ML20151R861
| ML20151R861 | |
| Person / Time | |
|---|---|
| Site: | Arkansas Nuclear |
| Issue date: | 04/21/1988 |
| From: | Callan L NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV) |
| To: | Campbell G ARKANSAS POWER & LIGHT CO. |
| Shared Package | |
| ML20151R866 | List: |
| References | |
| NUDOCS 8804280113 | |
| Download: ML20151R861 (2) | |
See also: IR 05000313/1988009
Text
'
'
.-
APR 21 1988
.
.
.
$nReplyReferTo:
Dockets:
50-313/88-09
50-368/88-09
Arkansas Power & Light Company
ATTN:
Mr. Gene Campbell
Vice President, Nuclear
Operations
P.O. Box 551
Little Rock, Arkansas 72203
Gentlemen:
This refers to the inspection conducted by Mr. N. M. Terc of-this office and
other accompanying personnel during:the period March 22-24, 1988, of activities
authorized by NRC Operating Licenses DPR-51 and NPF-6, for Arkansas Nuclear
One, Units 1 and 2, and to the discussion of our findings with you and members
of your staff after the inspection.
Areas examined during the inspection included implementation of the emergency
plan and procedures during the annual emergency response exercise. Within
these areas, the inspection consisted of selective examination of procedures
and representative records, ir.terviews with personnel, and observations by the
NRC inspector.
The inspection findings are documented in-the enclosed
inspection report.
Within the scope of the inspection, no violations or deviations were
identified.
'
l
The enclosed report identifies two deficiencies in your emergency preparedness
program.
You are requested to provide this office a schedule for correcting
these deficiencies within 30 days after receipt of this letter.
1
We have also examined actions you have taken with regard to previously
identified inspection findings.
The status of these items is identified in
paragraph 2 of the enclosed report.
Should you have any questions concerning this inspection, we will be pleased to
discuss them with you.
'
Sincerely,
O&inal kned Sp
A. B. DEACH
'
L. J. Callan, Director
-
Division of Reactor Projects
,
Enclosure:
(see next page)
[
RIV:NMEP
C: NMEPBr)
D:DRP/A
D: )
NMTerc;df
WLFighet'
DDChamberlain = LJ:
W
l{ ljk88
l{ llH88
$ll9 /88
.
1 n /88
/
'
1\\
8804280113 880421
{DR
ADOCK 05000313
I
'
.
y
- 7;
-
~
l'
. L 4',
.
r
r
,
.
.,
.
.
"
,
-
Arkansas Power & Light Company
--2-
,
,
j
Enclosure:
Appendix
NRC Inspection. Report.
'
50-313/88-09
-
'
50-368/88-09
, ' '
cc w/ enclosure:
Arkansas Nuclear One
ATTN:
J. M. Levine,' Director a
-
Site Nuclear Operations
P.O. Box 608
Russellville, Arkansas 72801
Chief, Technological Hazards Branch-
FEMA Region 6
Federal Center.
800 North Loop 288
Denton, Texas 76201-3698
Arkansas Radiation Control Program Director
i
s
"
bec to DMB (IE35)
,
bec.distrib. by RIV:
- RRI
R. D. Martin, RA
.
- Section Chief (DRP/A)
Lisa Shea, RM/ALF
T
- RIV File
- MIS System
<!
- RSTS Operator
- Project Engineer, DRP/A
4
- G. Dick, NRR Project Manager
NMEPB
",.
- R. Hall
G. F. Sanborn
"
R. Bangart
D. B. Matthews, NRR
- W. L. Fisher
N. Terc
DRS'
- w/766
l
i
I
4
1
4
i
/
v
..--
-... . -..----------->a