Forwards Response to Util 871201 & 17 Requests Re Staff Hour Breakdowns & Contractual Costs for Plant.Response to Two Questions Identified in EnclML20151R202 |
Person / Time |
---|
Site: |
South Texas ![STP Nuclear Operating Company icon.png](/w/images/9/9c/STP_Nuclear_Operating_Company_icon.png) |
---|
Issue date: |
08/05/1988 |
---|
From: |
Holloway C NRC OFFICE OF ADMINISTRATION & RESOURCES MANAGEMENT (ARM) |
---|
To: |
Wisenburg M HOUSTON LIGHTING & POWER CO. |
---|
References |
---|
CON-FIN-A-0245, CON-FIN-A-0409, CON-FIN-A-0413, CON-FIN-A-2104, CON-FIN-A-2106, CON-FIN-A-2115, CON-FIN-A-245, CON-FIN-A-3363, CON-FIN-A-409, CON-FIN-A-413, CON-FIN-A-6270, CON-FIN-A-6415, CON-FIN-A-6458, CON-FIN-B-0001, CON-FIN-B-0725, CON-FIN-B-1, CON-FIN-B-2340, CON-FIN-B-6588, CON-FIN-B-725, CON-FIN-B-8020 NUDOCS 8808120089 |
Download: ML20151R202 (18) |
|
|
---|
Category:CORRESPONDENCE-LETTERS
MONTHYEARNOC-AE-000675, Forwards Clarification on Items Included in 990531 Response to RAI Re Proposed License Amend Associated with Operator Action for Sbloca,As Requested1999-10-21021 October 1999 Forwards Clarification on Items Included in 990531 Response to RAI Re Proposed License Amend Associated with Operator Action for Sbloca,As Requested NOC-AE-000680, Forwards Rev 5 to 0PGP03-ZV-0001, Severe Weather Plan1999-10-20020 October 1999 Forwards Rev 5 to 0PGP03-ZV-0001, Severe Weather Plan NOC-AE-000683, Forwards 30-day Rept Concerning Significant Changes to Accepted Large Break Loss of Coolant Accident ECCS Evaluation Model for South Tx Project,Units 1 & 2,IAW 10CFR50.46(a)(3)(ii)1999-10-19019 October 1999 Forwards 30-day Rept Concerning Significant Changes to Accepted Large Break Loss of Coolant Accident ECCS Evaluation Model for South Tx Project,Units 1 & 2,IAW 10CFR50.46(a)(3)(ii) ML20217K9341999-10-15015 October 1999 Forwards SER Accepting Util 990609 Relief Request RR-ENG-2-4 for Relief from ASME Code,Section XI, Nondestructive Exam Requirements Applicable to Stp,Units 1 & 2,reactor Vessel Closure Head Nuts ML20217K9091999-10-15015 October 1999 Forwards SER Accepting Util 990609 Relief Request RR-ENG-2-3 from ASME Code,Section Xi,Nondestructive Exam Requirements Applicable to South Texas Project,Units 1 & 2, Pressurizer Support Attachment Welds 05000498/LER-1999-008, Forwards LER 99-008-00 Re Turbine Trip That Occurred While Performing Main Turbine Emergency Trip Test.Commitments Made by Licensee Are Listed in Corrective Actions Section of LER1999-10-12012 October 1999 Forwards LER 99-008-00 Re Turbine Trip That Occurred While Performing Main Turbine Emergency Trip Test.Commitments Made by Licensee Are Listed in Corrective Actions Section of LER NOC-AE-000674, Forwards Requested Estimates of Needs for Operator Licensing Exams,Per AL-99-03, Operator Licensing National Exam Schedule1999-10-12012 October 1999 Forwards Requested Estimates of Needs for Operator Licensing Exams,Per AL-99-03, Operator Licensing National Exam Schedule NOC-AE-000625, Requests Partial Relief from ASME Section XI Visual Exam Requirements of IWA-5242(a).Relief Request Is Based on Provisions of Draft ASME Section XI Code Case N-616,which Is Expected to Be Published in Near Future1999-10-0707 October 1999 Requests Partial Relief from ASME Section XI Visual Exam Requirements of IWA-5242(a).Relief Request Is Based on Provisions of Draft ASME Section XI Code Case N-616,which Is Expected to Be Published in Near Future NOC-AE-000610, Requests Relief from ASME Section XI Code Nondestructive Exam Requirements of IWA-5250(a)(2) for Second Inservice Insp Interval,Per Provisions of 10CFR50.55a(3)(i)1999-10-0707 October 1999 Requests Relief from ASME Section XI Code Nondestructive Exam Requirements of IWA-5250(a)(2) for Second Inservice Insp Interval,Per Provisions of 10CFR50.55a(3)(i) NOC-AE-000653, Requests Relief from ASME Section XI Code Requirements of Table IWE-2500-1 for VT-3 Visual Exam of Seals & Gaskets on Airlocks,Hatches & Other Devices Required to Assure Containment leak-tight Integrity,Per 10CFR50.55a(a)(3)(i)1999-10-0707 October 1999 Requests Relief from ASME Section XI Code Requirements of Table IWE-2500-1 for VT-3 Visual Exam of Seals & Gaskets on Airlocks,Hatches & Other Devices Required to Assure Containment leak-tight Integrity,Per 10CFR50.55a(a)(3)(i) ML20217C3221999-10-0707 October 1999 Forwards Insp Repts 50-498/99-16 & 50-499/99-16 on 990808-0918.No Violations Noted.Insp Generally Characterized by safety-conscious Operations,Sound Engineering & Maint Practices & Careful Radiological Work Controls 05000499/LER-1999-006, Forwards LER 99-006-00,re Entry Into TS 3.0.3.Licensee Commitments Listed in Corrective Actions Section of Attachment1999-09-30030 September 1999 Forwards LER 99-006-00,re Entry Into TS 3.0.3.Licensee Commitments Listed in Corrective Actions Section of Attachment ML20212L1651999-09-30030 September 1999 Responds to STP Nuclear Operating Co 981012 & s Which Provided Update to TS Bases Pages B 3/4 8-14 Through B 3/4 8-17.NRC Staff Found Change Consistent with TS 3/4.8.2 DC Sources. Staff Found & Deleted Typographical Error NOC-AE-000664, Forwards Rev 1 to STP Electric Generating Station Unit 1 Cycle 9 COLR & Rev 1 to STP Electric Generating Station Unit 2 Cycle 7 Colr1999-09-30030 September 1999 Forwards Rev 1 to STP Electric Generating Station Unit 1 Cycle 9 COLR & Rev 1 to STP Electric Generating Station Unit 2 Cycle 7 Colr ML20212J7141999-09-29029 September 1999 Forwards Insp Repts 50-498/99-15 & 50-499/99-15 on 990920-24 at South Texas Project Electric Generating Station.No Violations Noted.Insp Covered Requalification Training Program & Observation of Requalification Activities NOC-AE-000646, Informs NRC That STP Nuclear Operating Co Is Y2K Ready IAW Nei/Nusmg 97-07 Guidelines & Also Provides Response to NRC Ltr1999-09-28028 September 1999 Informs NRC That STP Nuclear Operating Co Is Y2K Ready IAW Nei/Nusmg 97-07 Guidelines & Also Provides Response to NRC Ltr ML20212J0651999-09-27027 September 1999 Discusses Licensee 980330 Response to GL 97-06, Degradation of SG Internals. Concludes That Response to GL Provides Reasonable Assurance That Condition of SG Internals in Compliance