ML20151T519

From kanterella
Jump to navigation Jump to search
Safeguards Evaluation Rept Supporting Amend 9 to License NPF-39
ML20151T519
Person / Time
Site: Limerick Constellation icon.png
Issue date: 08/03/1988
From:
NRC
To:
Shared Package
ML20151T508 List:
References
NUDOCS 8808160391
Download: ML20151T519 (3)


Text

.

f  %, . UNITED STATE 3 y g NUCLEAR REGULATORY COMMISSION r, - j WASHING TO N, D. C. 20S$5

%.....j SAFEGUARDS EVALUATION REPORT HISCELLANEOUS AMENDMENTS AND SEARCH RE0VIREMENTS PHILADELPHIA ELECTRIC COMPANY LIMERICK GENERATING STATION, UNITS 1 AND 2 DOCKET NOS. 50-352 AND 50-353 1.0 Ir.troduction The Philadelphia Electric Company (PECO) has filed with the Nuclear Regulatory Comission revisions to their Physical Security Plan for the Limerick Generating Station, Units 1 and 2.

This Safeguards Evaluation Report (SGER) sumarizes how the licensee proposes to meet the Miscellaneous Amendments and Search Requirements revisions of 10 CFR Part 73.55.

Based on a review of the Physical Security Plan, the staff has concluded that the proposed changes satisfy Miscellaneous A:,endments and Search Requirements revisions to 10 CFR 73.55 (51 FR 27817 and 27822) and accompanying 10 CFR 73.70 record reporting requirements. According.ly, the protection provided will ensure that the public health and safety will not be endangered.

2.0 Personnel Search The licensee has provided comitments in the Physical Security Plan to provide a search of all individuals entering the protected area except bona fide Federal, State and local law enforcement personnel on official duty, through the use of equipment designed for the detection of fireams, explosives, and incendiary devices. In addition, the licensee has provided comitments to conduct a physical pat-down search of an individual whenever the licensee has cause to suspect that the individual is attempting to introduce firearms, explosives, or incendiary

..evices into the protected areas; or whenever fireams or explosives detection equlpment is out of service or not operating satisfactorily.

3.0 Vital Area Access PECO has modified their Limerick Generating Station, Units 1 and 2, Physical Security Plan to limit unescorted access to vital areas during non-emergency conditions to individuals who require access in order to perform theiv' duties. They have established current authoro i. 3n access lists for each vital e ta which are updated and approved b- a cognizant manager or su nrvisor at least once every 31 days. PEC0 hs o sured that only individuals w1ose specific duties require access to vital areas during non-emergency conditions are included on their site access list. PEC0 has 88081603?1 880803 PDR ADOCK 05000352 P PDC c

  • O provided further assurance by revoking access and retrieving badges and other entry devices prior to or simultaneously with notification of termination of an individual's unescorted facility access.

Based upon comitments made by the licensee in revisions to their Physical Security Plan, the str.ff has concluded that PEC0 meets the vital area access requirements of 10 CFR 73.55(d)(7)(1)(A)(B) and (C).

4.0 1.ocks and Keys The licensee has comitted to providing methods to reduce the probability of compromise of keys, locks, co,nbinations, and related access control devices used to control access to their protected areas and vital areas. These methods include the rotation of keys, locks, combinations, and related access control devices every 12 months or the changing of these devices whenever there is evidence or suspicion that any key, lock, combination or related access control device may have been compromised or when an individual who has had access to any of these devices has had their access terminated due to a lack of trustworthiness, reliability or inadequate work performance. Only persons granted unescorted facility r.ccess are issued such entry devices.

Based upon comitments made by the licensee in revisions to their Physical Security Plan, the staff has concluded that PECO meets the requirements of 10 CFR 73.55 (d)(0) to reduce the probability of compromise of keys, locks. ombinations, and related access control devices.

5.0 Emeroency Access The licensee has provided comitments to provide for the rapid ingress and egress of individuals during emergency conditions or situations that could lead to emergency conditions by assuring prompt access to vital equipment. An annual review of their physical security plans and contingency plans and procedures will be conducted to evaluate their potential impact on plant and personnel safety.

Emergency access is granted by a licensed senior operator.

Based upon comitments made by the licensee in revisions to their Physical Security Plan, the staff has concluded that PECO meets the requirements of 10 CFR 73.55 (d)(7)(ii)(B) to assure access to vital equipment during emergencies or to situations that may lead to an emergency.

6.0 Protection of Secondary Power Supplies The licensee has provided comitments to protect the on-site secondary power supply system for alarm annunciator equipment and non-portable comunications equipment by including such equipment within a vital area boundary.

Based upon comi+0ents made by the licensee in revisions to their Physical Security Plan, the staff has concluded that PECO meets the requirements of 10 CFR 73.55(e) in protecting the secondary power supplies of alarm annunciator equipment and non-portable comunications equipaient.

i 3-l 7.0 Vital Area Entry / Exit Logging i'

The licensee has comitted to maintaining a log indicating name, badge number, time of entry, and time of exit of all individuals granted access to a vital area l except those individuals entering or exiting the reactor control room.

Based upon comitments made by the licensee it, revisions to their Physical Securit L Plan, the staff has concluded that PECO meets the requirements of 10 CFR 73.70(d) y L by maintaining entry / exit log of individuals accessing vital areas (except the l l reactor control room). I 8.0 Conclusion f Based upon the above evaluation, we find that the licensee has met the requirements of the Miscellaneous Amendments and Search Requirements revision to 10 CFR Part 73.55 and the record reporting requirements of 10 CFR Part 73.70.

Principal Contributor: Robert Skelton, NRR Dated: August 3, 1988

_ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ - _ _ _ _ _ _ _ _