ML20151R202

From kanterella
Jump to navigation Jump to search
Forwards Response to Util 871201 & 17 Requests Re Staff Hour Breakdowns & Contractual Costs for Plant.Response to Two Questions Identified in Encl
ML20151R202
Person / Time
Site: South Texas  STP Nuclear Operating Company icon.png
Issue date: 08/05/1988
From: Holloway C
NRC OFFICE OF ADMINISTRATION & RESOURCES MANAGEMENT (ARM)
To: Wisenburg M
HOUSTON LIGHTING & POWER CO.
References
CON-FIN-A-0245, CON-FIN-A-0409, CON-FIN-A-0413, CON-FIN-A-2104, CON-FIN-A-2106, CON-FIN-A-2115, CON-FIN-A-245, CON-FIN-A-3363, CON-FIN-A-409, CON-FIN-A-413, CON-FIN-A-6270, CON-FIN-A-6415, CON-FIN-A-6458, CON-FIN-B-0001, CON-FIN-B-0725, CON-FIN-B-1, CON-FIN-B-2340, CON-FIN-B-6588, CON-FIN-B-725, CON-FIN-B-8020 NUDOCS 8808120089
Download: ML20151R202 (18)


Text

. ,

- g3 SW Docket Nos. 50-498/499 Houston Lighting and Power Lompany

' Attn: Mr. M. R. Wisenburg Manager, Engineering and Licensing-P.O. Box 1700 Houston, Texas 77001 Gentlemen:

Your letters dated December 1 and 17,1987, requested:

a. A breakdown of professional staff review hours by reviewers and offices for the period of June-24,1984 through December 20, 1986, that were billed on Invoices G0269 (UnitNo.1)andG0270(UnitNo.2). These invoices were dated November 4, 1987.
b. An itemized list of contractual cnsts for the entire review period from CP w uances in 1975 through December 20, 1986,for each unit.

Enclosures 1 and 2 are in response to the above items "a" and "b". You will note from item "a" that for the six-month cycle ending December 20, 1986, there were 1,496.1 hours1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> indicated as being billable as OL review for Unit No. 1, but not. billed. Since Unit No. I has received an operating license and your Company has paid the $3,077,400 maximum fee, these hours will not be billed to Houston Lighting and Power, but we will add the sum of $92,758 ($62 X 1496.1) to the OL review cost records when we compute the cost for OL review through the issuance of the 100%

OL on March 22, 1988. Our November 4,1987 letter informed you that the Unit No. 1 OL review cost through December 20, 1986, was $5,011,077.

When the $92,758 is added to that, the cost through December 20, 1986, becomes $5,103,835 for Unit No. 1.

On Enclosure 2, we note that there is a total of $27,616 in contractual costs under FIN Number 80796 for Unit No. 2 relating to operator examinations for the period of June 1984 through December 1985. We are checking these costs further to determine if they should be far Unit No.1 in lieu of Unit No. 2. If we find-that they were erroneously reported to Unit No. 2, we will give credit for these costs on the next invoice for Unit No. 2 which will be for the six-month cycle that ended December 1987.

In addition to the above requests, your December 17, 1987 letter requested responses to two questions. The questions and our answers to them are as follows:

D 8808120089 880805 1 PDR ADOCK 05000498 \

P PDC

... - . -~ .- - -,

.1 y

AUG 5 1908

1. What is the' basis for the billable rate per hour and provide detail as to how this rate is developed?

Answer: Enclosed is a copy of NUREG-0268 which shows the basis for the hourly rate and how it was-developed for the rule change that became effective March 23, 1978. While NRC did not publish a NUREG document for the rates in the current 10 CFR 170.20, the same method set forth in NUREG-0268 was used.

2. What is the basis for the cost allocation between units for the various contracts?

Answer: _The Comissiori's established policy on allocations between units for the various contracts for cases under OL review has always been that where contractual services are determined by review staff to be fully applicable to each unit, the costs are split equally. When a review item is considered to be pertinent to a particular unit only, the costs are assessed against that unit.-

In filling your requests, every effort was made to be as specific and complete as possible for the types of details requested. We hope that the infonnation being provided will satisfy your needs.

Sincerely, 81gudbjs Reau.olas C. James Holloway, Jr. , Chief License Fee Management 8 ranch Division of Accounting and Finance Office of Administration and Resources Management

Enclosures:

1. Staff Hour Breakdowns forUnits1and2(355pages)
2. Contractual Costs for Units 1 and 2 (15 pages)
3. NUREG-0268 CERTIFIED MAIL RETURN RECEIP_T REQUESTED OFFICE : /l SURNAME: RMDiggs:ab dB JHollosay DATE  : 8/5 /88 8/5/88

J,1 -- v. . .

g : .