with Current Licensing Bases for Facility ML20212F1791999-09-24024 September 1999 Discusses 990923 Meeting Conducted in Region IV Ofc Re Status of Activities to Support Confirmatory Order, ,modifying OL & to Introduce New Director,Safety Quality Concerns Program.List of Attendees Encl ML20212E9091999-09-23023 September 1999 Discusses GL 98-01, Year 2000 Readiness of Computer Sys at Npps, Supplement 1 & STP Nuclear Operating Co Response for STP Dtd 990629.Understands That at Least One Sys or Component Listed May Have Potential to Cause Transient ML20212F2111999-09-22022 September 1999 Forwards Review of SG 90-day Rept, South Texas Unit-2 Cycle 7 Voltage-Based Repair Criteria Rept, Submitted by Util on 990119 NOC-AE-000633, Forwards Rev 3 to SG-99-04-005, STP 1RE08 Outage Condition Monitoring Rept & Final Operational Assessment. Rept Satisfies Reporting Requirements of NEI 97-06,dtd Dec 19971999-09-21021 September 1999 Forwards Rev 3 to SG-99-04-005, STP 1RE08 Outage Condition Monitoring Rept & Final Operational Assessment. Rept Satisfies Reporting Requirements of NEI 97-06,dtd Dec 1997 NOC-AE-000634, Forwards Addl Info Re GL 95-07, Pressure Locking & Thermal Binding of Safety-Related Povs. MOV design-basis Review Checklist,Encl1999-09-21021 September 1999 Forwards Addl Info Re GL 95-07, Pressure Locking & Thermal Binding of Safety-Related Povs. MOV design-basis Review Checklist,Encl NOC-AE-000649, Forwards Current Annual Financial Data for STP Electric Generating Station Per 10CFR50.71(b),acting on Behalf of Central Power & Light Co,City of Austin,Tx,City Public Svc Board of San Antonio & Hl&P1999-09-21021 September 1999 Forwards Current Annual Financial Data for STP Electric Generating Station Per 10CFR50.71(b),acting on Behalf of Central Power & Light Co,City of Austin,Tx,City Public Svc Board of San Antonio & Hl&P 05000499/LER-1999-005, Forwards LER 99-005-00,re Esfa Following Loss of Power to Standby Transformer 2 Due to Electrical Fault.Licensee Commitments Are Listed in Corrective Actions Section of LER1999-09-20020 September 1999 Forwards LER 99-005-00,re Esfa Following Loss of Power to Standby Transformer 2 Due to Electrical Fault.Licensee Commitments Are Listed in Corrective Actions Section of LER ML20212D9171999-09-16016 September 1999 Informs That on 990818,NRC Completed Midcycle PPR of South Texas Project & Identified No Areas in Which Performance Warranted Insp Beyond Core Insp Program.Details of Insp Plan Through Mar 2000 & Historical Listing of Plant Issues,Encl ML20216F5471999-09-15015 September 1999 Discusses 990914 Meeting Conducted at Region Iv.Meeting Was Requested by Staff to Introduce New Management Organization to Region IV & to Discuss General Plant Performance & Mgt Challenges IR 05000498/19990121999-09-14014 September 1999 Forwards Insp Repts 50-498/99-12 & 50-499/99-12 on 990816-19.Three Violations Occurred & Being Treated as Ncvs. Areas Examined During Insp Included Portions of Access Authorization & Physical Security Programs 05000498/LER-1999-007, Forwards LER 99-007-00 Re Train 'B' CR Makeup & Cleanup Filtration Sys Being Inoperable for Greater than Aot.Util Intends to Append Addl Info Section of LER with Brief Description of Test Results,Rather than Submit Separate LER1999-09-13013 September 1999 Forwards LER 99-007-00 Re Train 'B' CR Makeup & Cleanup Filtration Sys Being Inoperable for Greater than Aot.Util Intends to Append Addl Info Section of LER with Brief Description of Test Results,Rather than Submit Separate LER ML20211P8201999-09-0909 September 1999 Forwards SE Authorizing 990224 Submittal of First 10-year Interval ISI Program Plan - Relief Request RR-ENG-24,from ASME Section XI Code,Table IWC-2500-1 NOC-AE-000638, Forwards License Renewal Applications & Certifications of Medical Exam for Seven Listed Licensed Operators at Stp,Per 10CFR55.57.Encl Withheld,Per 10CFR2.790(a)(6)1999-09-0909 September 1999 Forwards License Renewal Applications & Certifications of Medical Exam for Seven Listed Licensed Operators at Stp,Per 10CFR55.57.Encl Withheld,Per 10CFR2.790(a)(6) ML20211P7671999-09-0909 September 1999 Forwards SER Authorizing Licensee 990517 Alternative Proposed in Relief Request RR-ENG-2-8 to Code Case N-491-2 for Second 10-year Insp Interval of South Texas Project, Units 1 & 2,pursuant to 10CFR50.55a(a)(3)(i) ML20211P7871999-09-0909 September 1999 Forwards Safety Evaluation Re First 10-yr Interval Inservice Insp Program Plan Request for Relief RR-ENG-31 IR 05000498/19990141999-09-0303 September 1999 Forwards Insp Repts 50-498/99-14 & 50-499/99-14 on 990627-0807.Apparent Violations Identified & Being Treated as Noncited Violations Consistent with App C of Enforcement Policy NOC-AE-000562, Requests Relief from Contruction Code non-destructive Exam Requirements for Repair/Replacement Activities During Second Inservice Insp Interval of Units 1 & 2,IAW Provisions of 10CFR50.55a(a)(3)(i)1999-08-31031 August 1999 Requests Relief from Contruction Code non-destructive Exam Requirements for Repair/Replacement Activities During Second Inservice Insp Interval of Units 1 & 2,IAW Provisions of 10CFR50.55a(a)(3)(i) ML20212A4351999-08-27027 August 1999 Discusses Investigation Rept OI-4-1999-009 Re Activites at South Texas Project.Oi Investigation Initiated in Response to Alleged Employment Discrimination Complaint. Allegation Not Substantiated.No Further Action Planned NOC-AE-000617, Forwards semi-annual Fitness for Duty Program Performance Rept for 990101-990630,IAW 10CFR26.71(d)1999-08-26026 August 1999 Forwards semi-annual Fitness for Duty Program Performance Rept for 990101-990630,IAW 10CFR26.71(d) ML20211J2511999-08-26026 August 1999 Discusses Proposed TS Change on Replacement SG Water Level Trip Setpoint for Plant,Units 1 & 2 NOC-AE-000585, Provides Notification That South Texas Project Has Completed Integrity Evaluation of Units 1 & 2 Reactor Coolant Pump Casings Required by Paragraph (D) of Code Case N-4811999-08-25025 August 1999 Provides Notification That South Texas Project Has Completed Integrity Evaluation of Units 1 & 2 Reactor Coolant Pump Casings Required by Paragraph (D) of Code Case N-481 ML20211F4421999-08-24024 