|
---|
Category:CORRESPONDENCE-LETTERS
MONTHYEARML20217L7681999-10-19019 October 1999 Forwards Insp Rept 50-458/99-12 on 990822-1002.Four Severity Level IV Violations of NRC Requirements Identified & Being Treated as non-cited Violations Consistent with App C of Enforcement Policy RBG-45125, Forwards Voluntary Response to Administrative Ltr 99-03, Preparation & Scheduling of Operating Licensing Exams1999-10-18018 October 1999 Forwards Voluntary Response to Administrative Ltr 99-03, Preparation & Scheduling of Operating Licensing Exams ML20217J3751999-10-15015 October 1999 Informs That Applicable Portions of NEDC-32778P, Safety Analysis Rept for River Bend 5% Power Uprate, Marked as Proprietary Will Be Withheld from Public Disclosure Pursuant to 10CFR2.790(b)(5) & Section 103(b) IR 05000458/19990071999-10-0505 October 1999 Refers to Util Ltr Re Apparent Violations Described in Insp Rept 50-458/99-07 Issued on 990804 & Forwards Nov.Insp Described Two Apparent Violations Related to River Bend Station Division I EDG RBG-45123, Informs That Error Reported to NRC by GE on 990630 Resulted from Changes to SAFER Code Models Counter Current Flow Limiting (Ccfl) in Upper Part of Fuel Bundle at Upper Tie Plate (Utp).No Changes in SAR or COLR Required1999-09-30030 September 1999 Informs That Error Reported to NRC by GE on 990630 Resulted from Changes to SAFER Code Models Counter Current Flow Limiting (Ccfl) in Upper Part of Fuel Bundle at Upper Tie Plate (Utp).No Changes in SAR or COLR Required RBG-45124, Suppl to 990907 Response to Violations Noted in Insp Rept 50-458/99-07.Info to Address Specific Requests in 990920 Conference Call Re DG Assessment Completion Dates for Corrective Actions & DG Maint Rule (a)(1) Status,Encl1999-09-24024 September 1999 Suppl to 990907 Response to Violations Noted in Insp Rept 50-458/99-07.Info to Address Specific Requests in 990920 Conference Call Re DG Assessment Completion Dates for Corrective Actions & DG Maint Rule (a)(1) Status,Encl RBG-45122, Forwards Rev 3 to RBS COLR for Ninth Fuel Cycle, IAW TS 5.6.5 of App a of FOL NPF-471999-09-23023 September 1999 Forwards Rev 3 to RBS COLR for Ninth Fuel Cycle, IAW TS 5.6.5 of App a of FOL NPF-47 RBG-45113, Clarifies Statement Contained in NRC SER for Licensing RBS, Per Error That Became Evident During Plant Fire Protection Functional Insp1999-09-21021 September 1999 Clarifies Statement Contained in NRC SER for Licensing RBS, Per Error That Became Evident During Plant Fire Protection Functional Insp ML20212D8901999-09-16016 September 1999 Discusses 6 Month Review of Plant Midcycle Ppr.Advises of Plans for Future Insp Activities.Forwards Historical Listing of Plant Issues,Referred to as PIM ML20216F7881999-09-15015 September 1999 Forwards Insp Rept 50-458/99-10 on 990830-990903.No Violations Noted.Insp Covered Licensed Operators Requalification Training Program & Observation of Requalification Activities 05000458/LER-1998-003, Forwards LER 98-003-02,revising Previous Rept Dtd 981005, Submitted to Clarify Reported Condition & to Incorporate Final Root Cause Analysis & Corrective Action Plan for Event.Complete Rev & No Change Bars Used in Documents1999-09-0909 September 1999 Forwards LER 98-003-02,revising Previous Rept Dtd 981005, Submitted to Clarify Reported Condition & to Incorporate Final Root Cause Analysis & Corrective Action Plan for Event.Complete Rev & No Change Bars Used in Documents ML20211Q7721999-09-0909 September 1999 Expresses Appreciation for ,In Response to NRC 990702 Re Denial of Notice of Violation Cited in Concerning Insp Rept 50-458/98-16.Reply Found to Be Responsive to Concerns Raised in NOV RBG-45109, Provides Comments on Reactor Vessel Integrity Database. Requests That Data Be Corrected as Noted1999-09-0808 September 1999 Provides Comments on Reactor Vessel Integrity Database. Requests That Data Be Corrected as Noted ML20211Q3921999-09-0808 September 1999 Forwards Insp Rept 50-458/99-08 on 990711-0821.One Violation Being Treated as Noncited Violation ML20211Q5541999-09-0808 September 1999 Discusses Meeting Conducted on 990830 in St Francisville,La Re