ML20151T080
| ML20151T080 | |
| Person / Time | |
|---|---|
| Site: | Braidwood |
| Issue date: | 04/21/1988 |
| From: | Harrison J NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III) |
| To: | Reed C COMMONWEALTH EDISON CO. |
| Shared Package | |
| ML20151T086 | List: |
| References | |
| NUDOCS 8804280575 | |
| Download: ML20151T080 (2) | |
See also: IR 05000456/1988010
Text
4
+-
t
.
, e ,<
.
.
APR 211993
,
'
Docket No. 50-456
Docket No. 50-457
Commonwealth Edison Company
ATTN:
Mr. Cordell Reed *
Senior Vice President
Post Office Box 767
Chicago, IL 60690
Gentlemen:
This refers to the routine safety inspection conducted by Mr. J. Holmes of
this office on March 14 through March 30, 1988, of activities at the Braidwood
Station, Units 1 anc i authorized by NRC Operating Licenses No. NPF-72 and
No. NPF-75 and to the disc.ussion of our fir. dings with Mr. K. Kofron at the
conclusicn of the inspection.
This inspection was conducted to review the
status of fire protection license conditions and open items.
P
The enclosed copy of our inspection report identifies areas examined during
the inspection.
Within these areas, the inspection consisted of a selective
examination of procedures and representative records, observations, and
interviews with personnel.
No violations of NRC requirements were identified during the course of this
inspection.
In accordance with 10 CFR 2.790 of the Commission's regulations, a copy of
this letter and the enclosed inspection report will be placed in the NRC
Public Document Room.
We will gladly discuss any questions you have concerning this inspection.
Sincerely,
~ 3 : - ' 'l ? " .1. O , I::, ;;
J. J. Harrison, Chief
Engineering Branch
Enclosure:
Inspection Reports
No. 50-456/88010(DRS);
No. 50-457/88011(DRS)
See Attached Distribution
RIII
RIII
RIII
RI
nhV
Pn
'
Holmes /jlr
inds
Gardrer
Harr Jon
&Y
AMM
k%Db
l7) h
(\\
8804200575 880421
hv{
fn
ADOCK 05000456
Q
.
.. ..
.,
.
.
.
?^
.'
.
.
O
,\\-
Commonwealth Edison' Company
2:
pj)R 211988
,
s
Distribution
cc w/ enclosure:
T. J. Maiman, Vice. President,
.
'd
'
f.
.PWR Operations
j
'
D. Butterfield, Nuclear-
'
Licensing Manager
M. Wallace, Manager of Projects-
M.'Lohmann, Project Construction
and Startup Superintendent
W. Vahle, Construction
l
Superintendent
R. E. Querio, Station Manager
'
P. L. Barnes, Regulatory
i
Assurance Supervisor
DCD/DCB (RIDS)
Licensing-Fee Management Branch
Resident Inspector, RIII
Braidwood
!
Resident Inspector, RIII Byron
D. W. Cassel, Jr. , Esq.
Richard Hubbard
J. W. McCaffrey, Chief, Public
'
Utilities Division
H. S. Taylor, Quality Assurance
Division
E. Chan, 0GC
G. Berry, OGC
Stephen P. Sands, NRR
The Honorable A. Dixon Callihan, ASLB
The Honorable Richard F. Cole, ASLB
The Honorable Ivan W. Smith, ASLB
The Honorable Gary J. Edles, ASLAP
i
The Honorable Dr. W. Reed Johnson, ASLAP
The Honorable Christine N. Kohl, ASLAP
i
A. Datta, RES
C. McCracken, NRR
t
A. Krasopoulos, RI
'
G. Wiseman, RII
i
A. Singh, RIV
.,
'
C. Ramsey, RV
i
i
f
.
- - - - -
- - -
- - -
- - - - - - - - - - - -
- - - - - - -
-
. -
--
i