REFUELINGOPERATIp3 3/4.9.6 REFUELING AND FUEL HANDLING PLATFORM $

REFUELING PLATFORM LIMITING CON 0! TION FOR OPERATION 3.9.6.1 The refueling platform shall be OPERABLE and used for handling fuel assemblies or control rods.

APPLICABILITY: During handling of fuel assemblies or control rods.

ACTION:

With the requirements for refueling platform OPERABILITY not satisfied, sus-pend use of any inoperable refueling platform equipment from operations involving the handling of control rods and fuel assemblies after placing the load in a safe condition.

SURVEILLANCE REQUIREMENTS 4.9.6.1 Each refueling platform hoist used for handling of control rods or fues assemblies shall be demonstrated OPERABLE within 7 days prior to the start of such operations with that hoist by:

a.

Demonstrating operation of the overload cuto.ff on the main hoist before the load exceeds 1200 t 50 pounds.

b.

Demonstrating operation of the overload cutoff on the frame-mounted and monorail-mounted auxiliary hoists when the load exceeds 500 : 50 pounds.

"Insert la f-00 ?"'*-!!!-

- etica c' tk^ "atrav=1 dat--!ccP "..eaestrev-!

w.4...

.w.

.w.

4m.

4..u4..a

.a 3---,Ta:1.:'w:i'.:D....'i.i"__"""

e a.::

- - 3; - _

-4.-

Demonstrating operation of the downtravel interlock on the main l

hoist when grapple hook down travel reaches 4 inches below fuel assembly handle during operations within the reactor pressure vessel.

f.

+

Demonstrating operation of the slack cable cutoff on the main hoist l

when the load is less than 50 2 10 pounds.

Demonstrating operation of the loaded interlock on the main hoist l

when the load exceeds 485 1 50 pounds.

Demonstrating operation of the redundant loaded interlock on the l

main hoist when the load exceeds 550 : 50 pounds.

RIVER BEND - UNIT 1 3/4 9-8 8808160280 88081*

DR ADOCK 0500

REFUELING OPERATIONS 3/4.9.6 PEFUELING AND FUEL HANDLING PLATFORMS FUEL HANDLING PLATFORM LIMI?!NG CONDITION FOR OPERATION i

3.9.6.2 The fuel handling platform shall he OPERABLE and used for handling fuel assemblies or controt rods.

APPLICABILITY: During handling of fuel assemblies or control rods.

ACTION:

With the requirements for. fuel handling platform 0PERABILITY not satisfied, suspend use of any inoperable refueling platform equipment from operations involving the handling of control rods and fuel assemblies after placing the load in a safe condition.

SURVEILLANCE REQUIREMENTS 4.9.6.2 Each fuel handling platform hoist used for* handling of control rods or fuel assemblies shall be demonstrated OPERABLE within 7 days prior to the start of such operations with that hoist by:

a.

Demonstrating operation of the overload cutoff on the main hoist before the load exceeds 1100 2 50 pounds.

l b.

Demonstrating operation of the everload cutoff on the monorail-mounted auxiliary hoists when handling control rods before the load exceeds 500 2 50 pounds, and when handling unirradiated fuel before tha,1 cad exceeds 1000 2 50 pounds.

(;; Q g g g' Sre et ett ; e; :tten.+f the u;t r:1 '-t:rl::h t.:r eptr=:!

, (,,

br' g: the ??; -f the etivt i Pedf-ted fee! Or 00-tre! red: te

....m

.m.

..m o.

-4.-

Demonstrating operation of the slack cable cutoff on the main hoist l

when the load is less than 50 t 10 pounds.

Cf.

-+.

Demonstrating operation of the loaded interlock on the main hoist

[

when the load exceeds 350 2 50 pounds.

j RIVER BEND - UNIT 1 3/4 9-9

l l

"Insert 1" c.

Demonstrate operation of the normal uptravel stop interlock of the main l

hoist to maintain at least 8 feet 2 inches of water coverage above the top of the active irradiated fuel.

l d.

Demonstrate operation of the normal uptravel stop interlock of the frame-sounted and monorail-mounted auxillary hoists to maintain at least 6 feet 9 inches of water coverage above the top of the irradiated control rod.

"Insert 2" i

c.

Demonstrate operation of the normal uptravel stop interlock of the main hoist to maintain at least 8 feet 2 inches of water coverage above the top of the active irradiated fuel.

r d.