ML20151T083
| ML20151T083 | |
| Person / Time | |
|---|---|
| Issue date: | 08/25/1998 |
| From: | Skay D NRC (Affiliation Not Assigned) |
| To: | Richards S NRC (Affiliation Not Assigned) |
| References | |
| GL-98-04, GL-98-4, NUDOCS 9809090234 | |
| Download: ML20151T083 (5) | |
Text
.
t August 25, 1998 MEMORANDUM TO: Stuart A. Richards, Director Project Directorate lil-2 Division of Reactor Projects - Ill/lV, NRR FROM:
Donna M. Skay, Project Manager-ORIG. SIGNED BY:
Project Directorate lil 2 Division of Reactor Projects - lil/IV, NRR
SUBJECT:
FORTHCOMING MEETING WITH THE BOILING WATER REACTOR OWNERS' GROUP Q;00 DATE & TIME:
Tuesday, September 8,1998; pm -4:00 pm Wednesday, September 9,1 8; 8:00 am - 12:00 pm LOCATION:
Embassy Suites Chevy Chase Pavilion 7400 Military Road, NW Washington, D.C. 20015 PURPOSE:
September 8,1998 - to discuss the NRC's safety evaluation of the BWR Owners' Group Utility Resolution Guidance for ECCS Suction Strainer Blockage.
September 9,1998 - to discuss Generic Letter 98-04, "Potantial for i
Degradation of the Emergency Core Cooling System l
and the Containment Spray System after a Loss-of-Coolant Accident Because of Construction and Protective Coating Deficiencies and Foreign Materialin Containment."
A preliminary agenda for these meetings is attached.
PARTICIPANTS:'
NRC UTILITY A. Serkiz, RES R. Sgarro J. Davis, NRR T. Green R. Lobel, NRR J. Branum R. Elliott, NRR, et al.
Attachment:
Agenda rgp g {gI[) hb 9[
cc w/att: See next page CONTACT: Donna M. Skay uL (301) 415-1322 a.
members of the public, petitioners, intervenors, or other parties to attend as o
- Meetings between NRC technical staff and applicants orlicensees are open for interested to " Commission Policy Statement on Staff Meetings Open to the Public" 59 Federal Reaister 48340, 9/20/94.
b g A d s-6 DISTRIBUTION: See next page DOCUMENT NAME: G:\\CM\\SKAY\\98908.NOT To RECEIVE A COPY OF THis DOcVMENNNDICATE IN THE aOX:"C" e COPY WITHOUT ENCLOSURES "E" = COPY WITH ENCLOSURES "N"
!2 DD:PD3-2 C
OFFICE PM:PD3-2 m
.A:@D3 NAME DSkay:sphM (MbYe(
SRichards SM DATE 8/ I /98 8/M /98 8/ )$ /98 g r,iai..rnorw npy PDR TOPRP EMV M C
m.-.. _ _ - - -
R5Z nued b H
' [..*\\
umraoerares n SN*
M ^/ E of 7/are
- r. -
3 g
NUCLEAR REGULATORY COMMISSION O A/
79 pffg".
WAsNINeToN, D.c. SpeeMOM G
i see * -
August 25,1998 MEMORANDUM To: Stuart A. Richards, Director Project Directorate lil-2 Division of Reactor Projects - lil/IV
)
FROM:
Donna M. Skay, Project hana er N
Project Directorate ill-2 Division of Reactor Projects -lil/IV, NRR 1
SUBJECT:
FORTHCOMING MEETING WITH THE BOLLING WATER REACTOR OWNERS' GROUP DATE & TIME:
Tuesday, September 8,199 pm - 4:00 pm Wednesday, September 9,1 98; 8:00 am - 12:00 pm j
LOCATION:
Embassy Suites Chevy Chase Pavilion 7400 Military Road, NW Washington, D.C. 20015 PURPOSE:
September 8,1998 - to discuss the NRC's safety evaluation of the BWR Owners' Group Utility Resolution Guidance for ECCS Suction Strainer Blockage.
September 9,1998 - to discuss Generic Lstter 98 04, " Potential for Degradation of the Emergency Core Cooling System and the Containment Spray System after a Loss of-Coolant Accident Because of Construction and Protective Coating Deficiencies and Foreign Materialin Containment."
l A preliminary agenda for these meetings is attached.
