ML20151T515

From kanterella
Jump to navigation Jump to search
Forwards Insp Rept 50-267/85-13 on 850415-19,0717-19 & 1022-25.No Violations or Deviations Noted
ML20151T515
Person / Time
Site: Fort Saint Vrain Xcel Energy icon.png
Issue date: 02/03/1986
From: Gagliardo J
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
To: Lee O
PUBLIC SERVICE CO. OF COLORADO
Shared Package
ML20151T517 List:
References
NUDOCS 8602100289
Download: ML20151T515 (2)


See also: IR 05000267/1985013

Text

.

'

o

l

In Reply Refer To:

pgg 0 3 l$

Docket:

50-267/85-13

Public Service Company of Colorado

ATTN:

0. R. Lee, Vice President

Electric Production

P. O. Box 840

Denver, Colorado 80201-0840

Gentlemen:

This refers to the special inspections conducted by Mr. R. C. Stewart of this

office during the periods April 15-19; July 17-19; and October 22-25, 1985, of

activities authorized by NRC Operating 1.icense DPR-34 for Fort St. Vrain

Nuclear Station, and to the discussion of our findings with Mr. J. W. Gahm, and

other members of your staff at the conclusion of the inspection.

Areas examined during the inspections were specifically focused on the

corrosion phenomenon occurring on steel tendon wires of the prestressed

concrete reactor vessel (PCRV) Tendon System. Within this area, the inspection

consisted of selective examination of the test reports, procedures, and

representative records, interviews with personnel, and observations by the

inspector. Those findings are documented in the enclosed inspection report.

l

Within the scope of the inspection, no violations or deviations were

identi fied.

Should you have any questions concerning this inspection, we will be pleased to

discuss them with you.

,

Sincerely,

engd GF d %

J. E. Gagliardo, Chief

Reactor Projects Branch

!

Enclosure:

!

Appendix - NRC Inspection Report

50-267/85-13

'

l

cc w/ enclosure:

(seenextpage)

'

i

!

-

l

RIV:RSB/0PS

0

RPS/#

RS

RPB

l

RCSteward/tw

R

nd JJaudctn

DR)

ter JEGagli

o

/ /gff86

I/A/86

4/ /B6

l M /86

fj 3

f

l

lh

O

f

9602100209g$$$$367

PDH

ADOCK

pun

i

G

l

._.

__ . _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ - _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ - _ _

,

.

,

-. .

.

Public Service Company of Colorado

-2-

acc w/ enclosure:

J. W. Gahm, Manager, Nuclear

Production Division

' Fort St. Vrain Nuclear Station

._ 16805 WCR'19

Platteville,-Colorado 80651'

L. Singleton,' Manager, Quality

Fort St..Vrain Nuclear Station

16805 WCR 19 .

Platteville, Colorado 80651

Colorado Radiation Control Program Director

-

bec to DMB.(IE01)

'

bec.distrib. by RIV:

  • RPB

.DRSP

'* Resident. Inspector

R..D. Martin, RA

  • Section Chief (RPB/A)
  • RS8

'*Section Chief (RSB/ES)

!

  • R&SPB

L

  • MIS System
  • RSTS Operator
  • RIV File
  • w/766

l

!

L

I

i

i

l

.

L.