AUS 5 W f

.Dist, w/o encl:

PDR LPDR

-r$ Regul a tory l: Docketi F11 es r;5,0.398/499d/encit: 2 *-

LFMB A/M for 50-498/499' w/ Portions of Encl. 1 and all'of encl.2 GJohnson, DAF-CJHolloway, . LFMB RMDiggs, LFMB RVillafranco, NRR - w/ encl.'2

.LFMBR/F(2)

ARM /DAF R/F

.DW/RMD/ Houston Lighting & Power 7/25/88 E

A i

(

((l '

I t

I i

.1

..f. .h.by'-fj hr s, y

, m, .~W g'tu,x.,,,,xg, l

hb5-w ..

a

[~ S Vf S s L dyhxf ,.a ,k e, h k Contractor Abbreviations l

ANL -

Argonne National Laboratory.

BNL ,- Brookhaven flational Laboratory INEL -

Idaho National Energy Laboratory l

l l

LLNL -

Lawrence Livennore National Laboratory

)

ORNL -

Oak Ridge National Laboratory f PNL -

Pacific Nor'hwest Laboratory GAGB -

Gage-Babcock & Associates, Inc.

ZSAI -

Science Applications, Inc.

BEA -

Bureau of Economic Analysis, Dept. of Commerce 1

SONA -

Sonalist, Inc.

l

/

South Texas Nuclear Power Plant #1 (50-498)

Timeframe: CP Issuance - 5/84 FIN # Costs Contractor Type of Work Written Products A0245^ $ 39,000 LLNL Contair. ment Systems Review I A0409N $ 21,780 LLNL Power System Reviews .

A04131 $ 48,000 LLNL Control Room Design Review None A2104\ $ 40,300 ANL Confirmatory Report on Piping Analysis TER for Feedwater Line A2106% 5 24,200 AHL Instrumentation and Control System Draf t SER on Ch. 8 & 9 Review III A2115' $ 19,650 ANL Power System Review II -

A3363) $ 12,962 BNL LWR Systems Corrosion Program TER A6270/ $ 30,775 INEL FSAR Review - Reactor Systems RAI A6415d $ 589 1NEL Equipment Qualification Review A6458 7 $ 16,932 INEL FSAR Section 5 & 16 SER Input B0001A $ 42,228 ORNL Environmental Review for Preliminary Draft of Environmental Statement B0725 % $ 40,121 ORNL Elec. & Mech. Systems and Related FSAR Sections B234 M $ 10,300 PNL FSAR Amendment - Chapter 14 - Plant Test Program TER B6588 d S I,401 GAGB Fire Protection Program Review B8020 S 189 GAGB Fire Protection Program Review

$348,427 - Amount Billed From Issuance of CP Through 9/30/83.

. B8020 $ 205 GAGB Fire Protection Program Review)

A6457 $ 2,885 INEL Control of Heavy Loads ) = $3,590 from 10/1/83 Through 5/31/84 B2544 S 500 PNL FSAR Review )

N

South Texas Nuclear Powtr Plant #1 (50-498)

Timeframe: 6/84 - 11/84 FIN # Costs Contractor Type of Work Written Products A0446 S 8,800 LLNL DCRDR Audit TER A6415 5 9,831 INEL Preaudit Review for QA (Thompson Valves) ,

A6457 5 1,549 INEL Case Review for Control of Heavy Loads TER A6458 5 9,171 INEL Review of FSAR for PSI & NDE (Amend. 40) RAI A9463 $ 3,622 ORNL Computer Plots of Population Density / Counts Computer Plots B2340 $ 900 PNL FSAR Amendment B2544 5 300 PNL FSAR Review -

None B8011 $ 14 ZSAl GL 83-28 Review TER B8020 $ 421 GAGB Fire Protection Program Review

$34,608 - Amount Billed for 6/84 - 11/84

South Texas Nuc!e'r Pow:r Plant #1 (50-498)

