFU)

Wa'rnick Pi iello N Davis Kppp}er 2/ 4 /86 7 4 FC- {s

@'V/ss 1gp(, 2/1/&b CONFIRMATORY ACTION LETTER