ML20151T737
| ML20151T737 | |
| Person / Time | |
|---|---|
| Site: | Sequoyah |
| Issue date: | 02/03/1986 |
| From: | Verrelli D NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II) |
| To: | White S TENNESSEE VALLEY AUTHORITY |
| Shared Package | |
| ML20151T743 | List: |
| References | |
| NUDOCS 8602100348 | |
| Download: ML20151T737 (2) | |
See also: IR 05000327/1985047
Text
-
, -
1;-
g8sedt/
Mb
09"f
J-
FEB 0 31986
J
Tennessee Valley Authority
MTTN: .Mr. Steven A. White
-Manager of Power and
Engineering (Nuclear)
6N38 A Lookout Place
1101 Market Street
Chattanooga, TN 37402-2801
Gentlemen:
SUBJECT:
REPORT NOS. 50-327/85-47 AND 50-328/85-47
On December 6, 1985 - January 5, 1986, NRC inspected activities authorized by NRC
Operating License Nos. DPR-77.and DPR-79 for your Sequoyah facility.
At the
conclusion of the inspection, the findings were discussed with those members of
your staff. identified in the enclosed inspection report.
Areas examined during the inspection are identified in the report. Within these
areas, the inspection consisted of selective examinations of procedures and
representative records, interviews with personnel, and observation of activities
in progress.
The inspection findings indicate that certain activities violated NRC require-
ments. The violation, references to pertinent requirements, and elements to be
included in your response are presented in.the enclosed Notice of Violation.
Your attention is invited to the unresolved item identified .in the inspection
. report. These matters will be pursued during future inspections.
Should you have any questions concerning this letter, please contact us.
Sincerely,
ORIGINAL SIGNr0 ny
DAv!D M. VEnna,Q
David M. Verrelli, Chief
Reactor Projects Branch 1
Division of Reactor Projects
Enclosures:
1.
2.
Inspection Report Nos. 50-327/85-47
and 50-328/85-47
cc w/encis:
(See page 2)
1
8602100348 860203
'
ADOCK 05000327
G
II
I
23Eol
-
_ - .
r, g
.p
.
Tennessee Valley Authority
2
FE8 0 31986
c
w/encls:
-
- - . L. Abercrombie, Sequoyah Nuclear
Plant' Site Director
V R. Wallace, Plant Manager
M W. Whitt, Chief, Nuclear
Safety. Review Staff
ud. L. Williams, Jr. , ' Supervisor
icensing Section
. B. Kirk, Compliance Staff
Supervisor
M E.~ Wills, Project Engineer
.
.bec w/encis:
J. A. Olshinski
X R. Denton, NRR
K L. Thompson, NRR
. T M. Taylor, IE
C ,B. Hayes, OI
W RC Resident Inspector
Document Control Desk
State of Tennessee
,
I
i
>
RI
RII
!
RCarroll:bhg
SW ise
- 1/J//86
1/3/86
i
,