Ack Receipt of Informing NRC of Steps Taken to Correct Violations Noted in Insp 50-277/88-06 & 50-278/88-06
ML20151P395
Person / Time
Site: Peach Bottom  
Issue date: 07/21/1988
From: Gallo R
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
To: Corbin McNeil
PECO ENERGY CO., (FORMERLY PHILADELPHIA ELECTRIC
References
NUDOCS 8808100014
Download: ML20151P395 (2)


See also: IR 05000277/1988006

Text

.

.

.

,

..

,

'

'

@UL 211988

i

Docket Nos. 50-277

50-278

Philadelphia Electric Company

,

ATTN: Mr. C. / . McNeill

'

.

Executive Vice President-nuclear

2301 Market Street

Philadelphia, Pennsylvania 19101

Gentlemen:

Subject:

Inspection No. 50-277/88-06 and 50-278/88-06

'

,

This refers to your letter dated May 31, 1988, in response to our letter-

dated April 29, 1988.

Thank you for informing us of the corrective and preventive actions documented

~

in your letter. These actions will.be examined during a future inspection of

your license training programs.

'

Your cooperation with us is appreciated.

Sincerely,-

ggjg1HAL SlfiED BY

G

HORMARI'OlW

Robert M. Gallo, Chief

Operations Branch

Division of Reactor Safety

,

,

-0

6

I l'

l

OFFICIAL RECORD COPY

RL PB 88-06 - 0001.0.0

8808100014 880721

07/14/88

PDR

ADOCK 05000277

'

i

Q

PDC

.

i

)

_ _ _ . .. _ _ . _ . . _ ., ._ . _ .. _ . _ _ _ _ _ . . _ , _ ,

. -

.

.

Philadelphia Electric Company

2

-

cc:

John S.' Kemper, Sr., Senior Vice President-Nuclear

J. W. Gallagher, Vice President, Nuclear Services

E. C. Kistner, Chairman, Nuclear Review Board

Dickinson M. Smith, Vice President, Peach Bottom Atomic Power Station

Jack Urban, General Manager, Fuels Department, Delmarva Power & Light Co.

John F. Franz, Plant Manager, Peach Bottom Atomic Power Station

Troy B. Conner, Jr. , Esquire

W. H. Hirst, Director, Joint Generation Projects Department,

Atlantic Electric

Bryan W. Gorman, Manager, External Affairs

Eugene J. Bradley, Esquire, Assistant General Counsel (Without Report)

Raymond L. Hovis, Esquire

Thomas Magette, Power Plant Siting, Nuclear Evaluations

W. M. Alden, Director, Licensing Section

Doris Poulsen, Secretary of Harford County Council

Dave Honan

Public Document Room (PDR)

Local Public Document Room (LPDR)

Nuclear Safety Information Center (NSIC)

NRC Resident Inspector

Commonwealth of Pennsylvania

bec:

Region I Docket Room (with concurrences)

Management Assistant, DRMA (5 /o enc 1)

Section Chief, DRP

PA0 (2) SALP and All Inspection Reports

Robert J. Bores, DRSS

RI:DRS V

RI:DRS

DRS

Langg},

Howe / b

Gallo

C6/ /8

// /88

7/ /88

2I

Ak

0FFICIAL RECORD COPY

RL PB 88-06 - 0002.0.0

1

06/23/88

i

, , , . .

,..,,.m,,

,,>,~ ,,,-r

,~.-v

--e n ~ e ,- - -

n--~e~~~-

~ ' , -

..

.

-

. ~

,

e -

.

.

s.

PHILAD ELPHI A ELECTRIC COM PANY

.

2301 M ARKET STREET

P.O. BOX 8699

PHILADELPHI A, PA 19101

(2:sl e4i sooi

JOSEPH W. C ALL AGHER

May 31, 1988

viC: nano =~r

NQCLEAR SE RVf CE S

Docket Nos. 50-277

50-278

Mr. Robert M.

Gallo, Chief

Operations Branch

Division of Reactor Safety

Region I

U.S. Nuclear Regulatory Commission

ATTN:

Document Control Desk

Washington,

D.C.

20555

SUBJECT:

Request for Additional Information dated

April 29, 1988, regarding Peach Bottom

Examination Report No. 50-277 and 50-278/88-06

Dear Mr. Gallo:

This letter responds to your letter dated April 29,

1988, requesting information regarding the training-of plant

operators and operator candidates on changes to plant procedures.

Your request is restated below:

"During the examination process it was determined that

several procedures had been revised, added, and/or deleted and

that some of these procedure changes were not submitted as part

of the examination preparation package.

The Chief Examiner

requested that the facility determine if plant operators and

operator candidates have been or will be trained on these

changes."

Since the physical plant and procedures are subject to

constont change and revision, some of the examination preparation

materials supplied to the NRC examiners ninety days prior to the

scheduled exam will become outdated.

Additionally, the time

between the exam and actual licensing of operators permits more

information to become outdated.

In order to assure that newly

)

licensed operators assume their shift duties with a current

knowledge and understanding of the plant procedures and

)

modifications, the Peach Bottom Training Division administers a

special upgrade class which addresses these changes.

This-

.

_p 1 [' f

f

< - us

2a

I

g/

L

1

'

"

y

,

.

. .

.

.

Mr.* Robert M. Gallo

May 31, 1988

, *

Page 2

.

training is completed prior to an operator's assigr. ment to a

licensed position.

Upon completion of the upgrade training, the

newly licensed operators become enrolled in the Licensed

Requalification Training Program which all shift operators are

required to attend every six weeks.

Requalification training

. continually updates the operators on'further modifications and

procedure changes.

When significant modifications or procedure

changes are made, these revisions are prcmptly discussed with the

operators during shift meetings, in addition to being addressed

by Requalification Training.

The two operators whose examination results were

reported by your letter dated April 29, 1988 received their

upgrade training on April 22, 1988.

Supporting documentation of

this training is available for your inspection.

1

If you have any questions, or require additional

information, please do not hesitate to contact us.

)

i

'

Very truly yours,

cc:

Addressee

'W. T.-Russe'll,IAdministrator,. Region:I,=USNRC~.

.

A~. G. Howe, Senior Operations Engineer, DRS

D. J. Lange, Chief, BWR Section, Operations Branch, DRS

'

T. P. Johnson, USNRC Senior Resident Inspector

T. E. Magette, State of Maryland