ML20151R861

From kanterella
Jump to navigation Jump to search
Forwards Insp Repts 50-313/88-09 & 50-368/88-09 on 880322-24.No Violations or Deviations Noted
ML20151R861
Person / Time
Site: Arkansas Nuclear  Entergy icon.png
Issue date: 04/21/1988
From: Callan L
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
To: Campbell G
ARKANSAS POWER & LIGHT CO.
Shared Package
ML20151R866 List:
References
NUDOCS 8804280113
Download: ML20151R861 (2)


See also: IR 05000313/1988009

Text

'

'

.-

APR 21 1988

.

.

.

$nReplyReferTo:

Dockets:

50-313/88-09

50-368/88-09

Arkansas Power & Light Company

ATTN:

Mr. Gene Campbell

Vice President, Nuclear

Operations

P.O. Box 551

Little Rock, Arkansas 72203

Gentlemen:

This refers to the inspection conducted by Mr. N. M. Terc of-this office and

other accompanying personnel during:the period March 22-24, 1988, of activities

authorized by NRC Operating Licenses DPR-51 and NPF-6, for Arkansas Nuclear

One, Units 1 and 2, and to the discussion of our findings with you and members

of your staff after the inspection.

Areas examined during the inspection included implementation of the emergency

plan and procedures during the annual emergency response exercise. Within

these areas, the inspection consisted of selective examination of procedures

and representative records, ir.terviews with personnel, and observations by the

NRC inspector.

The inspection findings are documented in-the enclosed

inspection report.

Within the scope of the inspection, no violations or deviations were

identified.

'

l

The enclosed report identifies two deficiencies in your emergency preparedness

program.

You are requested to provide this office a schedule for correcting

these deficiencies within 30 days after receipt of this letter.

1

We have also examined actions you have taken with regard to previously

identified inspection findings.

The status of these items is identified in

paragraph 2 of the enclosed report.

Should you have any questions concerning this inspection, we will be pleased to

discuss them with you.

'

Sincerely,

O&inal kned Sp

A. B. DEACH

'

L. J. Callan, Director

-

Division of Reactor Projects

,

Enclosure:

(see next page)

[

RIV:NMEP

C: NMEPBr)

D:DRP/A

D: )

NMTerc;df

WLFighet'

DDChamberlain = LJ:

W

l{ ljk88

l{ llH88

$ll9 /88

.

1 n /88

/

'

1\\

8804280113 880421

{DR

ADOCK 05000313

I

'

DCD

.

y

- 7;

-

~

l'

. L 4',

.

r

r

,

.

.,

.

.

"

,

-

Arkansas Power & Light Company

--2-

,

,

j

Enclosure:

Appendix

NRC Inspection. Report.

'

50-313/88-09

-

'

50-368/88-09

, ' '

cc w/ enclosure:

Arkansas Nuclear One

ATTN:

J. M. Levine,' Director a

-

Site Nuclear Operations

P.O. Box 608

Russellville, Arkansas 72801

Chief, Technological Hazards Branch-

FEMA Region 6

Federal Center.

800 North Loop 288

Denton, Texas 76201-3698

Arkansas Radiation Control Program Director

i

s

"

bec to DMB (IE35)

,

bec.distrib. by RIV:

  • RRI

R. D. Martin, RA

.

  • Section Chief (DRP/A)

Lisa Shea, RM/ALF

T

  • RIV File
  • MIS System

<!

  • RSTS Operator
  • Project Engineer, DRP/A

4

  • G. Dick, NRR Project Manager

NMEPB

",.

  • R. Hall

G. F. Sanborn

"

R. Bangart

D. B. Matthews, NRR

  • W. L. Fisher

N. Terc

DRP

TSS

DRS'

  • w/766

l

i

I

4

1

4

i

/

v

..--

-... . -..----------->a