Overall Performance Issues During 990403-0703 Refueling/ Maintenance Outage.Due to Proprietary Nature of Some Subject Matters,Meeting Closed to Public.Attendance List Encl ML20211P4121999-09-0707 September 1999 Requests NRC Staff Review & Approval of Integrated Nuclear Security Plan (Insp) & Integrated Security Training & Qualification Plan (Ist&Q), for Use by All Entergy Operations,Inc.Encl Withheld,Per 10CFR2.790(d) RBG-45095, Responds to NRC Re Violations Noted in Insp Rept 50-458/99-07.Corrective Actions:Fuel Pump Coupling Was Reworked Using Loctite & Division I DG Was Returned to Operable Status1999-09-0707 September 1999 Responds to NRC Re Violations Noted in Insp Rept 50-458/99-07.Corrective Actions:Fuel Pump Coupling Was Reworked Using Loctite & Division I DG Was Returned to Operable Status RBG-45097, Requests Approval of Proposed Alternative to Second Interval Inservice Testing Program,Allowing One Time Extension of Test Interval for 20% of Full Set Main Steam Line Safety Relief Valves1999-08-31031 August 1999 Requests Approval of Proposed Alternative to Second Interval Inservice Testing Program,Allowing One Time Extension of Test Interval for 20% of Full Set Main Steam Line Safety Relief Valves RBG-45094, Responds to NRC Re Violations Noted in Insp Rept 50-458/98-16 Between 990720 & 0807.Corrective Actions:River Bend Will Submit Changes Associated with Lcn 15.06-006 & Accompanying Evaluation1999-08-25025 August 1999 Responds to NRC Re Violations Noted in Insp Rept 50-458/98-16 Between 990720 & 0807.Corrective Actions:River Bend Will Submit Changes Associated with Lcn 15.06-006 & Accompanying Evaluation ML20211E2071999-08-23023 August 1999 Discusses Insp Rept 50-458/99-07 in Which 2 Violations Were Identified & Being Considered for Escalated Enforcement Action.Response Should Be Submitted Under Oath or Affirmation ML20211C5101999-08-19019 August 1999 Forwards Certified Copies of Liability Insurance Policy Endorsements Issued in First Half of 1999 for Each Entergy Operations,Inc Nuclear Unit,Per 10CFR140.15 RBG-45093, Forwards FFD six-month Program Performance Data Rept for Rept Period 990101 Through 990630,containing Statistical Data & Trend Analysis Compiled by FFD Dept1999-08-17017 August 1999 Forwards FFD six-month Program Performance Data Rept for Rept Period 990101 Through 990630,containing Statistical Data & Trend Analysis Compiled by FFD Dept ML20211A9291999-08-17017 August 1999 Forwards Insp Rept 50-458/99-11 on 990719-23.Areas Examined Included Portions of Licensee Physical Security Program. No Violations Noted ML20210T8881999-08-16016 August 1999 Forwards Replacement Pages 9-18 for Insp Rept 50-458/99-09, Issued on 990730 IR 05000458/19980101999-08-13013 August 1999 Forwards Summary of 990805 Mgt Meeting with Licensee in Arlington,Tx Re Radiological Control Problems Noted in Insp Repts 50-458/98-10 & 50-458/99-04.With Attendance List & Licensee Presentation ML20211A9501999-08-12012 August 1999 Discusses 990720-21 Workshop Conducted in Region IV Ofc,Re Exchange of Info in Area of Use of Risk Insights in Regulatory Activities.List of Attendees,Summary of Topic & Issues,Agenda & Copies of Handouts Encl ML20210U3751999-08-12012 August 1999 Informs That Info Contained in Presentation, River Bend Station Fuel Recovery Project,Dtd 990622, Will Be Withheld from Public Disclosure Pursuant to 10CFR2.790(b)(5) & Section 103(b) of Atomic Energy Act of 1954,as Amended ML20210Q7691999-08-11011 August 1999 Forwards Request for Addl Info Re Licensee River Bend Individual Plant Exam External Events,Under GL 88-20,suppl 4,dtd 910628 ML20210R4591999-08-10010 August 1999 Ack Receipt of Which Transmitted Plant Emergency Plan,Rev 20 Under Provisions of 10CFR50,App E,Section V.Nrc Approval Not Required,Based on Determination That Changes Does Not Decrease Effectiveness of EP ML20210N1641999-08-0404 August 1999 Forwards Insp Rept 50-458/99-07 on 990530-0710.One Violation of NRC Requirements Occurred & Being Treated as NCV, Consistent with App C of Enforcement Policy ML20210K4641999-08-0303 August 1999 Forwards SE Accepting Licensee 180-day Response