August 1999 Forwards SE Authorizing Licensee 990513 Request for Relief RR-ENG-2-13,seeking Relief from ASME B&PV Code Section Xi,Exam Vessel shell-to-flange Welds for Second ISI Intervals ML20211F5031999-08-23023 August 1999 Forwards SE Authorizing Licensee 990315 Request for Relief RR-ENG-30,seeking Relief from ASME B&PV Code,Section Xi,Nde Requirements Applicable to Stp,Unit 2 SG Welds ML20212A4391999-08-17017 August 1999 Discusses Investigation Rept OI-4-1999-023 Re Activities at South Texas Project.Oi Investigation Initiated in Response to Alleged Employment Discrimination for Initiating Condition Report to Document Unauthorized Work Practices ML20210U1271999-08-16016 August 1999 Forwards Insp Repts 50-498/99-08 & 50-499/99-08 on 990517-21 & 0607-10.No Violations Noted.Corrective Action Program Was Reviewed ML20211A9501999-08-12012 August 1999 Discusses 990720-21 Workshop Conducted in Region IV Ofc,Re Exchange of Info in Area of Use of Risk Insights in Regulatory Activities.List of Attendees,Summary of Topic & Issues,Agenda & Copies of Handouts Encl ML20211B7881999-08-10010 August 1999 Transmits Summary of Two Meetings with Risk-Informed TS Task Force in Rockville,Md on 990514 & 0714 ML20210L1461999-08-0303 August 1999 Informs That NRC Plans to Administer Gfes of Written Operator Licensing Exam on 991006.Requests Submittal of Ltr Identifying Individuals Taking Exam,Personnel Allowed Access to Exams & Mailing Address for Exams NOC-AE-000603, Informs of Addition of Restriction to SRO License 42658, for KM Espinoza,Effective 990721,per 10CFR50.74.Encl Info Withheld,Per 10CFR2.790(a)(6)1999-07-29029 July 1999 Informs of Addition of Restriction to SRO License 42658, for KM Espinoza,Effective 990721,per 10CFR50.74.Encl Info Withheld,Per 10CFR2.790(a)(6) NOC-AE-000470, Forwards Amend 12 to STP Fire Hazards Analysis Rept. Summary of Changes Made Under Provision of 10CFR50.59 Also Encl1999-07-28028 July 1999 Forwards Amend 12 to STP Fire Hazards Analysis Rept. Summary of Changes Made Under Provision of 10CFR50.59 Also Encl NOC-AE-000599, Forwards STP Unit 1,Cycle 9 Startup Testing Summary Rept. No New Licensing Commitments Contained in Ltr1999-07-28028 July 1999 Forwards STP Unit 1,Cycle 9 Startup Testing Summary Rept. No New Licensing Commitments Contained in Ltr NOC-AE-000589, Forwards Rev to 1RE08 ISI Summary Repts for Repairs & Replacements & for Sys Pressure Tests,Corecting Date of End of Insp Interval Provided in Item 9 of from NIS-1 from 09/24/99 to 09/24/20001999-07-26026 July 1999 Forwards Rev to 1RE08 ISI Summary Repts for Repairs & Replacements & for Sys Pressure Tests,Corecting Date of End of Insp Interval Provided in Item 9 of from NIS-1 from 09/24/99 to 09/24/2000 ML20210F3851999-07-26026 July 1999 Forwards Exam Repts 50-498/99-301 & 50-499/99-301 on 990706- 15.Exam Included Evaluation of 9 Applicants for SO Licenses & 8 Applicants for RO Licenses 1999-09-09
[Table view] Category:NRC TO UTILITY
MONTHYEARML20062F8821990-11-15015 November 1990 Ack Receipt of 901017 Response to Violations Noted in Insp Repts 50-498/90-28 & 50-499/90-28 IR 05000498/19900101990-11-0909 November 1990 Ack Receipt of 900711 & 1003 Ltrs Informing NRC of Corrective Measures for Weaknesses Noted in Insp Repts 50-498/90-10 & 50-499/90-10 ML20062F8911990-11-0707 November 1990 Advises of Postponement of Soviet Delegation Visit to Plant Site Due to Unavailability of Seats on Aeroflot. Representatives Will Try Again to Obtain Seats in 2 Wks.Nrc May Reschedule Visit to Plant If Representatives Successful ML20216J9651990-11-0606 November 1990 Concludes That Actions Proposed in Util Response Met Intent of Generic Ltr 88-17, Loss of Dhr ML20062E3841990-11-0606 November 1990 Advises That 900914 Proposed Rev to Exam Schedule for Class 1 Nozzles Complies W/Asme Section XI Code XI-1-86-74 ML20058E2941990-11-0202 November 1990 Forwards Summary of Staff Understanding of Current Status of Generic Safety Issues Which Remain Unimplemented IR 05000498/19900311990-11-0101 November 1990 Discusses Insp Repts 50-498/90-31 & 50-499/90-31 on 900912- 21 & Forwards Notice of Violation IR 05000498/19900051990-10-31031 October 1990 Ack Receipt of 901001 Request for Extension of Corrective Action Implementation Date for Violations Noted in Insp Repts 50-498/90-05 & 50-499/90-05.Commitment to Implement Corrective Actions Prior to Aug 1991,acceptable ML20058A5941990-10-18018 October 1990 Requests Addl Info Re Review of Probability Safety Assessment of Facility ML20059M7001990-09-28028 September 1990 Forwards Insp Repts 50-498/90-27 & 50-499/90-27 on 900813-17.No Violations or Deviations Noted ML20059N7721990-09-24024 September 1990 Forwards Safety Evaluation Accepting Util First 10-yr Interval Inservice Insp Program Plan ML20059K9321990-09-18018 September 1990 Forwards Insp Repts 50-498/90-28 & 50-499/90-28 on 900730- 0808 & Notice of Violation.Violation Re Mixed Bed Demineralizer of Particular Concern Because Potential for Inadvertent Reactivity Not Mitigated ML20059J9971990-09-13013 September 1990 Forwards Info Re Generic Fundamentals Exam Section of Operator Licensing Written Exam to Be Administered on 901010 IR 05000498/19890471990-08-31031 August 1990 Ack Receipt of Informing NRC of Steps Taken to Correct Violations Noted in Insp Repts 50-498/89-47 & 50-499/89-47.Review Will Be Documented in Insp Repts 50-498/90-30 & 50-499/90-30 ML20059F0921990-08-30030 August 1990 Forwards Request for Addl Info Re Fire Protection Modeling in Probability Safety Assessment.Answers to Questions Will Form Basis for 900919 Meeting in Rockville,Md ML20059D5861990-08-27027 August 1990 Confirms 900830 Mgt Meeting in Region IV Ofc to Discuss Scenario Exercise Weaknesses Identified During Apr 1990 Emergency Exercise at Plant ML20056B3971990-08-20020 August 1990 Forwards Partially Withheld Insp Repts 50-498/90-22 & 50-499/90-22 on 900604-08 & Notice of Violation ML20056B3191990-08-17017 August 1990 Forwards Insp Repts 50-498/90-24 & 50-499/90-24 on 900701-0801.No Violations or Deviations Noted ML20056A7791990-08-0808 August 1990 Discusses Licensee Response to Generic Ltr 89-10, Safety-Related Motor-Operated Valve Testing & Surveillance. Justification for Differences in Program & Generic Ltr Should Be Incorporated Into Program Description ML20056A7751990-08-0707 August 1990 Forwards Request for Addl Info Based on Review of Probability Safety Assessment at Plant ML20056A7981990-08-0303 August 1990 Advises That 900122 Relief Requests Re Pump & Valve Inservice Test Plan Acceptable & That Stroke Time Criteria Need Not Be Documented in Plan Itself,If Included Elsewhere in Procedures.Any Revs to Plan Should Be Provided to NRC ML20056A7961990-08-0303 August 1990 Advises That Util Response to Generic Ltr 88-06 Re Implementation of Spds,Acceptable ML20055G8191990-07-19019 July 1990 Forwards Insp Repts 50-498/90-23 & 50-499/90-23 on 900601-30.No Violations or Deviations Noted IR 05000498/19900011990-07-19019 July 1990 Ack Receipt of Informing NRC of Steps Taken to Correct Violations Noted in Insp Repts 50-498/90-01 & 50-499/90-01 ML20055G0771990-07-13013 July 1990 Advises That Most Portions of Rev 16 to Physical Security Plan Consistent W/Provisions of 10CFR50.54(p) & Acceptable. Portions Noted in Encl That Decrease Effectiveness of Plan Should Be Resubmitted.Encl Withheld (Ref 10CFR73.21) ML20055F5831990-07-10010 July 1990 Advises That 900601 Rev 10 to Safeguards Contingency Plan Consistent W/Provisions of 10CFR50.54(p) & Acceptable ML20055F7431990-07-0505 July 1990 Advises That Util 900216 Response to Bulletin 89-003, Potential Loss of Required Shutdown During Refueling Operations, Acceptable ML20059M8401990-06-13013 June 1990 Forwards NRC Performance Indicators for First Quarter 1990. W/O Encl ML20248H5811989-10-0505 October 1989 Forwards Summary of 891003 Meeting in Region IV Ofc Re Activities Authorized by Licenses NPF-76 & NPF-80 ML20248H2151989-10-0505 October 1989 Forwards Insp Repts 50-498/89-31 & 50-499/89-31 on 890814-25.No Violations or Deviations Noted IR 05000498/19890171989-09-29029 September 1989 Ack Receipt of Informing NRC of Steps Taken to Correct Violations Noted in Insp Repts 50-498/89-17 & 50-499/89-17 ML20248C6901989-09-28028 September 1989 Forwards Insp Repts 50-498/89-35 & 50-499/89-35 on 890814-18 & Notice of Violation ML20248C6101989-09-27027 September 1989 Forwards Insp Repts 50-498/89-33 & 50-499/89-33 on 890821-25.Violations Noted,But No Citations Will Be Issued, Per NRC Policy ML20248C6731989-09-26026 September 1989 Forwards Insp Repts 50-498/89-30 & 50-499/89-30 on 890801-31.No Violations or Deviations Noted ML20247R3021989-09-22022 September 1989 Forwards Insp Repts 50-498/89-37 & 50-499/89-37 on 890911-15.Violations Noted.No Citation Issued Per Section V.A of NRC Enforcement Policy ML20248G9491989-09-21021 September 1989 Forwards Unexecuted Amend 6 to Indemnity Agreement B-108, Reflecting Increase in Primary Layer of Nuclear Energy Liability Insurance Provided by ANI & Maelu ML20248E6121989-09-21021 September 1989 Forwards Safety Evaluation Re Deletion of Dynamic Rod Drop Test,Static Rod Cluster Control Assembly (Rcca) Test & Rcca Below Bank Position Measurement Tests Based on Review of Util 890728 Submittal.Deletion Acceptable ML20247H5281989-09-12012 September 1989 Forwards Insp Repts 50-498/89-36 & 50-499/89-36 on 890821-25 & Notice of Violation ML20247K2001989-09-12012 September 1989 Advises That Rev 1 to Licensee Licensed Operator Requalification Program Meets 10CFR50.59 Requirements & Acceptable.Revised Rule Stated in Generic Ltr 87-07 Offered as Alternative to Submitting Program for Review ML20247D4521989-09-11011 September 1989 Forwards Insp Repts 50-498/89-25 & 50-499/89-25 on 890724-28 & 0807-11.No Violations or Deviations Noted. Independent Safety Engineering Group Appeared to Be Below Goal for Performing Direct Plant Observations ML20247B6891989-09-0101 September 1989 Forwards Summary of 890825 Meeting W/Util in Region IV Ofc Re Activities Authorized Under Licenses NPF-76 & NPF-80. Better Understanding of Util Operations,Refueling Outage & Mgt Programs Provided ML20246M9411989-08-31031 August 1989 Forwards Insp Repts 50-498/89-22 & 50-499/89-22 on 890710-14.No Violations or Deviations Noted ML20247A5621989-08-30030 August 1989 Forwards Summary of Region Iv/Senior Util Executive Meeting on 890818 at Univ of Texas.Agenda & List of Attendees Encl ML20246E9721989-08-25025 August 1989 Forwards Insp Repts 50-498/89-26 & 50-499/89-26 on 890718-20.No Violations or Deviations Noted ML20246A3271989-08-16016 August 1989 Forwards Insp Repts 50-498/89-28 & 50-499/89-28 on 890731-0804.No Violations or Deviations Noted ML20245L5451989-08-15015 August 1989 Forwards Insp Repts 50-498/89-17 & 50-499/89-17 on 890601-30 & Notice of Violation ML20245H3801989-08-11011 August 1989 Ack Receipt of Informing NRC of Steps Taken to Correct Violations Noted in Insp Repts 50-498/89-10 & 50-499/89-10 ML20245J5211989-08-10010 August 1989 Forwards Insp Repts 50-498/89-15 & 50-499/89-15 on 890607-30 & Notice of Violation.Actions Taken Re Previous Insp Findings Examined 1990-09-28
[Table view] Category:OUTGOING CORRESPONDENCE
MONTHYEARML20217K9341999-10-15015 October 1999 Forwards SER Accepting Util 990609 Relief Request RR-ENG-2-4 for Relief from ASME Code,Section XI, Nondestructive Exam Requirements Applicable to Stp,Units 1 & 2,reactor Vessel Closure Head Nuts ML20217K9091999-10-15015 October 1999 Forwards SER Accepting Util 990609 Relief Request RR-ENG-2-3 from ASME Code,Section Xi,Nondestructive Exam Requirements Applicable to South Texas Project,Units 1 & 2, Pressurizer Support Attachment Welds ML20217C3221999-10-0707 October 1999 Forwards Insp Repts 50-498/99-16 & 50-499/99-16 on 990808-0918.No Violations Noted.Insp Generally Characterized by safety-conscious Operations,Sound Engineering & Maint Practices & Careful Radiological Work Controls ML20212L1651999-09-30030 September 1999 Responds to STP Nuclear Operating Co 981012 & s Which Provided Update to TS Bases Pages B 3/4 8-14 Through B 3/4 8-17.NRC Staff Found Change Consistent with TS 3/4.8.2 DC Sources. Staff Found & Deleted Typographical Error ML20212J7141999-09-29029 September 1999 Forwards Insp Repts 50-498/99-15 & 50-499/99-15 on 990920-24 at South Texas Project Electric Generating Station.No Violations Noted.Insp