ML20151T270
| ML20151T270 | |
| Person / Time | |
|---|---|
| Site: | Comanche Peak |
| Issue date: | 04/14/1988 |
| From: | Charemagne Grimes NRC OFFICE OF SPECIAL PROJECTS |
| To: | Counsil W TEXAS UTILITIES ELECTRIC CO. (TU ELECTRIC) |
| Shared Package | |
| ML20151T274 | List: |
| References | |
| NUDOCS 8804280634 | |
| Download: ML20151T270 (5) | |
See also: IR 05000445/1988029
Text
- %
'
f
UNITED STATES
'
i
af
NUCLEAR REGULATORY COMMISSION
j
j
WASHING TO N, D. C. 20555
=
a
e
o
.
.
....*
Docket Nos.:
50-445/446
APR I 4 :9m
Texas Utilities Electric' Company
ATTN: Mr. William G. Counsil
Executive Vice President
400 North Olive Street, Lock Box 81
Dallas, TX 75201
SUBJECT:
INSPECTION OF COMANCHE PEAK DESIGN VALIDATION PACKAGES:
50-445/88-29,50-446/88-25
Dear Mr. Counsil:
This letter fomards the results of the subject inspection conducted by the
NRC's Office of Special Projects (OSP). The inspection team was comprised of
personnel from OSP as well as contractors. The inspection took place from
February 22 through March 29, 1988 at Stone a Webster offices in Boston,
Massachusetts and Cherry Hill, New Jersey and at Ebasco offices at Comanche
Peak Steam Electric Station.
The team reviewed the TU Electric Design Valida-
tion Packages (DVP) in the areas of mechanical / fluids systems, electrical,
and systems interaction. For these areas, the review covered both the design
criteria and design criteria implementation. For the Systems Interaction
Program, the team perfonned field walkdowns in order to evaluate those
performed by Ebasco.
This inspection complements the NRC's previous reviews of DVPs which are docu-
mented in Inspection Reports 50-445/87-19,50-446/87-15, dated October 15, 1987
and 50-445/87-37, 50-446/87-28, dated February 8, 1988. The enclosed report
notes that there are two significant areas that the team was unable to review
since they were not complete, i.e., pipe break safe shutdown analyses and
voltage profile calculations down to 480Vac motor control centers. These
have been identified as Open Items S-30 and E-34, respectively. As was done
in the previous reports, the enclosed report identifies technical Open Items
in cases where (1) design criteria were considered inconsistent with the FSAR
,
t
!
or industry standards or (2) additional justification and/or analysis was
necessary to confirm existing designs or hardware. Our final conclusions on
l
the design validation process will be based on a followup inspection which will
l
include resolving Open Items identified in this and the previous inspection
reports and additional inspections (as noted previously) of design areas not yet
l
l
inspected. To support the followup inspection, you are requested to provide a
written response to this inspection report.
Your response should address the
Open Items, their safety significance, and the extent that these items may
pertain to documents not reviewed by the NRC.
This NRC inspection has included documents in the review sample that were
also reviewed by the TV Electric Engineering Functional Evaluation (EFE)
Program, as well as other documents. We will require that you review this NRC
report with regard to (1) significant items identified by the team (which you
8804280634 s80414
ADOCK 05000445
G
,
..
.- _.
._
.
__.
. _ -
- - -
.
_ .-
_________ ___ _ _________ _ ___ _____-__ _ ___-__ _________________
___-
'
,
h
r
.
Mr. William G. Counsil
-2-
APR I 41988
'
.
Texas Utilities Electric Company
would expect EFE also to have identified) which EFE failed to identify and
I
(2) significant items identified by the team for documents not in EFE's
i
'
review scope, i.e., to determine whether this scope is adequate.
In sumary, the following actions are required for the NRC to complete its
review of Design Validation Packages and the Project Status Reports:
(1)
additional inspections for Open Items S-30 and E-34, (2) TV Electric's written
response to all Open Items identified in NRC design inspections, (3) TV
Electric's review of NRC results with regard to potential enhancement of the
l
l
EFE program, ano (4) NRC followup inspections as required to assess TU Electric's
!
'
actions, i.e., (2) and (3). Your prompt actions are requested as it is our
intent to reflect all of the above matters in the Safety Evaluation Report (s)
on the Project Status Reports for these disciplines.
The NRC followup inspec-
tion scheduled for the week of April 25, 1988 at Stone and Webster offices in
Boston, Massachusetts is intended to accomplish (4) above, to the extent that
)
TU Electric actions are completed at that time. Additional followup inspections
i
will be scheduled as required.
l
In accordance with 10 CFR 2.790(a), a copy of this letter and its enclosure
will be placed in the NRC Public. Document Room.
' Sincerely,
)
i
T
r
.
L
M
Christopher I". Grimes, Director
Comanche Peak Project Division
Office of Special Projects
Enc'losure:
Inspection Report
cc: see next page
!
.
- - _ - - _ _ - - _ _ _ - - _ _ _ _
.c
f*
1
.
W. G. Counsil
Comanche Peak Steam Electric Station
Texas Utilities Electric Company
Units 1 and 2
cc:
Jack R. Newman, Esq.
Asst. Director for Inspec. Programs
hewman & Holtzinger, P.C.