to GL 95-07, Pressure Locking & Thermal Binding of Safety-Related Power Power-Operated Gate Valves, Issued on 950817 ML20210L1461999-08-0303 August 1999 Informs That NRC Plans to Administer Gfes of Written Operator Licensing Exam on 991006.Requests Submittal of Ltr Identifying Individuals Taking Exam,Personnel Allowed Access to Exams & Mailing Address for Exams ML20210K1351999-07-30030 July 1999 Forwards Insp Rept 50-458/99-09 on 990510-28 with in-office Insp Until 990701.Three Violations Being Treated as Noncited Violations ML20210J9691999-07-30030 July 1999 Discusses 990719 Meeting with Util in Arlington,Tx Re Region IV Staff Findings of Root Cause Investigation Into Fuel Cladding Failures That Occurred During Recent Cycle 8 Operation.List of Attendees & Organization Chart Encl RBG-45072, Submits Final Response to GL 94-02, Long-Term Solution & Upgrade of Interim Operating Recommendations for Thermal- Hydraulic Instabilities in Bwrs. Ltr Documents Completion of Reporting Requirements Contained in Subject GL1999-07-23023 July 1999 Submits Final Response to GL 94-02, Long-Term Solution & Upgrade of Interim Operating Recommendations for Thermal- Hydraulic Instabilities in Bwrs. Ltr Documents Completion of Reporting Requirements Contained in Subject GL ML20210E9001999-07-23023 July 1999 Informs That as Result of Staff Review of Licensee Responses to GL 92-01,rev 1,Suppl 1 & Suppl 1 Rai,Staff Revised Info in Reactor Vessel Integrity Database & Releasing Database as Rvid Version 2 RBG-45073, Requests Withholding of Info Presented in 990719 Meeting of EOI & NRC Region IV Re Recent Anomalous Conditions Found During Insp of Fuel Bundles During 1999 RFO at Rbs.Affidavit Executed IAW Provisions of 10CFR2.790(b)(1),encl1999-07-20020 July 1999 Requests Withholding of Info Presented in 990719 Meeting of EOI & NRC Region IV Re Recent Anomalous Conditions Found During Insp of Fuel Bundles During 1999 RFO at Rbs.Affidavit Executed IAW Provisions of 10CFR2.790(b)(1),encl RBG-45071, Forwards Rev 2 to River Bend COLR for Ninth Fuel Cycle,Iaw TS 5.6.5 of App A.Affected Pages of GE Suppl Reload Licensing Rept, May 1999 Submittal & List of Effective Pages,Encl1999-07-19019 July 1999 Forwards Rev 2 to River Bend COLR for Ninth Fuel Cycle,Iaw TS 5.6.5 of App A.Affected Pages of GE Suppl Reload Licensing Rept, May 1999 Submittal & List of Effective Pages,Encl 05000458/LER-1999-002, Forwards LER 99-002-01,IAW 10CFR50.73.Supplemental Rept Details Root Cause Analysis for Reported Condition. Commitments in Document Annotated on Commitment Identifier Form,Attachment 11999-07-15015 July 1999 Forwards LER 99-002-01,IAW 10CFR50.73.Supplemental Rept Details Root Cause Analysis for Reported Condition. Commitments in Document Annotated on Commitment Identifier Form,Attachment 1 ML20196L0501999-07-0606 July 1999 Informs That NRC Insp Rept 50-458/99-03 Issued on 990519 with Errors in Tracking Numbers Assigned to Seven Noncited Violations & Error Re Actual Location of SRO During Refueling Activities.Revised Pages 2 & 4 Encl ML20209B6081999-06-30030 June 1999 Submits Response to NRC GL 98-01,Suppl 1, Y2K Readiness of Computer Sys at Nuclear Power Plants. Disclosure Encl ML20196K6851999-06-30030 June 1999 Ack Receipt of & Denial of NOV in Response to Transmitting NOV & Insp Rept 50-458/98-16.Listed Info Documents Results of Review of Response to Violation Re fire-induced Circuit Faults ML20196K0671999-06-30030 June 1999 Forwards Insp Rept 50-458/99-04 on 990412-16 & 28-29.Five Violations of NRC Requirements Occurred & Being Treated as Noncited Violations,Consistent with App C of Enforcement Policy.Meeting Scheduled for 990726 RBG-45048, Forwards Rev 1 to Rbs,Cycle 9 COLR, IAW TS 5.6.5 of License NPF-47.GE Suppl Reload Licensing Rept,Dtd May 1999, Is Included.Without GE Rept1999-06-29029 June 1999 Forwards Rev 1 to Rbs,Cycle 9 COLR, IAW TS 5.6.5 of License NPF-47.GE Suppl Reload Licensing Rept,Dtd May 1999, Is Included.Without GE Rept RBG-45047, Informs of Util Expectation to Complete Review of Final Rept Supporting Power Uprate & Submits TS Changes in Jul 1999,per Licensee to