Covered Requalification Training Program & Observation of Requalification Activities ML20212J0651999-09-27027 September 1999 Discusses Licensee 980330 Response to GL 97-06, Degradation of SG Internals. Concludes That Response to GL Provides Reasonable Assurance That Condition of SG Internals in Compliance with Current Licensing Bases for Facility ML20212F1791999-09-24024 September 1999 Discusses 990923 Meeting Conducted in Region IV Ofc Re Status of Activities to Support Confirmatory Order, ,modifying OL & to Introduce New Director,Safety Quality Concerns Program.List of Attendees Encl ML20212E9091999-09-23023 September 1999 Discusses GL 98-01, Year 2000 Readiness of Computer Sys at Npps, Supplement 1 & STP Nuclear Operating Co Response for STP Dtd 990629.Understands That at Least One Sys or Component Listed May Have Potential to Cause Transient ML20212F2111999-09-22022 September 1999 Forwards Review of SG 90-day Rept, South Texas Unit-2 Cycle 7 Voltage-Based Repair Criteria Rept, Submitted by Util on 990119 ML20212D9171999-09-16016 September 1999 Informs That on 990818,NRC Completed Midcycle PPR of South Texas Project & Identified No Areas in Which Performance Warranted Insp Beyond Core Insp Program.Details of Insp Plan Through Mar 2000 & Historical Listing of Plant Issues,Encl ML20216F5471999-09-15015 September 1999 Discusses 990914 Meeting Conducted at Region Iv.Meeting Was Requested by Staff to Introduce New Management Organization to Region IV & to Discuss General Plant Performance & Mgt Challenges IR 05000498/19990121999-09-14014 September 1999 Forwards Insp Repts 50-498/99-12 & 50-499/99-12 on 990816-19.Three Violations Occurred & Being Treated as Ncvs. Areas Examined During Insp Included Portions of Access Authorization & Physical Security Programs ML20211P8201999-09-0909 September 1999 Forwards SE Authorizing 990224 Submittal of First 10-year Interval ISI Program Plan - Relief Request RR-ENG-24,from ASME Section XI Code,Table IWC-2500-1 ML20211P7671999-09-0909 September 1999 Forwards SER Authorizing Licensee 990517 Alternative Proposed in Relief Request RR-ENG-2-8 to Code Case N-491-2 for Second 10-year Insp Interval of South Texas Project, Units 1 & 2,pursuant to 10CFR50.55a(a)(3)(i) ML20211P7871999-09-0909 September 1999 Forwards Safety Evaluation Re First 10-yr Interval Inservice Insp Program Plan Request for Relief RR-ENG-31 IR 05000498/19990141999-09-0303 September 1999 Forwards Insp Repts 50-498/99-14 & 50-499/99-14 on 990627-0807.Apparent Violations Identified & Being Treated as Noncited Violations Consistent with App C of Enforcement Policy ML20212A4351999-08-27027 August 1999 Discusses Investigation Rept OI-4-1999-009 Re Activites at South Texas Project.Oi Investigation Initiated in Response to Alleged Employment Discrimination Complaint. Allegation Not Substantiated.No Further Action Planned ML20211J2511999-08-26026 August 1999 Discusses Proposed TS Change on Replacement SG Water Level Trip Setpoint for Plant,Units 1 & 2 ML20211F4421999-08-24024 August 1999 Forwards SE Authorizing Licensee 990513 Request for Relief RR-ENG-2-13,seeking Relief from ASME B&PV Code Section Xi,Exam Vessel shell-to-flange Welds for Second ISI Intervals ML20211F5031999-08-23023 August 1999 Forwards SE Authorizing Licensee 990315 Request for Relief RR-ENG-30,seeking Relief from ASME B&PV Code,Section Xi,Nde Requirements Applicable to Stp,Unit 2 SG Welds ML20212A4391999-08-17017 August 1999 Discusses Investigation Rept OI-4-1999-023 Re Activities at South Texas Project.Oi Investigation Initiated in Response to Alleged Employment Discrimination for Initiating Condition Report to Document Unauthorized Work Practices ML20210U1271999-08-16016 August 1999 Forwards Insp Repts 50-498/99-08 & 50-499/99-08 on 990517-21 & 0607-10.No Violations Noted.Corrective Action Program Was Reviewed ML20211A9501999-08-12012 August 1999 Discusses 990720-21 Workshop Conducted in Region IV Ofc,Re Exchange of Info in Area of Use of Risk Insights in Regulatory Activities.List of Attendees,Summary of Topic & Issues,Agenda & Copies of Handouts Encl ML20211B7881999-08-10010 August 1999 Transmits Summary of Two Meetings with Risk-Informed TS Task Force in Rockville,Md on 990514 & 0714 ML20210L1461999-08-0303 August 1999 Informs That NRC Plans to Administer Gfes of Written Operator Licensing Exam on 991006.Requests Submittal of Ltr Identifying Individuals Taking Exam,Personnel Allowed Access to Exams & Mailing Address for Exams ML20210F3851999-07-26026 July 1999 Forwards Exam Repts 50-498/99-301 & 50-499/99-301 on 990706- 15.Exam Included Evaluation of 9 Applicants for SO Licenses & 8 Applicants for RO Licenses ML20210D9011999-07-23023 July 1999 Forwards Safety Evaluation Re Inservice Testing Plan Request for Relief RR-5 Component Cooling Water & Safety Injection Sys Containment Isolation Check Valve Closure Test Frequency ML20210C2111999-07-21021 July 1999 Forwards Insp Repts 50-498/99-13 & 50-499/99-13 on 990516-0626.Two Severity Level IV Violations Occurred & Being Treated as Noncited Violations ML20209H9231999-07-16016 July 1999 Discusses South Texas Project,Units 1 & 2 Updated Response to GL 92-01,Rev 1,Suppl 1, Rv Structural Integrity. Staff Revised Info for Plant in Rvid & Being Released as Rvid Version 2 ML20207H6261999-07-0808 July 1999 Responds to Re 2nd 10 Yr Interval ISI Program Plan Request to Use ASME Section XI Code Case N-546, Alternative Requirements for Qualification of VT-2 Exam Personnel,Section Xi,Division 1.Forwards SE ML20195J6731999-06-17017 June 1999 Responds to Re Request for Relief from ASME Code, Section Xi,Requirement to Perform VT-1 Visual Exam on Accessible Surfaces of RPV Flange Inserts (Bushings). Safety Evaluation Encl ML20195F7561999-06-10010 June 1999 Forwards Insp Repts 50-498/99-11 & 50-499/99-11 on 990404-0515 at South Texas Project Electric Generating Station,Units 1 & 2.No Violations Were Identified ML20207H0031999-06-0909 June 1999 Discusses 990419 Meeting in Region IV Ofc Re South Texas Project EP Program Status,Including Initiatives in EP Program,Future Revs to EP & Dept Performance Indicators. Meeting Attendance List & Licensee Presentation Encl