1 PARTICIPANTS.*
HEQ EjkU A. Serklz, RES R. Sgarro J. Davis, NRR T. Green R. Lobel, NRR J. Branum R. Elliott, NRR, et al.
Attachment:
Agenda cc w/att: See next page 1
CONTACT: Donna M. Sksy (301)415 1322 4
l
- Meetings between NRC technical staff and applicants orlicensees are open for interested
]
members of the public, petitioners, intervenors, or other parties to attend as observers pursuant to " Commission Policy Statement on Staff Meetings Open to the Public" 59 Federal Realster 48340,9/20/94.
j r
m___.
~ k, BWR Owners' Group ECCS Suction Strainer Committee Preliminary Meeting Agenda September 8.1998 i
1:00 p.m.
Introductions
1:15 p.m.
SER regarding BWR Owners' dbup Utility R. Elliot (NRC)
Resolution Guldance for ECCS Strainer Blockage Overview 2:15 p.m.
BWR Owners' Group Comments /
Questions /Open Discussion i
Containment Costings Committee Preliminary Meeting Agenda Geotember 9.1998 8:00 a.m.
Introductions
8:15 a.m.
BWR Owners' Group Program Overview J. Branum (SNC) 8:30 a.m.
Results of BWR Owners' Gmup containment D. Hill (Supply System)
Coatings LOCA Testing 9:30 a.m.
Questions / Answers Regarding BWR Owners' Group LOCA Testing 10:00 a.m.
Break 10:15 a.m.
NRC LOCA Test Program Plans and Status A. Serkiz(NRC) 11:00 a.m.
Questions / Answers Regarding NRC LOCA Test Plans 11:30 a.m.
Open Discussion / Summarize Action items I
l ATTACHMENT l
,,m.7-
.. = _ _ -
I.
cc:
Thomas J. Rausch, Chairman W. Glenn Warren Bolling Water Reactor Owners' Group Southem Nuclear / Georgia Power Commonwealth Edison Company E.1. Hatch Nuclear Plant 1400 Opus Place PO Box 1295 M/C B052 Downers Grove,IL 60515 Birmingham, AL 35201 Carl D. Tony
-l.
Dennis B. Townsend Vice President, Nuclear Engineering GE Nuclear Energy Niagara Mohawk Power Corporation M/C 182 Nine Mile Point-2 175 Curtner Avenue PO Box 63 San Jose, CA 95125 Lycoming, NY 13093 Drew B. Fetters Thomas A. Green PECO Energy GE Nuclear Energy Nuclear Group Headquarters Mail Code 182 MC 62C-3 175 Curtner Avenue SS5 Chestert> rook Blvd.
San Jose, CA 95125 Wayne, PA 19087 George T. Jones Pennsylvania Power & Light MC A6-1 Two North Ninth Street Allentown, PA 18101 Lewis H. Sumner Southem Nuclear / Georgia Power E.1. Hatch Nuclear Power Plant 40 invemess Parkway PO Box 1295 Birmingham,GA 35201 John Kelly New York Power Authority 14th Floor Mail Stop 14K Centroplex Building i
123 Main Street White Plains, NY 10601 i
I
=-
GH a""
- ,}
et my.
I Meeting with BWR Owners' Group on September 8 and 9,1998 DISTRIBUTION:
EMill S. Collins /F. Miraglia (SJC1/FJM) l B. Boger(BAB2)
L E. Adensam (EGA1)
S. Richards (SAR)
G. Holahan (GMH)
T. Martin (SLM3) l C. Moore (ACM) l C. Berlinger (CHB)
J. Kudrick (JAK1)
A. D'Angelo (TXD) l R. Elliott (RBE) l D. Skay (DMS6)
J. Hickman (JBH)
J. Davis (JRD1)
R. Lobel (RML)
T. Hiltz (TGH)
J. Strasma (RJS2)
M. Marshall (MXM2)
A. Serkiz (AWS)
PMNS Hard Coov Central File PUBLIC PD3-2 r/f OGC,015B18 j
& TWFN l
l 8
- -.