Timeframe: 12/84 - 5/85 FIN # Costs Contractor Type of Work Written Products A6457 $ 333 INEL Control of Heavy Loads A6458 $ 8,330 INEL Fracture Toughness Reviews , Revised SER A6818 5 418 INEL Review of Additional Info. on GL 83-28 RAI Items 4.2.1 and 4.2.2 19463 $ 2,702 ORNL Computer Plots of Population Density / Counts Computer Plots B0747 5 2,576 ORNL Review of Design Documentation Letter Report 80790 $22,425 ORNL OL Staff EIS Input / Aquatic 5 Terrestrial EIS Input B2340 5 1,400 PNL FSAR Amendment TER B2537 $ 1,402 PNL Meteorological Data TER B2544 5 6,400 PNL FSAR Review None B8011 $ 3,747 ZSAI GL 83-28 Review TER

$49,733 - Amount Billed for 12/84 - f/85

, South Texas Nuclear Power Plant #1 (50-498)

Timeframe: 6/85 - 12/85 FIN,# Costs Contractor Type of Work Writte... rducts A0446 $ 996 LLNL Control Room Design Review A3702 $21,913 BNL Rev. of AFW System Reliability ,

Draft TER A3819 $24,636 BNL DES Fission Product Release Review & Evaluation of Information A6415 $ 5,034 INEL Pre-Audit Review for EQ TER A6457 $ 328 INEL Control of Heavy Loads None A6458 $12,295 INEL FSAR Review Draf t SER A6493 $13,891 INEL Review Deviations from RG 1.97 Draft TER A6498 5 3,263 INEL Exam Queltion Sank Development None and Implementation A6818 $ 1,528 INEL Review of Additional Info. on GL 83-28 Final Input to SER Items 4.2.1 and 4.2.2 A6824 $ 210 INEL Tech Spec. Evaluation A9463 5 23 ORNL Environmental Considerations None B0767 $13,528 ORNL Review of Design Documentation Letter Report 80785 $25,247 ORNL Reviev & Evaluate Accident Consequences letter Report B0790 $ 9,048 ORNL OL Staf f EIS Input / Aquatic & Terrestrial EIS Input B2340 $ 4,500 PNL FSAR Review None B2537 $ 1,799 PNL Meteorological Data TER 1

, South' Texas Nuclear Power Plant #1 (50-498)

Timeframe: 6/35 - 12/85 i

FIN # Costs, Contractor Type of Work Written Products B2544 5 1,300 PNL FSAR Review None B8011 $ 465 ZSAI GL 83-28 Review , TER R8678 $ 12,000 BEA Regional Economic Impact of Accidents EIS Input

$152,004 - Amount Billed for 6/85 - 12/85 e

4 d

1 1

1

South Texas Nuclear Power Plant #1 (50-498) l Timeframe: 1/86 -6 /86 FIN # Costs Contractor Type of Work Written Products A3702 $ 6,155 BNL Rev. of AFW System Reliability TER A3819 $ 1,348 BNL DES Fission Product Release . TER A6458 $ 1,051 INEL Review of Mechanized Ultransonic Exam. Plan SSER Input A6493 $ 3,266 INEL Prepare Final TER of Review of RG 1.97 TER A6811 $28,175 INEL IST Review & Meeting RAI/ Meeting / Trip Report B0790 $ 8,739 ORNL OL Stage EIS Input / Aquatic & Terrestrial EIS Input 82340 $ 1,600 PNL FSAR Review -

None B2537 $ 1 PNL Meteorogolical Data None B2544 $ 900 PNL FSAR Review None D6002 $ 1,273 INEL Review Compliance with GL 83-28, Items 3.1.3 TER and 3.2.3 06016 $ 5,119 INEL SER Open Item Review (Ef fort Transferred to D6019

$57,627 - Amount Billed for 1/86 - 6/86

'd

South Texas Nuclear Power Plant 01 (50-498)

Timef rame: 7/86 - 12/86 Costs Contractor Type of Work Written Products FI_N #

A3702 5 12 BNL Rev. of AFW System Reliability Technical Evaluation Report (TER)

EQ Pre-Audit Meeting /FSAR Question / Response Site Visit Report A6415 $80,882 INEL Review A6458 $ 6,474 INEL Plant Site NDE Meeting / Final Review of PSI Trip Report Program A6493 $ 6,819 INEL Review of Additional Submittals from Applicant Revised TER on RG 1.97

$ 2,183 INEL Exam Question Bank Development - None 4

A6498 and Implementation

$15,172 INEL IST Program Resubmittal TER A6811 534 INEL Tech. Spec. Evaluation Ncne A6824 5 200 PNL SAR Chapter 14 None B2380 $

2 PNL Meteorological Data None B2537 $

~

01332 $ 8,391 SONA Operator Examinaticn Preparation Exam Admin. .