ML20195G3241999-06-0909 June 1999 Ack Receipt of Re Changes to Plant Emergency Plan Change Notice 18-2.No Violations of 10CFR50.54(q) Were Identified ML20207D7371999-05-28028 May 1999 Discusses Re Process for Reclassification of non- Risk Significant Components.Forwards Concerns & Cautions for Consideration Based on Limited Review of Reclassification Process Overview That Was Provided IR 05000498/19980151999-05-28028 May 1999 Ack Receipt of Informing NRC of Steps Taken to Correct Violations Noted in Insp Repts 50-498/98-15 & 50-499/98-15.Corrective Actions Reviewed & Found to Be Responsive to Issues Raised ML20207E1961999-05-25025 May 1999 Forwards Insp Repts 50-498/99-09 & 50-499/99-09 on 990503-06.No Violations Noted.Primary Focus of Insp to Review Operational Status of Emergency Preparedness Program ML20207A8771999-05-25025 May 1999 Forwards RAI Re Licensee 960213 180-day Response to GL 95-07, Pressure Locking & Thermal Binding of Safety-Related Power-Operated Gate Valves, for Plant,Units 1 & 2.Response Requested within 120 Days from Date of Ltr IR 05000498/19990061999-05-12012 May 1999 Submits Corrected First Page of Cover Ltr Re Insp Repts 50-498/99-06 & 50-499/99-06 Conducted on 990221-0403.Subj Line Was Corrected ML20206S3201999-05-12012 May 1999 Forwards Corrected First Page of Cover Ltr,Which Forwarded Insp Repts 50-498/99-06 & 50-499/99-06,issued on 990505. Subj Line Indicated on NOV Was Incorrect ML20206N5481999-05-11011 May 1999 Informs That NRC Office of Nuclear Reactor Regulation Reorganized Effective 990328.As Part of Reorganization,Div of Licensing Project Mgt Created.Ra Gramm Will Be Section Chief for South Texas Project.Organization Chart Encl ML20206J4321999-05-0707 May 1999 Informs That on 990407,NRC Administered Gfes of Written Operator Licensing Exam.Licensee Facility Did Not Participate in Exam,However,Copy of Master Exam with Answer Key Encl for Info.Without Encl ML20206J4211999-05-0606 May 1999 Ack Receipt of in Response to & Insp Repts 50-498/99-04 & 50-499/99-04,confirming Commitments as Stated in 990225 Exit Meeting ML20206H6201999-05-0505 May 1999 Forwards Insp Repts 50-498/99-06 & 50-499/99-06 on 990221- 0403.Three Violations of NRC Requirements Identified & Being Treated as non-cited Violations Consistent with App C of Enforcement Policy ML20206H3811999-05-0505 May 1999 Responds to STP Nuclear Operating Co Which Provided Update to TS Bases Pages B 3/4 2-6.Revised TS Bases B 3/4 2-6 That NRC Staff Will Use to Update Copy of STP Bases Encl ML20206H2001999-05-0404 May 1999 Forwards Exemption from Requirements of 10CFR50.60, Acceptance Criteria for Fracture Prevention Measures for Lightwater Nuclear Power Reactors for Normal Operation ML20206B6091999-04-22022 April 1999 Forwards Insp Repts 50-498/99-10 & 50-499/99-10 on 990405-09.No Violations Noted ML20206B3281999-04-22022 April 1999 Forwards Insp Repts 50-498/99-07 & 50-499/99-07 on 990405- 09.Insp Focused on Radiological Controls in Place During Unit Refueling Outage.Violations Identified Involving Failure to Follow Radiation Work Permit Instructions ML20205Q8151999-04-16016 April 1999 Forwards Request for Addl Info Re Proposed Amends on Operator Action for small-break-LOCA,dtd 980728.Response Requested within 45 Days of Ltr Date ML20205P5821999-04-15015 April 1999 Advises That Version of Application & Affidavit Dtd 990127, Executed by Ha Sepp,Marked Proprietary,Will Be Withheld from Public Disclosure,Per 10CFR2.790(b)(5) & Section 103(b) of AEA of 1954,as Amended 1999-09-09
[Table view] |
Text
. ,
- g3 SW Docket Nos. 50-498/499 Houston Lighting and Power Lompany
' Attn: Mr. M. R. Wisenburg Manager, Engineering and Licensing-P.O. Box 1700 Houston, Texas 77001 Gentlemen:
Your letters dated December 1 and 17,1987, requested:
- a. A breakdown of professional staff review hours by reviewers and offices for the period of June-24,1984 through December 20, 1986, that were billed on Invoices G0269 (UnitNo.1)andG0270(UnitNo.2). These invoices were dated November 4, 1987.
- b. An itemized list of contractual cnsts for the entire review period from CP w uances in 1975 through December 20, 1986,for each unit.
Enclosures 1 and 2 are in response to the above items "a" and "b". You will note from item "a" that for the six-month cycle ending December 20, 1986, there were 1,496.1 hours1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> indicated as being billable as OL review for Unit No. 1, but not. billed. Since Unit No. I has received an operating license and your Company has paid the $3,077,400 maximum fee, these hours will not be billed to Houston Lighting and Power, but we will add the sum of $92,758 ($62 X 1496.1) to the OL review cost records when we compute the cost for OL review through the issuance of the 100%
OL on March 22, 1988. Our November 4,1987 letter informed you that the Unit No. 1 OL review cost through December 20, 1986, was $5,011,077.
When the $92,758 is added to that, the cost through December 20, 1986, becomes $5,103,835 for Unit No. 1.
On Enclosure 2, we note that there is a total of $27,616 in contractual costs under FIN Number 80796 for Unit No. 2 relating to operator examinations for the period of June 1984 through December 1985. We are checking these costs further to determine if they should be far Unit No.1 in lieu of Unit No. 2. If we find-that they were erroneously reported to Unit No. 2, we will give credit for these costs on the next invoice for Unit No. 2 which will be for the six-month cycle that ended December 1987.
In addition to the above requests, your December 17, 1987 letter requested responses to two questions. The questions and our answers to them are as follows:
D 8808120089 880805 1 PDR ADOCK 05000498 \
P PDC
... - . -~ .- - -,
.1 y
AUG 5 1908
- 1. What is the' basis for the billable rate per hour and provide detail as to how this rate is developed?
Answer: Enclosed is a copy of NUREG-0268 which shows the basis for the hourly rate and how it was-developed for the rule change that became effective March 23, 1978. While NRC did not publish a NUREG document for the rates in the current 10 CFR 170.20, the same method set forth in NUREG-0268 was used.