Comanche Peak Project Division
Suite 1000
U.S. Nuclear Regulatory Comission
1615 L Street, N.W.
P. O. Box 1029
Washington, D.C. 20036
Granbury, Texas 76048
Robert A. Wooldridge, Esq.
Regional Administrator, Region IV
Worsham, Forsythe, Sampels &
U.S. Nuclear Regulatory Comission
Wooldridge
611 Ryan Plaza Drive, Suite 1000
2001 Bryan Tower, Suite 2500
Arlington, Texas 76011
Dallas, Texas 75201
Lanny A. Sinkin
Nr. Homer C. Schmidt
Christic Institute
Director of Nuclear Services
1324 North Capitol Street
Texas Utilities Electric Company
Washington, D.C.
20002
Skyway Tower
400 North Olive Street, L.B. 81
Ms. Billie Pirner Garde, Esq.
Dallas, Texas 75201
Government Accountability Project
Midwest Office
Mr. Robert E. Ballard, Jr.
104 East Wisconsin Avenue
Director of Projects
Appleton, Wisconsin 54911
Gibbs and Hill, Inc.
11 Penn Plaza
David R. Pigott, Esq.
Orrick, Herrington & Sutcliffe
600 Montgomery Street
Mr. R. S. Howard
San Francisco, California 94111
Westinghouse Electric Corporation
P. O. Box 355
Anthony Z. Roisman, Esq.
Pittsburgh, Pennsylvania 15230
Suite 600
1401 New York Avenue, NW
Susan M. Theisen
Washington, D.C. 20005
Assistant Attorney General
Environmental Protection Division
Robert Jablon
P. O. Box 12548, Capitol Station
Bonnie S. Blair
Spiegel & McDiarmid
1350 New York Avenue, NW
Mrs. Juanita Ellis, President
Washington, D.C. 20005-4798
Citizens Association for Sound Energy
1426 South Folk
George A. Parker, Chainnan
Dallas, Texas 75224
Public Utility Comittee
Senior Citizens Alliance Of
Ms. Nancy H. Willi ms
Tarrant County, Inc.
CYGNA Energy Services
6048 Wcnder Drive
2121 N. California Blvd., Suite 390
Fort Worth, Texas
76133
Walnut Creek, CA 94596
.
__
.
..__
.
-. _.
..
_
.
.
..
f
l
-
1
.
t
't
i
W. G. Counsil
-2-
Comanche Peak Electric Station
Texas Utilities Electric Company
Units 1 ard 2
l
j'
cc:
l
Joseph F. Fulbright
!
Fulbright & Jaworski
1301 McKinney Street
Houston, Texas 77010
Roger D. Walker
Manager, Nuclear Licensing
Texas Utilities Electric Company
,
Skyway Tower
l
400 North Olive Street, L.B. 81
l
Dallas, Texas 75201
l
Mr. Jack Redding
c/o Bethesda Licensing
Texas Utilities Electric Company
,
3 Metro Center, Suite 610
l
Bethesda, Maryland 20814
William A. Burchette, Esq.
I
Counsel for Tex-La Electric Cooperative
of Texas
'
Heron, Burchette, Ruckert & Rothwell
Suite 700
l
1025 Thomas Jefferson Street, NW
Washington, D.C.
20007
I
GDS ASSOCIATES, INC.
Suite 720
1850 Parkway Place
Marietta, Georgia 30067-8237
l
Administrative Judge Peter Bloch
U.S. Nuclear Regulatory Conunission
Washington, D.C.
20555
l
Elizabeth B. Johnson
Administrative Judge
Oak Ridge National Laboratory
P. O. Box X, Building 3500
Oak Ridge, Tennessee 37830
Dr. Kenneth A. McCollom
1107 West Knapp
Stillwater, Oklahoma 74075
Dr. Walter H. Jordan
881 West Outer Drive
Oak Ridge, TN 37830
l
.
_
_.
,
.
.
...
1.TV Electric
JE:
Inspection of Comanche Peak Design Validation Packages:
APR l 41988
~ 1 -445/88-29, 50-446/88-25
.
Distribution:
h t 11le
t
NRC PDR'.
LPDR
CPPD Reading (HQ)
Site Reading *
OSP Reading
CPRT Group *
SRI-0PS*
SRI-CONST*
MIS System, RIV*
RSTS Operator, RIV*
RPB, RIV
RIV Docket File
D. Weiss, RM/ALF*
J. Taylor
S. Ebneter/J. Axelrad
C. I. Grimes
P. F. McKee
J. Wilson
J. Lyons
A. Vietti-Cook
M. Malloy
CPPD-LA
J. Moore, 0GC
J. Gilliland, RIV
F. Miraglia
E. Jordan
J..Partlow
B. Hayes
w/766*
bhhb$b5P "$b$bh'b$b5P$Pb$b5P $b$bPhb$b5P
$'
"'""'
"$
"
'
'
i C a.......
...........;
..................g>......................
x ..
b :JLy6ss
e
- Ciarimes
4;mii"":4si ;ii' " " " " :4/ pii" " " W)i4)ii" " " ; " ' " " " " ; " " " " "
...............................................................................
__
,
..
_
. _ . _ , _ _ _ .
_ _ . . _ _ _ . _ _ . _ _
. _ . _ , . . , . _ _ , . . _ _ . _
. . _ . . _