VINUINIA ELecruIc ann l'ownu COM1'ANY H rcu xoxn,Vr uoix A Mll 2 GI W.L.STEwanst d' ",8'","" ' ""," ',,,,
December 27, 1985 j
Mr. Harold R. Denton, Director Serial No.
85-494C Office of Nuclear Reactor Regulation NAPS /JHL Attn:
Mr. Lester S. Rubenstein, Director Docket No.
50-338 PWR Project Directorate #2 License No. NPF-4 Division of PWR Licensing - A U. S.
Nuclear Regulatory Commission Washington, D. C.
20555 Gentlemen:
VIRGINIA ELECTRIC AND POWER COMPANY NORTH ANNA POWER STATION UNIT NO. 1 GENERIC LE' ITER 83-28 ITEM 4.5.1 REACTOR TRIP SYSTEM RELIABILITY (SYSTEM FUNCTIONAL TESTING)
By letter dated June 24, 1985, the NRC provided a safety evaluation for Generic Letter 83-28, Items 3.1.1, 3.1.2, 3.2.1, 3.2.2, 4.1 and 4.5.1.
Item 4.5.1 of that safety evaluation requested that the NRC be notified when the auto shunt trip modifications were completed for North Anna Unit No. 1.
This letter is to inform you that the auto shunt trip modification has been installed in the North Anna Unit No. I reactor trip system.
In addition, the appropriate periodic test procedure has been revised to include on-line functional testing of the auto shunt trip feature.
These actions should complete Generic Letter 83-28, Item 4.5.1 Reactor Trip System Reliability (System Functional Testing).
We therefore believe this item can be closed.
Very truly yours, o
~&
hg W. L. Ste on.
ost W
J.
ht (ltr anly) 3 FICSR (RiPiA)
O1%
I"ik (GAMgt LL)
@,O10 OCg O asa(unumen
,e... _.,
P
vnmsma Euctmic awn Powna COMPANY TO Mr, }IarOld
'l. Denton cc:
Dr. J. Nelson Grace Regional Administrator NRC Region II Mr. '.f. W. Branch NRC Resident Inspector North Anna Power Station
-