- 2. What is the basis for the cost allocation between units for the various contracts?
Answer: _The Comissiori's established policy on allocations between units for the various contracts for cases under OL review has always been that where contractual services are determined by review staff to be fully applicable to each unit, the costs are split equally. When a review item is considered to be pertinent to a particular unit only, the costs are assessed against that unit.-
In filling your requests, every effort was made to be as specific and complete as possible for the types of details requested. We hope that the infonnation being provided will satisfy your needs.
Sincerely, 81gudbjs Reau.olas C. James Holloway, Jr. , Chief License Fee Management 8 ranch Division of Accounting and Finance Office of Administration and Resources Management
Enclosures:
- 1. Staff Hour Breakdowns forUnits1and2(355pages)
- 2. Contractual Costs for Units 1 and 2 (15 pages)
- 3. NUREG-0268 CERTIFIED MAIL RETURN RECEIP_T REQUESTED OFFICE : /l SURNAME: RMDiggs:ab dB JHollosay DATE : 8/5 /88 8/5/88
J,1 -- v. . .
g : .
AUS 5 W f
.Dist, w/o encl:
PDR LPDR
-r$ Regul a tory l: Docketi F11 es r;5,0.398/499d/encit: 2 *-
LFMB A/M for 50-498/499' w/ Portions of Encl. 1 and all'of encl.2 GJohnson, DAF-CJHolloway, . LFMB RMDiggs, LFMB RVillafranco, NRR - w/ encl.'2
.LFMBR/F(2)
ARM /DAF R/F
.DW/RMD/ Houston Lighting & Power 7/25/88 E
A i
(
((l '
I t
I i
.1
..f. .h.by'-fj hr s, y
, m, .~W g'tu,x.,,,,xg, l
hb5-w ..
a
[~ S Vf S s L dyhxf ,.a ,k e, h k Contractor Abbreviations l
ANL -
Argonne National Laboratory.
BNL ,- Brookhaven flational Laboratory INEL -
Idaho National Energy Laboratory l
l l
LLNL -
Lawrence Livennore National Laboratory
)
ORNL -
Oak Ridge National Laboratory f PNL -
Pacific Nor'hwest Laboratory GAGB -
Gage-Babcock & Associates, Inc.
ZSAI -
Science Applications, Inc.
BEA -
Bureau of Economic Analysis, Dept. of Commerce 1
SONA -
Sonalist, Inc.
l
/
South Texas Nuclear Power Plant #1 (50-498)
Timeframe: CP Issuance - 5/84 FIN # Costs Contractor Type of Work Written Products A0245^ $ 39,000 LLNL Contair. ment Systems Review I A0409N $ 21,780 LLNL Power System Reviews .
A04131 $ 48,000 LLNL Control Room Design Review None A2104\ $ 40,300 ANL Confirmatory Report on Piping Analysis TER for Feedwater Line A2106% 5 24,200 AHL Instrumentation and Control System Draf t SER on Ch. 8 & 9 Review III A2115' $ 19,650 ANL Power System Review II -
A3363) $ 12,962 BNL LWR Systems Corrosion Program TER A6270/ $ 30,775 INEL FSAR Review - Reactor Systems RAI A6415d $ 589 1NEL Equipment Qualification Review A6458 7 $ 16,932 INEL FSAR Section 5 & 16 SER Input B0001A $ 42,228 ORNL Environmental Review for Preliminary Draft of Environmental Statement B0725 % $ 40,121 ORNL Elec. & Mech. Systems and Related FSAR Sections B234 M $ 10,300 PNL FSAR Amendment - Chapter 14 - Plant Test Program TER B6588 d S I,401 GAGB Fire Protection Program Review B8020 S 189 GAGB Fire Protection Program Review
$348,427 - Amount Billed From Issuance of CP Through 9/30/83.
. B8020 $ 205 GAGB Fire Protection Program Review)
A6457 $ 2,885 INEL Control of Heavy Loads ) = $3,590 from 10/1/83 Through 5/31/84 B2544 S 500 PNL FSAR Review )
N
South Texas Nuclear Powtr Plant #1 (50-498)
Timeframe: 6/84 - 11/84 FIN # Costs Contractor Type of Work Written Products A0446 S 8,800 LLNL DCRDR Audit TER A6415 5 9,831 INEL Preaudit Review for QA (Thompson Valves) ,
A6457 5 1,549 INEL Case Review for Control of Heavy Loads TER A6458 5 9,171 INEL Review of FSAR for PSI & NDE (Amend. 40) RAI A9463 $ 3,622 ORNL Computer Plots of Population Density / Counts Computer Plots B2340 $ 900 PNL FSAR Amendment B2544 5 300 PNL FSAR Review -
None B8011 $ 14 ZSAl GL 83-28 Review TER B8020 $ 421 GAGB Fire Protection Program Review
$34,608 - Amount Billed for 6/84 - 11/84
South Texas Nuc!e'r Pow:r Plant #1 (50-498)
Timeframe: 12/84 - 5/85 FIN # Costs Contractor Type of Work Written Products A6457 $ 333 INEL Control of Heavy Loads A6458 $ 8,330 INEL Fracture Toughness Reviews , Revised SER A6818 5 418 INEL Review of Additional Info. on GL 83-28 RAI Items 4.2.1 and 4.2.2 19463 $ 2,702 ORNL Computer Plots of Population Density / Counts Computer Plots B0747 5 2,576 ORNL Review of Design Documentation Letter Report 80790 $22,425 ORNL OL Staff EIS Input / Aquatic 5 Terrestrial EIS Input B2340 5 1,400 PNL FSAR Amendment TER B2537 $ 1,402 PNL Meteorological Data TER B2544 5 6,400 PNL FSAR Review None B8011 $ 3,747 ZSAI GL 83-28 Review TER
$49,733 - Amount Billed for 12/84 - f/85
, South Texas Nuclear Power Plant #1 (50-498)
Timeframe: 6/85 - 12/85 FIN,# Costs Contractor Type of Work Writte... rducts A0446 $ 996 LLNL Control Room Design Review A3702 $21,913 BNL Rev. of AFW System Reliability ,
Draft TER A3819 $24,636 BNL DES Fission Product Release Review & Evaluation of Information A6415 $ 5,034 INEL Pre-Audit Review for EQ TER A6457 $ 328 INEL Control of Heavy Loads None A6458 $12,295 INEL FSAR Review Draf t SER A6493 $13,891 INEL Review Deviations from RG 1.97 Draft TER A6498 5 3,263 INEL Exam Queltion Sank Development None and Implementation A6818 $ 1,528 INEL Review of Additional Info. on GL 83-28 Final Input to SER Items 4.2.1 and 4.2.2 A6824 $ 210 INEL Tech Spec. Evaluation A9463 5 23 ORNL Environmental Considerations None B0767 $13,528 ORNL Review of Design Documentation Letter Report 80785 $25,247 ORNL Reviev & Evaluate Accident Consequences letter Report B0790 $ 9,048 ORNL OL Staf f EIS Input / Aquatic & Terrestrial EIS Input B2340 $ 4,500 PNL FSAR Review None B2537 $ 1,799 PNL Meteorological Data TER 1
