Forwards Insp Repts 50-445/88-29 & 50-446/88-25 on 880222- 0329.Response Addressing Technical Open Items Re Inconsistency of Design Criteria W/Fsar or Industry Stds & Need for Addl Confirmation of Designs & Hardware Requested
ML20151T270
Person / Time
Site: Comanche Peak  Luminant icon.png
Issue date: 04/14/1988
From: Charemagne Grimes
NRC OFFICE OF SPECIAL PROJECTS
To: Counsil W
TEXAS UTILITIES ELECTRIC CO. (TU ELECTRIC)
Shared Package
ML20151T274 List:
References
NUDOCS 8804280634
Download: ML20151T270 (5)


See also: IR 05000445/1988029

Text

f #%

'

' UNITED STATES

i af NUCLEAR REGULATORY COMMISSION

=

j* j WASHING TO N, D. C. 20555

a

o e

. .

....*

Docket Nos.: 50-445/446 APR I 4 :9m

Texas Utilities Electric' Company

ATTN: Mr. William G. Counsil

Executive Vice President

400 North Olive Street, Lock Box 81

Dallas, TX 75201

SUBJECT: INSPECTION OF COMANCHE PEAK DESIGN VALIDATION PACKAGES:

50-445/88-29,50-446/88-25

Dear Mr. Counsil:

This letter fomards the results of the subject inspection conducted by the

NRC's Office of Special Projects (OSP). The inspection team was comprised of

personnel from OSP as well as contractors. The inspection took place from

February 22 through March 29, 1988 at Stone a Webster offices in Boston,

Massachusetts and Cherry Hill, New Jersey and at Ebasco offices at Comanche

Peak Steam Electric Station. The team reviewed the TU Electric Design Valida-

tion Packages (DVP) in the areas of mechanical / fluids systems, electrical,

and systems interaction. For these areas, the review covered both the design

criteria and design criteria implementation. For the Systems Interaction

Program, the team perfonned field walkdowns in order to evaluate those

performed by Ebasco.

This inspection complements the NRC's previous reviews of DVPs which are docu-

mented in Inspection Reports 50-445/87-19,50-446/87-15, dated October 15, 1987

and 50-445/87-37, 50-446/87-28, dated February 8, 1988. The enclosed report

notes that there are two significant areas that the team was unable to review

since they were not complete, i.e., pipe break safe shutdown analyses and

voltage profile calculations down to 480Vac motor control centers. These

have been identified as Open Items S-30 and E-34, respectively. As was done

in the previous reports, the enclosed report identifies technical Open Items

in cases where (1) design criteria were considered inconsistent with the FSAR

,

t

! or industry standards or (2) additional justification and/or analysis was

necessary to confirm existing designs or hardware. Our final conclusions on

l the design validation process will be based on a followup inspection which will

l include resolving Open Items identified in this and the previous inspection

l

reports and additional inspections (as noted previously) of design areas not yet

l

inspected. To support the followup inspection, you are requested to provide a

written response to this inspection report. Your response should address the

Open Items, their safety significance, and the extent that these items may

pertain to documents not reviewed by the NRC.

This NRC inspection has included documents in the review sample that were

also reviewed by the TV Electric Engineering Functional Evaluation (EFE)

Program, as well as other documents. We will require that you review this NRC

report with regard to (1) significant items identified by the team (which you

8804280634 s80414

PDR ADOCK 05000445

G PDR

,

.- _. ._ . __.

_________ ___ _ _________ _ ___ _____-__ _ ___-__ _________________ ___-

'

,

h r

.

'

Mr. William G. Counsil -2- .

APR I 41988

Texas Utilities Electric Company

would expect EFE also to have identified) which EFE failed to identify and I

(2) significant items identified by the team for documents not in EFE's i

review scope, i.e., to determine whether this scope is adequate.

'

In sumary, the following actions are required for the NRC to complete its

review of Design Validation Packages and the Project Status Reports: (1)

additional inspections for Open Items S-30 and E-34, (2) TV Electric's written

response to all Open Items identified in NRC design inspections, (3) TV

Electric's review of NRC results with regard to potential enhancement of the l

l

'

EFE program, ano (4) NRC followup inspections as required to assess TU Electric's  !

actions, i.e., (2) and (3). Your prompt actions are requested as it is our

intent to reflect all of the above matters in the Safety Evaluation Report (s)

on the Project Status Reports for these disciplines. The NRC followup inspec-

tion scheduled for the week of April 25, 1988 at Stone and Webster offices in

Boston, Massachusetts is intended to accomplish (4) above, to the extent that

TU Electric actions are completed at that time. Additional followup inspections )

i

will be scheduled as required. l

In accordance with 10 CFR 2.790(a), a copy of this letter and its enclosure

will be placed in the NRC Public. Document Room.

' Sincerely,

)

i

T r .

L M

Christopher I". Grimes, Director

Comanche Peak Project Division

Office of Special Projects

Enc'losure:

Inspection Report

cc: see next page

!

.

- - _ - - _ _ - - _ _ _ - - _ _ _ _

.c

f* 1

.

