ML20151T134
| ML20151T134 | |
| Person / Time | |
|---|---|
| Site: | Braidwood |
| Issue date: | 01/27/1986 |
| From: | Harrison J NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III) |
| To: | Reed C COMMONWEALTH EDISON CO. |
| Shared Package | |
| ML20151T138 | List: |
| References | |
| NUDOCS 8602100133 | |
| Download: ML20151T134 (2) | |
See also: IR 05000456/1985048
Text
i
.
JAN 2 71938
Docket No. 50-456
Docket No. 50-457
Commonwealth Edison Company
ATTN:
Mr. Cordell Reed
Vice President
Post Office Box 767
Chicago, IL 60690
Gentlemen:
This refers to the routine safety inspection conducted by Messrs. Z. Falevits
and R. Mendez of this office on October 9 through November 5,1985, of activities
at Braidwood Nuclear Power Station, Units 1 and 2, authorized by NRC Construction
Permits No. CPPR-132 and No. CPPR-133 and to the discussion of our findings
with Mr. T. Quaka and others of your staff at the conclusion of the inspection.
The enclosed copy of our inspection report identifies areas examined during
the inspection.
Within these areas, the inspection consisted of a selective
exami ation of procedures and representative records, observations, and
interviews with personnel.
During this inspection, certain of your activities appeared to be in violation
of NRC requirements, as described in the enclosed Notice.
With respect to
items 2.a and 2.b the inspection showed that action had been taken to correct
the identified violations and to prevent recurrence.
Our understanding of your
corrective actions are described in Paragraphs 5.b. and 6.a. of the enclosed
inspection report.
Consequently, no reply to the violations is required and we
have no further questions regarding this matter at this time.
Regarding the remaining items, a written response is required.
In accordance with 10 CFR 2.790 of the Commission's regulations, a copy of this
letter and the enclosed inspection report will be placed in the NRC Public
Document Room.
The responses directed by this letter and the accompanying Notice are not
subject to the clearance procedures of the Office of Management and Budget as
required by the Paperwork Reduction Act of 1980, PL 96-511.
G602100133 y'h,'k') 3
ADOCK
G
I l
g:@
-
.
.
Commonwealth Edison Company
2
JAN 2 71986
We will gladly discuss any questions you have concerning this inspection.
Sincerely,
g ,,3 *,7,;1. S * ;r.;d by U .'U . N' '
-
J. J. Harrison, Chief
Engineering Branch
Enclosures:
1.
2.
Inspection Reports
No. 50-456/85048(DRS);
No. 50-457/84047(DRS)
cc w/ enclosures:
D. L. Farrar, Director
of Nuclear Licensing
M. Wallace, Project Manager
D. Shamblin, Construction
Superintendent
J. F. Gudac, Plant Manager
C. W. Schroeder, Licensing and
Compliance Superintendent
DCS/RSB (RIDS)
Licensing Fee Management Branch
Resident Inspector, RIII
Braidwood
Resident Inspector, RIII Byron
Phyllis Dunton, Attorney
General's Office, Environmental
Control Division
D. W. Cassel, Jr., Esq.
J. W. McCaffrey, Chief, Public
Utilities Division
H. S. Taylor, Quality Assurance
Division
E. Chan, ELD
'
J. Stevens, NRR
The Honorable Herbert Grossman, ASLB
The Honorable A. Dixon Callihan, ASLB
The Honorable Richard F. Cole, ASLB
RIII
RIII
RIII,
R
g
hCd.
/27-t
77
It sN
billiams
Littl'e
ison
Mendez/jlk
Falevits
/f4
ja
l}31
94
-