ML20151T080

From kanterella
Jump to navigation Jump to search
Forwards Safety Insp Repts 50-456/88-10 & 50-457/88-11 on 880314-30.No Violations Noted
ML20151T080
Person / Time
Site: Braidwood  Constellation icon.png
Issue date: 04/21/1988
From: Harrison J
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
To: Reed C
COMMONWEALTH EDISON CO.
Shared Package
ML20151T086 List:
References
NUDOCS 8804280575
Download: ML20151T080 (2)


See also: IR 05000456/1988010

Text

4

+- .

t

, e ,< .

.

APR 211993

,

Docket No. 50-456

'

Docket No. 50-457

Commonwealth Edison Company

ATTN: Mr. Cordell Reed *

Senior Vice President

Post Office Box 767

Chicago, IL 60690

Gentlemen:

This refers to the routine safety inspection conducted by Mr. J. Holmes of

this office on March 14 through March 30, 1988, of activities at the Braidwood

Station, Units 1 anc i authorized by NRC Operating Licenses No. NPF-72 and

No. NPF-75 and to the disc.ussion of our fir. dings with Mr. K. Kofron at the

conclusicn of the inspection. This inspection was conducted to review the

status of fire protection license conditions and open items. P

The enclosed copy of our inspection report identifies areas examined during

the inspection. Within these areas, the inspection consisted of a selective

examination of procedures and representative records, observations, and

interviews with personnel.

No violations of NRC requirements were identified during the course of this

inspection.

In accordance with 10 CFR 2.790 of the Commission's regulations, a copy of

this letter and the enclosed inspection report will be placed in the NRC

Public Document Room.

We will gladly discuss any questions you have concerning this inspection.

Sincerely,

~ 3 : - ' 'l ? " .1. O , I::, ;;

J. J. Harrison, Chief

Engineering Branch

Enclosure: Inspection Reports

No. 50-456/88010(DRS);

No. 50-457/88011(DRS)

See Attached Distribution

RIII

'

RIII RIII RI

nhV

Holmes /jlr inds

Pn

Gardrer Harr Jon

&Y AMM k%Db l7) h (\

8804200575 880421 fn

PDR ADOCK 05000456

Q DCD hv{

.

.. ..

., . .

  • .

?^ . .'

.

O ,\-

Commonwealth Edison' Company 2:

pj)R 211988

,

s

Distribution

cc w/ enclosure: .

'd

'

T. J. Maiman, Vice. President,

f.'

'

.PWR Operations j

D. Butterfield, Nuclear-

Licensing Manager

M. Wallace, Manager of Projects-

M.'Lohmann, Project Construction

and Startup Superintendent

W. Vahle, Construction l

Superintendent  ;

R. E. Querio, Station Manager '

P. L. Barnes, Regulatory i

Assurance Supervisor

DCD/DCB (RIDS)

Licensing-Fee Management Branch

Resident Inspector, RIII

Braidwood

!

Resident Inspector, RIII Byron  !

D. W. Cassel, Jr. , Esq.

Richard Hubbard

J. W. McCaffrey, Chief, Public '

Utilities Division

H. S. Taylor, Quality Assurance

Division  :

E. Chan, 0GC

G. Berry, OGC

Stephen P. Sands, NRR

The Honorable A. Dixon Callihan, ASLB

The Honorable Richard F. Cole, ASLB

The Honorable Ivan W. Smith, ASLB

The Honorable Gary J. Edles, ASLAP i

The Honorable Dr. W. Reed Johnson, ASLAP

The Honorable Christine N. Kohl, ASLAP i

A. Datta, RES  :

C. McCracken, NRR

t

A. Krasopoulos, RI '

G. Wiseman, RII i

.,

'

A. Singh, RIV l

C. Ramsey, RV l

i

i

f

.

_ _ _ _ - - - - - _ _ - - - _ - - - _ - - - - - - - - - - - - _ - - - - - - - _ - . - _ --

i