On-Site 1/5/87

$ 2,359 INEL Review Compliance with GL 85-28, Item 2.1 TER's 06002 D5005 $ 9,404 INEL NUREG-0737, Item II.D.1, Relief Valve & TER SRV Operability i

j

South Texas Nuclear Power Plant 01 (50-498)- .h Timeframe: 7/86 - 12/86 _

FIN # Costs Contractor Type of Work Written Products D6019 5 21,254 INEL Review SER Chapters /QDPSR Review SER Input /TER D6016 $ 87 INEL Review of SER Open Items , None D6018 $ 24 INEL ATWS None

$153,797 - Amount Billed for 7/86 - 12/86 L

South Texas teclear Power Plant 02 (50-499)

Timeframe: CP Issuance - 5/84 FfN # Costs Contractor Type of Work Written Products A0245 $39,000 LLNL Containment Systems Review I A0409 521,780 LLNL Power Systems Review ,

A2104 $40,300 ANL Confirmatory Report on Piping Analysis TER for Feedwater Line A2106 524,200 ANL Instrumentation and Control System Review Draft SER A2115 $19,650 ANL Power Systems Review A3363 $12,962 BNL LWR System Corrosion Program A6270 $30,775 INEL FSAR Review - Reactor Systems RAI i

A6415 $ 589 INEL Equipment Qualification Review

~

B0001 $ 42,228 ORNL Environmental Review B0725 $ 40,121 ORNL Elec. & Mech. Systems Review and related FSAR Sections B2340 $ 10,300 PNL FSAR Amendment TER B6588 $ 1,401 GAGB Fire Protection B8020 $ 175 GAGB Fire Protection Program Review

$283,481 - Amount Billed From CP Issuance Through 9/30/83 RS457 2,424 INEL Control of Heavy Loads for period from 10/1/83 Through 5/31/84 w\ _

e-. ---_ .

South Texas Kuclear' Power Plant #2'(50-499)- ,

~

Timeframe: 6/84 - 11/84 ..

-f W

FIN # t,osts Contra ctor Type of Work Written Products B0796 $26,362 ORNL Operator Exam Program Written Exam

$26,362 - Amount Billed for 6/84 - 11/84 2 l

l i

L

/ *

=

L

~5 L

D

[

i t

t

'i v

-i

ll

. . . r s

t c

u d

o r

P t r

n o p

e .

t e t R _

._ i r r W e t

t e -

L

)

9 9

4 0

5

( 5 m 8 a 2 / n r .

  1. 5 o g i o t - t r n a P a 4 t l 8 k r

n m P / e a 2 o m x r 1 W u E e c w f o r 5 o  : o D o 8 P e t /

m e n a 5 r a p g r a r y i e -

e f T s p l e e O 4 c m D 8 u i o /

N T f t 2

- o 1

. s d a w e r x e t o e i a f T v l e e d h R R e t l u l o i S B t

r n o u t o c L L m a N N A r R R t O O -

C n

o 6 1 7 s 7 1 8 t

s 5, 0, 5, o 2 1 3 C

  1. 7 6 4 9 N 7 7 I 0 0 F B B Y

f 1 1l l! l

. 4

. ap - .a.-

South Texas Nuclear Powar Plant #2 (50-499)

Timeframe: 6/85 - 12/85 FIN # Costs Contractor Type of Work Written Products A6457 5 328 INEL Control of Heavy Loads None A6493 513,889 INEL Prepare Final TER for Review of RG 1.97 . TER B0747 $13,529 CRNL Review of Design Documentation Letter Report B0796 $ 243 ORNL Associated with Operator Exam. Program

$27,989 -Amount Billed for 6/85 - 12/85 5

i W

,.i~

.: r -

' ~

South Texas Nuclear Power Plant #2 (50-499).

~

Timeframe: 1/86 - 6/86 FIN # Costs Contractor Type of Work Written ProdIicts A6493 $ 3,266 INEL Prepare Final TER of-Review of RG 1.97 TER

$ 3,266 - Amount Billed for 1/86 - 6/86 ,

G e

i l

s South Texas Nuclear Power Plant #2 (50-499) _ , . ,

-Timeframe: 7/86 - 12/86 i

FIN # Costs Contractor Type of Work Written Products '

! A6493- 5 1,654 INEL Review SPDS Isolation Device Submittals TER

$ 1,654 - Amount Billed - for 7/86 - 12/86 ,