W. G. Counsil Comanche Peak Steam Electric Station

Texas Utilities Electric Company Units 1 and 2

cc:

Jack R. Newman, Esq. Asst. Director for Inspec. Programs

hewman & Holtzinger, P.C. Comanche Peak Project Division

Suite 1000 U.S. Nuclear Regulatory Comission

1615 L Street, N.W. P. O. Box 1029

Washington, D.C. 20036 Granbury, Texas 76048

Robert A. Wooldridge, Esq. Regional Administrator, Region IV

Worsham, Forsythe, Sampels & U.S. Nuclear Regulatory Comission

Wooldridge 611 Ryan Plaza Drive, Suite 1000

2001 Bryan Tower, Suite 2500 Arlington, Texas 76011

Dallas, Texas 75201

Lanny A. Sinkin

Nr. Homer C. Schmidt Christic Institute

Director of Nuclear Services 1324 North Capitol Street

Texas Utilities Electric Company Washington, D.C. 20002

Skyway Tower

400 North Olive Street, L.B. 81 Ms. Billie Pirner Garde, Esq.

Dallas, Texas 75201 Government Accountability Project

Midwest Office

Mr. Robert E. Ballard, Jr. 104 East Wisconsin Avenue

Director of Projects Appleton, Wisconsin 54911

Gibbs and Hill, Inc.

11 Penn Plaza

New York, New York 10001 David R. Pigott, Esq.

Orrick, Herrington & Sutcliffe

600 Montgomery Street

Mr. R. S. Howard San Francisco, California 94111

Westinghouse Electric Corporation

P. O. Box 355 Anthony Z. Roisman, Esq.

Pittsburgh, Pennsylvania 15230 Suite 600

1401 New York Avenue, NW

Susan M. Theisen Washington, D.C. 20005

Assistant Attorney General

Environmental Protection Division Robert Jablon

P. O. Box 12548, Capitol Station Bonnie S. Blair

Austin, Texas 78711-1548 Spiegel & McDiarmid

1350 New York Avenue, NW

Mrs. Juanita Ellis, President Washington, D.C. 20005-4798

Citizens Association for Sound Energy

1426 South Folk George A. Parker, Chainnan

Dallas, Texas 75224 Public Utility Comittee

Senior Citizens Alliance Of

Ms. Nancy H. Willi ms Tarrant County, Inc.

CYGNA Energy Services 6048 Wcnder Drive

2121 N. California Blvd., Suite 390 Fort Worth, Texas 76133

Walnut Creek, CA 94596

. __ . ..__ . -. _. .. _ . . ..

f

l -

1 .

t 't

i W. G. Counsil -2- Comanche Peak Electric Station

Texas Utilities Electric Company Units 1 ard 2

l

j' cc:

l Joseph F. Fulbright

!

Fulbright & Jaworski

1301 McKinney Street

Houston, Texas 77010

Roger D. Walker

Manager, Nuclear Licensing

Texas Utilities Electric Company ,

Skyway Tower l

400 North Olive Street, L.B. 81 l

Dallas, Texas 75201 l

Mr. Jack Redding  ;

c/o Bethesda Licensing

Texas Utilities Electric Company ,

3 Metro Center, Suite 610 l

Bethesda, Maryland 20814

I

William A. Burchette, Esq.

Counsel for Tex-La Electric Cooperative

'

of Texas

Heron, Burchette, Ruckert & Rothwell

Suite 700

l 1025 Thomas Jefferson Street, NW

Washington, D.C. 20007

I

GDS ASSOCIATES, INC.

Suite 720

1850 Parkway Place

Marietta, Georgia 30067-8237

l Administrative Judge Peter Bloch

U.S. Nuclear Regulatory Conunission

Washington, D.C. 20555

l

Elizabeth B. Johnson

Administrative Judge

Oak Ridge National Laboratory

P. O. Box X, Building 3500

Oak Ridge, Tennessee 37830

Dr. Kenneth A. McCollom

1107 West Knapp

Stillwater, Oklahoma 74075

Dr. Walter H. Jordan

881 West Outer Drive

Oak Ridge, TN 37830

l .

_ _.

, . .

...

1.TV Electric

APR l 41988

.

JE: ~ 1Inspection of Comanche Peak Design Validation Packages:

-445/88-29, 50-446/88-25

Distribution:

t h t 11le

NRC PDR'.

LPDR

CPPD Reading (HQ)

Site Reading *

OSP Reading

CPRT Group *

SRI-0PS*

SRI-CONST*

MIS System, RIV*

RSTS Operator, RIV*

RPB, RIV

RIV Docket File

D. Weiss, RM/ALF*

J. Taylor

S. Ebneter/J. Axelrad

C. I. Grimes

P. F. McKee

J. Wilson

J. Lyons

A. Vietti-Cook

M. Malloy

CPPD-LA

J. Moore, 0GC

J. Gilliland, RIV

F. Miraglia

E. Jordan

J..Partlow

B. Hayes

w/766*

"'""' "

"$

' '

bhhb$b5P "$b$bh'b$b5P$Pb$b5P $b$bPhb$b5P $'

x ..

i C a.......

b :JLy6ss

...........;

..................g>......................

e :Ciarimes  :

4;mii"":4si ;ii' " " " " :4/ pii" " " W)i4)ii" " " ; " ' " " " " ; " " " " "

...............................................................................

__ , _ _.. __ _ . _ . _ , _ _ _ . _ _ . . _ _ _ . _ _ . _ _ . _ . _ , . . , . _ _ , . . _ _ . _ . . _ . . _