Forwards Insp Rept 50-382/88-05 on 880307-11.No Violations or Deviations noted.Post-accident Sampling Sys Discussed
ML20151N600
Person / Time
Site: Waterford 
Issue date: 04/15/1988
From: Callan L
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
To: Dewease J
LOUISIANA POWER & LIGHT CO.
Shared Package
ML20151N605 List:
References
NUDOCS 8804250334
Download: ML20151N600 (3)


See also: IR 05000382/1988005

Text

. _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ .

,7,

..

'

APR l 5 53

-

-

-

In Reply Refer To:

Docket:

50-382/88-05

i

!

r

Louisiana Power & Light Company

ATTN:

J. G. Dewease, Senior Vice President

Nuclear Operations

-

317 Baronne Street

'

New Orleans, Louisiana 70160

Gentlemen:

,

This refers to the inspection conducted by Dr. J. B. Nicholas and Mr. R. Wise

of this office during the period March 7-11, 1988, of activities autho' rized by

.

NRC Operating License NPF-38 for the Waterford Steam Electric Station,' Unit 3,

and to the discussion of our findings with Mr.

P., P. Barkhurst and other

i

,

members of your staff at the conclusion of the inspection on March 11,;1988.

l

Areas examined during the inspection included the chemistry / radiochemistry

,!

program and water chemistry and radiochemistry confirmatory measurements.

l

~

Within these areas, the inspection consisted of selective examination of

'

procedures and representative records, interviews with personnel, and

!

observations by the NRC inspectors.

The inspection findings are documented in

!

the enclosed inspection report.

Within the scope of the inspection, no violations or deviations were

'

identified.

However, we are concerned about the amount of time the

postaccident sampling system has been unable to perform all of its design

functions.

Accordingly, you are requested to respond, in writing, within

30 days of the date of this letter, out*"ining the steps taken to ensure

complete operability of all PASS design functions including reactor coolant

system sample degasification and to ensure that all PASS design functions are

,

maintained operational.

Your response should address the root causes of the

'

problems along with short and long-te m corrective actions to maintain PASS

reliability.

,

!

We have also examined actions you have taken with regard to previously

identified inspection findings.

The status of these items is identifitd in

i

paragraph 2 of the enclosed report.

!

r

The response directed by this letter is not subject to the clearance procedures

of the Office of Management and Budget as required by the Paperwork Reduction

l

'

Act of 1980, PL 96-511.

I

RIV:FRPS:R

FRPS:

S

C:FRPS:RPSE

C:RPSSI

/A

f

.

JBNicholas;

RWise

BMurray

LAYand

ODChamberlain

N/7 /88

J/y/38

Q' / /88

4/8/88

4 //3 /88

D:DRP/A

!

LJCallan

\\

i / 4(88

\\

\\

0

/

8804250334 880415

'

!

PDR

ADOCK 05000392

!

O

DCD

<

- . - . - . -

- - - - -

_ _ - - _ .

-

- - - - - _ - - - - _ - - - - - - . - - - _ - - - - - . - - - - - - - - - - ---

,

,'

-

.

,

.

.

.

Louisiana Power & Light Company

-2-

Should you have any questions concerning this inspection, we will be pleased to

discuss them with you.

Sincerely,

Onkinal Signed By:

L. J.' CALLAN

L. J. Callan, Director

Division of Reactor Projects

Enclosure:

Appendix - NRC Inspection Report

50-382/88-05

cc w/ enclosure:

Louisiana Power & Light Company

ATTN:

G. E. Wuller, Onsite

Licensing Coordinator

P.O. Box B

Killona, Louisiand 70066

Louisiana Power & Light Con.pany

ATTN:

N. S. Carns, Plant Manager

P.O. Box B

Killona, Louisiana 70066

Middle South Services

ATTN:

Mr. R. T. Lally

P.O. Box 61000

New Orleans, Louisiana 70161

Louisiana Power & Light Company

ATTN:

K. W. Cook, Nuclear Safety and

Regulatory Affairs Manager

317 Baronne Street

P.O. Box 60340

New Orleans, Louisiana 70160

Louisiana Radiation Control Program Director

bec to DMB (IE06)

bec distrib. by RIV:

  • RRI

R. D. Martin, RA

  • Section Chief (ORP/A)
  • DRP
  • RPSB-DRSS
  • MIS System
  • Project Engineer, DRP/A
  • RSTS Operator

l

1

____

. . _ -

-

. -

.'

.

O

.

Louisiana Power & Light Company

-3-

  • RIV File
  • J. Wilson, NRR Project Manager
  • R. Hall
  • 0RS
  • TSS

Lisa Shea, RM/ALF

  • J. B. Nicholas

"R. Wise

H. Scott

R. L. Bangart

  • B. Murray
  • w/766

.