Forwards Insp Repts 50-321/88-19 & 50-366/88-19 on 880627-0701.No Violations or Deviations Noted
ML20151R982
Person / Time
Site: Hatch  Southern Nuclear icon.png
Issue date: 07/29/1988
From: Dan Collins
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To: Hairston W
GEORGIA POWER CO.
Shared Package
ML20151R985 List:
References
NUDOCS 8808150003
Download: ML20151R982 (2)


See also: IR 05000321/1988019

Text

00500l

i ; ,,

.

"

'

a n a 9 itse

-

Docket Nos. 50-321, 50-366

License Nos. DPR-57, NPF-5

Georgia Power Company

ATTH: Mr. W. G. Hairston, III

Senior Vice President -

Nuclear Operations

P. 0. Box 4545

Atlanta, GA' 30302

Gentlemen:

SUBJECT:

NRC INSPECTION REPORT NOS. 50-321/88-19 AND 50-366/88-19

'This refers to the Nuclear Regulatory Commission (NRC) inspection conducted by

P. G. Stoddart on June 27-July 1,1988.

The inspection included a review of

activities authorized for your Hatch facility.

At the conclusion of the

inspection, the findings were discussed with those members of your staff

identified in the enclosed inspection report.

Areas examined during the inspection are identified in the report.

Within

these areas, the inspection consisted of selective examinations of procedures

,

and representative records, interviews with personnel, and observation of

activities in progress.

Within the scope of the inspection, no violati.ons or deviations were

identified.

In accordance with Section 2.790 of the NRC's "Rules of Practice," Part 2,

Title 10, Code of Federal Regulations, a copy of this letter and its enclosure

will be placed in the NRC Public Document Room.

Should_you have any questions concerning this letter, please contact us.

Sincerely,

(ori9 nal 6[qned by 7' Decker)

i

,

Douglas M. Collins, Chief

Emergency Preparedness and

Radiological Protection Branch

Division of Radiation Safety

and Safeguards

Enclosure:

(See page 2)

8808150003 880729

l

PDR

ADOCK 05000.

0

PDC

~

l

IEch

-

- ~ . . .

7..

A

-d

,' ,e .

,

. _ .

..

,

,

'

  • 2

~ Georgia Power Company _

Enclosure:

Inspection Report

cc w/encli

R. P. Mcdonald, Executive Vice. President.

Nuclear.0perations

J. T. Beckham,.Vice President, Plant Hatch

H. C. Nix, Plant Manager

.0. M. Fraser, Site Quality Assurance-(QA)

,

. Supervisor

'

L. Gucwa, Manager, Nuclear Safety

and Licensing

bec w/ encl:

NRC Resident Inspector

DRS, Technical Assistant

Hugh S. Jordan, Executive Secretary

-Document Control Desk

State of Georgia

,

'RII

RII

RII

D )l/fi

Cl* WII

PS".6ddart J

e

MSinkule

7//)&/88

7

/88

7/p/88

,