ML20151R555

From kanterella
Jump to navigation Jump to search
Forwards Revised Emergency Plan Implementing Procedures, Including Rev 6 to Station Directive 3.0.7 Re Site Assembly/ Evacuation.Privacy Matl Should Be Deleted from Procedures Before Placement in PDR
ML20151R555
Person / Time
Site: Catawba  Duke Energy icon.png
Issue date: 01/30/1986
From: Tucker H
DUKE POWER CO.
To:
NRC OFFICE OF ADMINISTRATION (ADM)
Shared Package
ML20151R558 List:
References
NUDOCS 8602060129
Download: ML20151R555 (2)


Text

DUKE POWER GoxPANY P.O. IsOX 31180 CHAMLOTTE N.C. 28242 HALB.TUCKEW TEd.rrestim e (70 s) 373 -6s3:

== rea January 30, 1986 Document Control Desk U. S. Nuclear Regulatory Commission Washington, D. C.

20555 Re:

Catawba Nuclear Station Docket Nos. 50-413 and 50-414 a

Dear Sir:

Enclosed for NRC Staff use and review are two copies of the latest revision to the following Catawba Nuclear Station Emergency Plan Implementing. Procedures:

1)

Station Directive 3.0.7, Revision 6 2)

Station Directive 3.8.4, Revision 14 3)

HP/0/B/1000/06 Please delete privacy material in the form of personal telephone numbers prior to placing any material in the public document room, specifically:

1)

Station Directive 3.0.7, These revisions are being submitted in accordance with 10 CFR 50.54(q) and do not decrease the effectiveness of the Emergency Plan Implementing Procedures.

By copy of this letter, one copy ~of each of the above documents is being provided to the NRC, Region II.

Very truly yours, l

7 Hal B. Tucker RWO: sib j~yI I Enclosures k

gaogggg gMajyy F

7-Document Control Dack

~ January 30, 1986 Page Two cc:

(w/ enclosure)

Dr.

J.. Nelson Grace, Regional Administrator U. S. Nuclear Regulatory Commission Region II 101 Marietta Street, NW, Suite 2900 Atlanta, Georgia 30323 (w/o enclosure)

NRC Resident Inspector Catawba Nuclear Station

,i f

d e