ML20151N001
| ML20151N001 | |
| Person / Time | |
|---|---|
| Site: | Arkansas Nuclear |
| Issue date: | 12/20/1985 |
| From: | Gagliardo J NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV) |
| To: | Jeffery Griffin ARKANSAS POWER & LIGHT CO. |
| Shared Package | |
| ML20151N004 | List: |
| References | |
| NUDOCS 8601020780 | |
| Download: ML20151N001 (2) | |
See also: IR 05000313/1985024
Text
,-
,,
DEC 2 01985
4
In Reply Refer To:
Dockets:
50-313/85-24
50-368/85-25
.
Arkansas Power & Light Company
ATTN:
John M. Griffin,
Senior Vice President -
Energy Supply
P. O. Box 551
Little Rock, Arkansas 72203
Gentlemen:
This refers to the inspection conducted by Messrs. W. D. Johnson,
P.
H.' Harrell; and C. C. Harbuck of this office during the period
October 1-November 30, 1985,- of activities authorized by NRC Operating
Licenses DPR-51 and NPF-6 for Arkansas Nuclear One, Units 1 and 2, and
to the discussion of our findings with Mr. B. A. Baker, and other members
of your staff at the conclusion of the inspection.
A portion of this
inspection was performed at your Little Rock General Offices (LRG0) by
-
Mr. P. H. Harrell during the period October 8-9, 1985.
The results of this
portion of the inspection was discussed with Mr. H. Greene and Mr. T. Enos of
.
your staff on October 9, 1985.
Areas examined during the inspection included operational safety verification
maintenance, surveillance, followup on previously. identified items, followup on
licensee event reports, surveillance procedures and records, procurement
program review, followup on IE Information Notices, and cold weather
preparations.
Areas examined during the inspection at LRG0 included followup
on previously identified items and a procurement program review. Within these
areas, the inspection consisted of selective examination of procedures and
representative records, interviews with personnel, and observations by the
inspectors.
The findings are documented in the enclosed inspection report.
Within the scope of the inspection, no violations or deviations were
' identified.
.
RIV:RPB/ k DMHunnicutt
RPB/B h
RPB
JEGagliardo
WDJohnson:de
p /d /85
& /R/85
(l,/f/85~ %
.
MrSE5!MEjh3
fo1
\\/
a
S
,
..
I;
y
-
.
.
y.
xv
_
,
.'.-
- -
-
, 3, . .
'
')
$
a5
-1,, .
i
^
y.
..
..
.
'
-
. .:. ,
i<
.w
-
,
,
l .,
'.
c
.
.~ .
..
-
p
lArkan'sas Power & Light Company
-2-
<
-
-
s
..
3,,
-
-
.
,
,
- .
.
'
,
..;,
,
/
- Should you have any questions concerning this inspection, we will be pleased to
-
-discuss them with you.
~
,
'[
Sincerely ~,
,
,
t
.
.
.
.
.
~
. . .
-
-
Original Signed % -
.
-
--
'
E. H. Johnson
-
'
'
E ,./
James E. Gagliardo,' Chief-
kC'
..
Reactor Projects Branch
?s
t
,
<
3; ' y,
,
'
' Enclosure:
' Appendix
NRC. Inspection ~ Report
-
150-313/85-24
/
4
,
.
-
'50-368/85-25
. .
,.,;
- v
i
,
T*'
cc w/ enclosures:
.
~
. J. MJ1Levine, General Manager
4
'
-
L
Arkansas. Nuclear One -
,
P. O. Box.608
- s
k'
_ 'Russellville,: Arkansas 72801
..
.
.
' ;,4f
. Arkansas' Radiation Control Program Director
.
m
.
,.
bcc to'DMB (IE01)
s- +
,
bec distrib, by RIV:
"
.
- Resident Inspector
.R. D. Martin, RA
- RPB
'i'
.
- EP&RPB-
- Section Chief (RPB/B)
'*D.' Weiss, LFMB (AR-2015)
'
' '
'E. H. Johnson, DRS&P
- RIV File
. *RSTS Operator
- MIS SYSTEM-
-
,
'
- w/766
, - .
'
jf
7
.
-
( i f,'
in
-
a
N.
a
,
'
'
t,.
'
,
%
4
D