ML20151S029
| ML20151S029 | |
| Person / Time | |
|---|---|
| Site: | Fort Calhoun |
| Issue date: | 04/19/1988 |
| From: | Bournia A Office of Nuclear Reactor Regulation |
| To: | Andrews R OMAHA PUBLIC POWER DISTRICT |
| Shared Package | |
| ML20151S034 | List: |
| References | |
| TAC-67466, NUDOCS 8804280157 | |
| Download: ML20151S029 (4) | |
Text
T April 19,1988 Docket No. 50-285 Mr. R. L. Andrews Division Manager - Nuclear Production Omaha Public Power District 1623 Harney Street Omaha, Nebraska 68102
Dear Mr. Andrews:
SUBJECT:
FORT CALHOUN STATION, UNIT NO. 1 - AMENDMENT fl0. Il2TO FACILITY OPERATING LICENSE NO DPR-40 (TAC NO. 67466)
The Comission has issued the enclosed Amendment No. ll2 o Facility Operating t
License No. DPR 40 for the Fort Calhoun Station, Unit No.1.
This arendment consists of changes to the Technical Specifications in response to your application dated March 9, 1988 (LIC-88-134).
The amendment revises the Technical Specifications to pemit an extension to the next due date from April 30, 1988 to the refueling outage scheduled for September 1988 for perfoming the inspection of Diesel Generator No. I required by Surveillance Requirements.
A copy of our related Safety Evaluation is enclosed. The notice of issuarce will be included in the Comission's next Bi-weekly Federal Register notice.
Sincerely,
/s/
Anthony Bournia, Project ttanager Project Directorate - IV Division of Reactor < Projects - III, IV, Y and Special Projects Office of Nuclear Reactor Regulation
Enclosures:
1.
Amendment No.112 o DPR-40 t
2.
Safety Evaluation cc w/ enclosures:
See next page DISTRIBUTION _:
' Docket-File JPartlow NRC PDR ~
TBarnhart(4) local PDR Wanda Jones PDd Peading EButcher PNoonan (3)
ACRS(10)
ABournia GPA/PA JCalvo ARM /LFMB 8804280157 880419
~
OGC-Rockville DHagan PDR ADOCK 05000285 EJordan Plant File P
PDR 00CUltENT NAME: TAC 67466 CM
)
b6 JCalvo$%
PD4/L(Q PD4/PM SEL OGC-Rockv1Tle PD4/D PNoorian ABournia:
FRosa E. Ch c.n 04/// /88 04/i/88 04/.f/88 04/l4/88 04//1/88
April 19,1988
~
Docket No. 50-285 Mr. R. L. Andrews Division Manager - Nuclear Production Omaba Public Power District 1623 Harney Street Omaha, Nebraska 68102
Dear Mr. Andrews:
SUBJECT:
FORT CALHOUN STATION, UFIT N0.1 - AMENDMENT NO.112TO FACILITY OPERATING LICENSE NO. DPR-40 (TAC NO. 67466)
The Comission has issued the enclosed Amendment No.112 o Facility Operating t
License No. DPR 40 for the Fort Calhoun Station, Unit No.1. This amendment consists of changes to the Technical Specifications in response to your applicationdatedMarch9,1988(LIC-88-134).
The amendment revises the Technical Specifications to pemit an extension to the next due date from Apri,1 30, 1988 to the refueling outage scheduled for September 1988 for performing the inspection of Diesel Generatnr No.1 required by Surveillance Requirements.
A copy of our related Safety Evaluation is enclosed. The notice of issuarce will be included in the Comission's next Bi-weekly Federal Register notice.
j i
Sincerely,
/s/
Anthony Bournia, Project !!anager Project Directorate - IV Division of Reacter Projects - III, l
IV, V and Special Projects j
Office of Nuclear Reactor Regulation
Enclosures:
I.
Amendment No.112 o DPR-40 t
2.
Safety Evaluation cc w/ enclosures:
See next page DISTRIBUTION:
Docket File JPartlow NRC PDR TBarnhart(4) local PDR Wanda Jones PD4 Reading EButcher PNoonan(3)
ACR3(10)
ABournia GPA/PA JCalvo ARM /LFMB OGC-Rockville CHagan EJordan Plant File DOCUltENT FAME: TA 7466 g
JCalvo$$
PD4/LA3f/'
PD4/PM SEL OGC-RockvfTle PD4/D PNoonaw ABournia:
FRosa E. Che a 04/4/88 04/1 /88 C4/[/88 04/l4/88 04//1/88
5 i
- g UNITED STATES
~
[
g NUCLEAR REGULATORY COMMISSION 3
- j WASHINGTON, D. C. 20555 g
April 19,1988 Docket No. 50-285 l
Mr. R. L. Andrews Division Manager - Nuclear Production Omaha Public Power District 1623 Harney Street Omaha, Nebraska 68102
Dear Mr. Andrews:
i
SUBJECT:
FORT CALHOUN STATION, UNIT NO. 1 - AMENDMENT N0. 112TO FACILITY OPEPATING LICENSE NO. DPR-40 (TAC NO. 67466) j The Comission has issued the enclosed Amendment No.112 to Facility Operating License No. DPR-40 for the Fort Calhoun Station, Unit No. 1.
This amendment consists of changes to the Technical Specifications in response to your application dated March 9, 1988 (LIC-88-134).
The amendment revises the Technical Specifications to pemit an extension to the next due date from April 30, 1988 to the refueling outage scheduled for September 1988 for perfoming the inspection of Diesel Generator No. I required by Surveillance Requirements.
A copy of our related Safety Evaluation is enclosed. The notice of issuance will be included in the Comission's next Bi-weekly Federal Register notice.
Sincerely, s
h' Anthony Bournia, Project Manager Project Directorate - IV Division of Reactor Projects - III, IV, V and Special Projects
)
Office of Nuclear Reactor Regulation
Enclosures:
1.
Amendment No.112to DPR-40 2.
Safety Evaluation cc w/ enclosures:
See next page
Mr. R. L. Andrews Fort Calhoun Station Omaha Public Power District Unit No. 1 cc:
Harry H. Voigt, Esq.
LeBoeuf, Lamb, Leiby & MacRae 1333 New Hampshire Avenue, NW Washington, D.C.
20036 Mr. Jack Jensen, Chairman k'ashington County Board of Supervisors Blair, Nebraska 68008 l
Mr. Phillip Harrell, Resident Inspector U.S. Nuclear Regulatory Commission P. O. Box 309 Fort Calhoun, Nebraska 68023 Mr. Charles B. Brinknan, Manager Washington Nuclear Operations C-E Power Systems 7910 Woodmont Avenue Bethesda, Maryland 20814 Regional Administrator, Region IV U.S. Nuclear Regulatory Comnission Office of Executive Director for Operations 611 Ryan Plaza Drive, Suite 1000 Arlington, Texas 76011 Harold Borchert, Director Division of Radiological Health
~
Department of Health 301 Centennial Mall, South P.O. Box 95007 Lincoln, Nebraska 68509 W. G. Gates, Manager Fort Calhoun Station P. O. Box 399 Fort Calhoun, Nebraska 6P.023
... -.