Forwards Insp Rept 50-285/88-22 on 880629-0718.Enforcement Conference Scheduled for 880811 to Discuss Noted Violation. Agenda for Meeting Encl
ML20151R905
Person / Time
Site: Fort Calhoun Omaha Public Power District icon.png
Issue date: 07/29/1988
From: Callan L
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
To: Morris K
OMAHA PUBLIC POWER DISTRICT
Shared Package
ML20151R908 List:
References
EA-88-201, NUDOCS 8808120341
Download: ML20151R905 (2)


See also: IR 05000285/1988022

Text

..- .

. , _

u, , -

.

. .

3-

.

,

,

q w,  ;-

>

ep

'

3 Lj e .

, Lj , ,

, ,

i.: ..- . a ,

,

';

,,

9 _( g

k I , F ,

' '

.

.e JIn; Reply Reir To:  ;. ,

-

7

Docket
50-285/88-22- -

,

LEA 88-201' .

-

_ , :n v

i 4 ,

'0maha Public Power District J

ATTN:' Mr. skenneth J. Morris

. Division Manager-Nuclear' Operations-

1623 Harney Street

Omaha, Nebraska '68102 _ .-

, ,

Gentlemen:

This refers ta the inspectio'n conducted.by Messrs. P. H. Harrell and T.1Reis-of?

this office during the period June.29.through July'18, 1988, of activities

authorized by NRC Operating License DPR-40 for the Fort Calhoun Station, and to:

. the discussion of our findings with Mr.' L. T; KJsek;(Acting Plant Manager)' and

other members of your staff at the conclusion of the inspection. .

'

The area examined during this inspection was 'a . followup ~on your staff's l .

finding that the limiting condition .for operation for-excore monitoring of

linear heat rate and the thermal margin / low pressure trip setting-of the reactor

protection system were in error. Within this area, the. inspection consisted of' >

selective examination of the Technical Specifications ~, interviews with-

personnel, and observations made by the NRC. inspectors. The'inspecticn findin'gs

are documented in the enclosed inspection report. -

m

.

As a result of this inspection, it was found that certain ofiyour, activit'tes; L:

-

appeared to be in violation of NRC requirements. :As discussed.in the telephone.  !

conversation between Mr. T. F. Westerman and Mr. J. 'd._ Fisicaro of your staff.. a

we have scheduled an enforcement conference in our Region IV office:at 1 p.m. ' .

d

on August 11, 1988, to discuss your understanding of these: apparent violations,. 1

the reasons for occurrences, and your correcti.ve. actions ,We will also discuss.

the enforcement policy, if appropriate. An' agenda for this meeting'is: enclosed. ,

j

1

Should you have any questions concerning this inspection, we will be pleased to I

discuss them witn you.

Sincerely,

hACb

L. J. Callan, Director

Division of Reactor Projects u

F Enclosures: (seenextpage) '

,

'

.

,

RIV:RI SRIk PE C:DRP/BI 0: R 'E ..

TReis/nc PHHarrell RPMullikin TFWesterman' LJ aTlan - G , n

g/44/88 g/3/88

9 /) /g.1/88 q/M/88 ]//g/88 'l~Bf(/88' .

g88 MBS S@hk? , .

'

  • "

.

m

.

-,,, . . . _ _ _ . . . . . _ . . . _ . . _ . . _ , _ _ - . _ . , o. _ mm . ,g. _ $8DV . , _ , _

_ . _ . - ~. . . .

3

' '

, 1,- ,

O t __r'.

  • ?

. . ,

Omaha Public Power District -2-

.

Fnclosures: .

,-  % 1. Appendix A - NRC Inspection Report _ '

" , 50-285/88-22

2.. Appendix B - Meeting Agenda

cc w/ enclosures:

W. G. Gates, Manager ,

Fort Calhoun Station

P. O. Box 399

Fort Lalhoun, Nebraska 68023

Harry H. Voigt, Esq.

LeBoeuf, Lamb, Leiby & MacRae

1333 New Hampshire Avenue, NW

Washington, DC' 20036

Nebraska Radiation Control Program Director

bec to DMB (IE01)

bec distrib. by RIV:

R.D. Martin, RA *RPB-DRSS

  • Section Chief (DRP/B) * MIS System

.RIV File

  • DRP
  • RSTS Operator *ProjectEngineer,DRP/B

Lisa Shea, RM/ALF *T. Bournia, NRR. Project Manager

  • DRS G. F. Sanborn, E0
  • RRI
  • w/766

.l

l

,

.l

.,  ;

I

,

I

,

l

4