, South' Texas Nuclear Power Plant #1 (50-498)
Timeframe: 6/35 - 12/85 i
FIN # Costs, Contractor Type of Work Written Products B2544 5 1,300 PNL FSAR Review None B8011 $ 465 ZSAI GL 83-28 Review , TER R8678 $ 12,000 BEA Regional Economic Impact of Accidents EIS Input
$152,004 - Amount Billed for 6/85 - 12/85 e
4 d
1 1
1
South Texas Nuclear Power Plant #1 (50-498) l Timeframe: 1/86 -6 /86 FIN # Costs Contractor Type of Work Written Products A3702 $ 6,155 BNL Rev. of AFW System Reliability TER A3819 $ 1,348 BNL DES Fission Product Release . TER A6458 $ 1,051 INEL Review of Mechanized Ultransonic Exam. Plan SSER Input A6493 $ 3,266 INEL Prepare Final TER of Review of RG 1.97 TER A6811 $28,175 INEL IST Review & Meeting RAI/ Meeting / Trip Report B0790 $ 8,739 ORNL OL Stage EIS Input / Aquatic & Terrestrial EIS Input 82340 $ 1,600 PNL FSAR Review -
None B2537 $ 1 PNL Meteorogolical Data None B2544 $ 900 PNL FSAR Review None D6002 $ 1,273 INEL Review Compliance with GL 83-28, Items 3.1.3 TER and 3.2.3 06016 $ 5,119 INEL SER Open Item Review (Ef fort Transferred to D6019
$57,627 - Amount Billed for 1/86 - 6/86
'd
South Texas Nuclear Power Plant 01 (50-498)
Timef rame: 7/86 - 12/86 Costs Contractor Type of Work Written Products FI_N #
A3702 5 12 BNL Rev. of AFW System Reliability Technical Evaluation Report (TER)
EQ Pre-Audit Meeting /FSAR Question / Response Site Visit Report A6415 $80,882 INEL Review A6458 $ 6,474 INEL Plant Site NDE Meeting / Final Review of PSI Trip Report Program A6493 $ 6,819 INEL Review of Additional Submittals from Applicant Revised TER on RG 1.97
$ 2,183 INEL Exam Question Bank Development - None 4
A6498 and Implementation
$15,172 INEL IST Program Resubmittal TER A6811 534 INEL Tech. Spec. Evaluation Ncne A6824 5 200 PNL SAR Chapter 14 None B2380 $
2 PNL Meteorological Data None B2537 $
~
01332 $ 8,391 SONA Operator Examinaticn Preparation Exam Admin. .
On-Site 1/5/87
$ 2,359 INEL Review Compliance with GL 85-28, Item 2.1 TER's 06002 D5005 $ 9,404 INEL NUREG-0737, Item II.D.1, Relief Valve & TER SRV Operability i
j
South Texas Nuclear Power Plant 01 (50-498)- .h Timeframe: 7/86 - 12/86 _
FIN # Costs Contractor Type of Work Written Products D6019 5 21,254 INEL Review SER Chapters /QDPSR Review SER Input /TER D6016 $ 87 INEL Review of SER Open Items , None D6018 $ 24 INEL ATWS None
$153,797 - Amount Billed for 7/86 - 12/86 L
South Texas teclear Power Plant 02 (50-499)
Timeframe: CP Issuance - 5/84 FfN # Costs Contractor Type of Work Written Products A0245 $39,000 LLNL Containment Systems Review I A0409 521,780 LLNL Power Systems Review ,
A2104 $40,300 ANL Confirmatory Report on Piping Analysis TER for Feedwater Line A2106 524,200 ANL Instrumentation and Control System Review Draft SER A2115 $19,650 ANL Power Systems Review A3363 $12,962 BNL LWR System Corrosion Program A6270 $30,775 INEL FSAR Review - Reactor Systems RAI i
A6415 $ 589 INEL Equipment Qualification Review
~
B0001 $ 42,228 ORNL Environmental Review B0725 $ 40,121 ORNL Elec. & Mech. Systems Review and related FSAR Sections B2340 $ 10,300 PNL FSAR Amendment TER B6588 $ 1,401 GAGB Fire Protection B8020 $ 175 GAGB Fire Protection Program Review
$283,481 - Amount Billed From CP Issuance Through 9/30/83 RS457 2,424 INEL Control of Heavy Loads for period from 10/1/83 Through 5/31/84 w\ _
e-. ---_ .
South Texas Kuclear' Power Plant #2'(50-499)- ,
~
Timeframe: 6/84 - 11/84 ..
-f W
FIN # t,osts Contra ctor Type of Work Written Products B0796 $26,362 ORNL Operator Exam Program Written Exam
$26,362 - Amount Billed for 6/84 - 11/84 2 l
l i
L
/ *
=
L
~5 L
D
[
i t
t
'i v
-i
ll
. . . r s
t c
u d
o r
P t r
n o p
e .
t e t R _
._ i r r W e t
t e -
L
)
9 9
4 0
5
( 5 m 8 a 2 / n r .
- 5 o g i o t - t r n a P a 4 t l 8 k r
n m P / e a 2 o m x r 1 W u E e c w f o r 5 o : o D o 8 P e t /
m e n a 5 r a p g r a r y i e -
e f T s p l e e O 4 c m D 8 u i o /
N T f t 2
- o 1
. s d a w e r x e t o e i a f T v l e e d h R R e t l u l o i S B t
r n o u t o c L L m a N N A r R R t O O -
C n
o 6 1 7 s 7 1 8 t
s 5, 0, 5, o 2 1 3 C
- 7 6 4 9 N 7 7 I 0 0 F B B Y
f 1 1l l! l
. 4
. ap - .a.-
South Texas Nuclear Powar Plant #2 (50-499)
Timeframe: 6/85 - 12/85 FIN # Costs Contractor Type of Work Written Products A6457 5 328 INEL Control of Heavy Loads None A6493 513,889 INEL Prepare Final TER for Review of RG 1.97 . TER B0747 $13,529 CRNL Review of Design Documentation Letter Report B0796 $ 243 ORNL Associated with Operator Exam. Program
$27,989 -Amount Billed for 6/85 - 12/85 5
i W
,.i~
.: r -
' ~
South Texas Nuclear Power Plant #2 (50-499).
~
Timeframe: 1/86 - 6/86 FIN # Costs Contractor Type of Work Written ProdIicts A6493 $ 3,266 INEL Prepare Final TER of-Review of RG 1.97 TER
$ 3,266 - Amount Billed for 1/86 - 6/86 ,
G e
i l
s South Texas Nuclear Power Plant #2 (50-499) _ , . ,
-Timeframe: 7/86 - 12/86 i
- FIN # Costs Contractor Type of Work Written Products '
! A6493- 5 1,654 INEL Review SPDS Isolation Device Submittals TER
$ 1,654 - Amount Billed - for 7/86 - 12/86 ,
i d
4 a
1 a
k 4
f
?
f 9
_.:- ._. ._