Mechanical Maint Technical Rept, Unit 3 Containment Bldg Tendon Surveillance, Jul 1977 - Jul 1980
ML20151T257
Person / Time
Site: Oconee Duke Energy icon.png
Issue date: 12/20/1985
From:
DUKE POWER CO.
To:
Shared Package
ML20151T237 List:
References
NUDOCS 8602100201
Download: ML20151T257 (7)


Text

.

.~

1.

-b;.

,s 1

I 0:

s DUKE POWER COMPANY OCONEE NUCLEAR STATION 4

e MECHANICAL MAINTENANCE -

TECHNICAL REPORT'

, Unit 3 Containment Building Tendon Surveillance July, 1977 - July, 1980 Equipment Number.

ON3BAGBD0001 December 20, 1985 v:

.r B602100201 e60113 O

PDR ADOCK O$0C0287 G_

PDR

y m-

+

- s.- -

+

OCONEE NUCLEAR STATION.

TECHNICAL REPORT ON UNIT 3 CONTAINMENT BUILDING TENDON SURVEILLANCE

SUMMARY

+

l Conrainment Building Tendon Surveillance was performed on Oconee Unit 3

,during the_ period' July, 1977 through. July, 1980 in accordance with Technical i

Specification 4.4.2..This was the second inspection for the unit.and 'all 7 tendons -inspected have' remained in excellent condition.

DISCUSSION

.Nine' surveillance tendons were inspected for ancho' rage condition and ten-i sioning-force, and of these,;one tendon in each surveillance group was de-tensioned for wire condition inspection and removal of one wire for destructive -

examination. These1 tendons were then re-stressed to. initial stressing requirements.

'1)-

.All tendons and components remain in excellent condition. Grease coverage

-of components was satisfactory. A slight. amount 1of water was found in the grease cap of the shop end of tendon 13H9, with no intrusion of the water into.the grease coverage.' ik) change in grease color'ing or condition-was noted. No significant change in corrosion levels of wires or components

' was found.

2)

-Lift-off forces remain within the acceptable range for all tendons. The force-time trends are not included in this report as they have been

. addressed in the subsequent third inspection which has already been per-formed.

c 3) tTensile testing' performed on wire samples removed from the designated tendons showed that all wires' continue to meet'the requirements of ASTM

.A421 to which the tendons were r.anufactured.

~

4 5

CONCLUSION-Based on the results of this surveillance', the Unit.3 containment Building

' post-tensioning system is in satisfactory condition and.is capable of con-Jtinuing to. perform its intended function. This conclusion has'been further strengthened by the subsequent thf rd tendon' inspection completed prior.to the generation of. this report. Further information, if required, may be obtained from the actual surveillance procedure, PT/3/A/150/14, completed July 31, 1980.

. L

b*

t s

TABLE 1 LIFT-OFF FORCES AT EACH SURVEILLANCE (KIPS)

'First Second ID28

.672.0 688.6

'2D28 689.2 671.3/677.6 (92)

'3D28-698.2 675.1 23V14 727.2 731.7 45V16 703.2 700.2/707.2 (92) 61V16.

707.2 687.2

-31H9 674.2 726.2 53H10 683.1 678.1 15H9 678.1 678.1/760.3~(92)

N' umbers in parentheses are the number of wires remaining NOTES:

1.

at retensioning.

2.

With the exception of 53H10, all values are the average of the values obtained at each end of the tendon.

3.

For 53H10 first inspection, the lift-off is for the shop-end only due to interference.

4.

Double' entries are, respectively, the as found and as left

. values for retensioned tendons.

5.

Lift-off forces were computed from ram area. No calibration data on rams is available.

e u

]

' ( b ';

.;,~

y..

's
3. --. ::

TABLE 2 AVERAGE LIFT OFF FORCE PER WIRE TENDON'

' FORCE (KIPSI' 1D28-7.48.

- 2D28 77.22 3D28-7.26 23V14-7.95 l

'45V16 7.53 61V16 7.39

--31H9 7.89 53H10 7.29-15H9-7.29 t-I 1

c y

+

v-V 7

J k

1 (

..f.

4 g -

TABLE 3 TENDON COMPONENT CONDITION TENDON VIRES BlTITONNEADS WASHERS

- SHIMS BEARING PLATE

-~

1D28-

.A A:

A B

B 2D28[

'A

-A A-B B

-3D28 A :-

'A A

B

~B:

.:13H9 A

-A A

B

-B

,51H9-A-

A A

B B

53H10 A

A A

B B

23V14L A

.A A-B B

_45V16, A

'A A

B

.B 61V16

.A A-A B

B CORROSION LEVELS

'A Bright-metal, no visible oxidation B

Reddish brown' color, no pitting C

0 < Pitt'ing 5 003" D

.003" < Pitting $.006" E.

.006" $ Pitting $.010"

~

b 0 - -

s-.

s.

5-e.

TABLE 4~

TENDON WIRE SPECIMEN TENSILE DATA-MAXIMUM ULTIMATE SAMPLE DIAMETER-LOAD (LBS)

STRENGTH (PSI)'

2D28'Al

.250 13,050-265,850 2D28 A2-

.2,50 13,100 266,870 2D28 B1:

.250 13,200

.268,910 2D28 B2

.250 13,200-268,910 2D28 Cl-

.250 13,200 268,910 4

2D28 C2

.250 13,200 268,910 E

15H9'S1

.249 12,400 254,640' 15H9 S2

.249 12,400 254,640 15H9 C1

.249 12,500 256,7001 15H9 C2

.249 12,300 252,590 15H9 F11

.249 12,400 254,640 15H9 F2

.249 12,350 253,620 45V16 F

.250 12,750 259,740 45V16 C

.250 12,700 258,720 45V16 S

~. 25 0 -

12,650 257,700- $

-