ML20151P395
| ML20151P395 | |
| Person / Time | |
|---|---|
| Site: | Peach Bottom |
| Issue date: | 07/21/1988 |
| From: | Gallo R NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I) |
| To: | Corbin McNeil PECO ENERGY CO., (FORMERLY PHILADELPHIA ELECTRIC |
| References | |
| NUDOCS 8808100014 | |
| Download: ML20151P395 (2) | |
See also: IR 05000277/1988006
Text
.
.
.
,
..
,
'
'
@UL 211988
i
Docket Nos. 50-277
50-278
Philadelphia Electric Company
,
ATTN: Mr. C. / . McNeill
'
.
Executive Vice President-nuclear
2301 Market Street
Philadelphia, Pennsylvania 19101
Gentlemen:
Subject:
Inspection No. 50-277/88-06 and 50-278/88-06
'
,
This refers to your letter dated May 31, 1988, in response to our letter-
dated April 29, 1988.
Thank you for informing us of the corrective and preventive actions documented
~
in your letter. These actions will.be examined during a future inspection of
your license training programs.
'
Your cooperation with us is appreciated.
Sincerely,-
ggjg1HAL SlfiED BY
G
HORMARI'OlW
Robert M. Gallo, Chief
Operations Branch
Division of Reactor Safety
,
,
-0
6
I l'
l
OFFICIAL RECORD COPY
RL PB 88-06 - 0001.0.0
8808100014 880721
07/14/88
ADOCK 05000277
'
i
Q
.
i
)
_ _ _ . .. _ _ . _ . . _ ., ._ . _ .. _ . _ _ _ _ _ . . _ , _ ,
. -
.
.
Philadelphia Electric Company
2
-
cc:
John S.' Kemper, Sr., Senior Vice President-Nuclear
J. W. Gallagher, Vice President, Nuclear Services
E. C. Kistner, Chairman, Nuclear Review Board
Dickinson M. Smith, Vice President, Peach Bottom Atomic Power Station
Jack Urban, General Manager, Fuels Department, Delmarva Power & Light Co.
John F. Franz, Plant Manager, Peach Bottom Atomic Power Station
Troy B. Conner, Jr. , Esquire
W. H. Hirst, Director, Joint Generation Projects Department,
Atlantic Electric
Bryan W. Gorman, Manager, External Affairs
Eugene J. Bradley, Esquire, Assistant General Counsel (Without Report)
Raymond L. Hovis, Esquire
Thomas Magette, Power Plant Siting, Nuclear Evaluations
W. M. Alden, Director, Licensing Section
Doris Poulsen, Secretary of Harford County Council
Dave Honan
Public Document Room (PDR)
Local Public Document Room (LPDR)
Nuclear Safety Information Center (NSIC)
NRC Resident Inspector
Commonwealth of Pennsylvania
bec:
Region I Docket Room (with concurrences)
Management Assistant, DRMA (5 /o enc 1)
Section Chief, DRP
PA0 (2) SALP and All Inspection Reports
Robert J. Bores, DRSS
RI:DRS V
RI:DRS
- DRS
Langg},
Howe / b
Gallo
C6/ /8
// /88
7/ /88
2I
Ak
0FFICIAL RECORD COPY
RL PB 88-06 - 0002.0.0
1
06/23/88
i
, , , . .
,..,,.m,,
,,>,~ ,,,-r
,~.-v
--e n ~ e ,- - -
n--~e~~~-
~ ' , -
..
.
-
. ~
,
e -
.
.
s.
PHILAD ELPHI A ELECTRIC COM PANY
.
2301 M ARKET STREET
P.O. BOX 8699
PHILADELPHI A, PA 19101
(2:sl e4i sooi
JOSEPH W. C ALL AGHER
May 31, 1988
viC: nano =~r
Docket Nos. 50-277
50-278
Mr. Robert M.
Gallo, Chief
Operations Branch
Division of Reactor Safety
Region I
U.S. Nuclear Regulatory Commission
ATTN:
Document Control Desk
D.C.
20555
SUBJECT:
Request for Additional Information dated
April 29, 1988, regarding Peach Bottom
Examination Report No. 50-277 and 50-278/88-06
Dear Mr. Gallo:
This letter responds to your letter dated April 29,
1988, requesting information regarding the training-of plant
operators and operator candidates on changes to plant procedures.
Your request is restated below:
"During the examination process it was determined that
several procedures had been revised, added, and/or deleted and
that some of these procedure changes were not submitted as part
of the examination preparation package.
The Chief Examiner
requested that the facility determine if plant operators and
operator candidates have been or will be trained on these
changes."
Since the physical plant and procedures are subject to
constont change and revision, some of the examination preparation
materials supplied to the NRC examiners ninety days prior to the
scheduled exam will become outdated.
Additionally, the time
between the exam and actual licensing of operators permits more
information to become outdated.
In order to assure that newly
)
licensed operators assume their shift duties with a current
knowledge and understanding of the plant procedures and
)
modifications, the Peach Bottom Training Division administers a
special upgrade class which addresses these changes.
This-
.
_p 1 [' f
f
< - us
2a
I
g/
L
1
'
"
y
,
.
. .
.
.
Mr.* Robert M. Gallo
May 31, 1988
, *
Page 2
.
training is completed prior to an operator's assigr. ment to a
licensed position.
Upon completion of the upgrade training, the
newly licensed operators become enrolled in the Licensed
Requalification Training Program which all shift operators are
required to attend every six weeks.
Requalification training
. continually updates the operators on'further modifications and
procedure changes.
When significant modifications or procedure
changes are made, these revisions are prcmptly discussed with the
operators during shift meetings, in addition to being addressed
by Requalification Training.
The two operators whose examination results were
reported by your letter dated April 29, 1988 received their
upgrade training on April 22, 1988.
Supporting documentation of
this training is available for your inspection.
1
If you have any questions, or require additional
information, please do not hesitate to contact us.
)
i
'
Very truly yours,
cc:
Addressee
'W. T.-Russe'll,IAdministrator,. Region:I,=USNRC~.
.
A~. G. Howe, Senior Operations Engineer, DRS
D. J. Lange, Chief, BWR Section, Operations Branch, DRS
'
T. P. Johnson, USNRC Senior Resident Inspector
T. E. Magette, State of Maryland
-l
,
_.
_.
. .
_
. . . . _ -
.__
__ _ _ _ _ _ _ _ _ _ _
. . _
_
RECElVED-REG'ON 1
1993 JU?! 10 Fit 1: 29
.
6
4
,
'
. -
l
.
'
. -
, .
-