NRC Re Increasing Power Output1999-06-29029 June 1999 Informs of Util Expectation to Complete Review of Final Rept Supporting Power Uprate & Submits TS Changes in Jul 1999,per Licensee to NRC Re Increasing Power Output ML20196H5171999-06-21021 June 1999 Requests Withholding of Info Being Presented in Meeting of Entergy,General Electric & NRC Staff.Licensee Requested Meeting with NRC to Present Info on Recent Anomalous Conditions Found During Insp of Fuel Bundles.W/Affidavit 05000458/LER-1999-012, Forwards LER 99-012-00,IAW 10CFR73.Commitments Contained in Document Identified on Commitment Identification Form1999-06-21021 June 1999 Forwards LER 99-012-00,IAW 10CFR73.Commitments Contained in Document Identified on Commitment Identification Form RBG-45035, Requests That Encl RBS Fuel Recovery Info Be Withheld from Public Disclosure,Per Provisions of 10CFR2.790(a)(4).Info Is Being Presented at Meeting to Discuss Recent Anomalous Conditions Found.Proprietary Info Withheld1999-06-21021 June 1999 Requests That Encl RBS Fuel Recovery Info Be Withheld from Public Disclosure,Per Provisions of 10CFR2.790(a)(4).Info Is Being Presented at Meeting to Discuss Recent Anomalous Conditions Found.Proprietary Info Withheld ML20196E0601999-06-18018 June 1999 Forwards Insp Rept 50-458/99-05 on 990418-29.Four Violations Identified & Being Treated as Noncited Violations 05000458/LER-1999-011, Forwards LER 99-011-00 for River Bend Station,Unit 1,IAW 10CFR50.73.Commitments Identified in Rept,Encl1999-06-0909 June 1999 Forwards LER 99-011-00 for River Bend Station,Unit 1,IAW 10CFR50.73.Commitments Identified in Rept,Encl 1999-09-09
[Table view] Category:NRC TO UTILITY
MONTHYEARML20062G5771990-11-23023 November 1990 Forwards Insp Rept 50-458/90-31 on 901105-09.No Violations or Deviations Noted IR 05000458/19900151990-11-21021 November 1990 Ack Receipt of Informing NRC of Steps Taken to Correct Violations Noted in Insp Rept 50-458/90-15 ML20062E4031990-11-15015 November 1990 Discusses Util Response to NRC Bulletin 88-010, Nonconforming Molded-Case Circuit Breakers ML20058H5481990-11-14014 November 1990 Informs That Util 900529 Changes to Physical Security Plan Unacceptable Under Provisions of 10CFR50.54.Proposed Changes Decrease Effectiveness of Physical Security Plan ML20217A3511990-11-0909 November 1990 Forwards Insp Rept 50-458/90-25 on 900924-28 & 1015-19. Violation Noted But Not Cited ML20058D0401990-10-29029 October 1990 Forwards Physical Security Insp Rept 50-458/90-24 on 900910-14. Violations Not Cited Per 10CFR2 IR 05000458/19900161990-10-20020 October 1990 Ack Receipt of 900830 & 1011 Ltrs Responding to 900730 Notice of Deviation & 900907 & 22 Telcons,Per Insp Rept 50-458/90-16 ML20058B0131990-10-19019 October 1990 Forwards Insp Rept 50-458/90-28 on 901009-12.No Violations or Deviations Noted ML20058D9531990-10-18018 October 1990 Forwards Ref Matl Requirements for Reactor/Senior Reactor Operator Licensing Exams Scheduled for 901114 ML20058A5421990-10-17017 October 1990 Forwards Insp Rept 50-458/90-23 on 900910-14.No Violations or Deviations Noted ML20058A2191990-10-11011 October 1990 Forwards Summary of 900917 Mgt Meeting at Licensee Site Re Activities Conducted Under License NPF-47 IR 05000458/19900021990-10-0808 October 1990 Ack Receipt of Re Violations Noted in Insp Rept 50-458/90-02 ML20059N4721990-10-0303 October 1990 Forwards Insp Rept 50-458/90-22 on 900827-31.No Violations or Deviations Noted ML20059D6411990-08-29029 August 1990 Forwards Insp Rept 50-458/90-15 on 900611-15.No Violations or Deviations Noted ML20056B2461990-08-22022 August 1990 Forwards Insp Rept 50-458/90-20 on 900723-26.No Violations or Deviations Noted.However,Inability to Acquire & Retain Seasoned Instructors W/Substantial Operations Experience Apparently Affecting Quality of Operator Training IR 05000458/19900061990-08-21021 August 1990 Ack Receipt of Informing NRC of Steps Taken to Correct Weaknesses Noted in Insp Rept 50-458/90-06 ML20056B2921990-08-14014 August 1990 Requests Submittal of Final Analysis of Combustible Gas Control Sys,Per 10CFR50.44,by 910301,addressing Key Elements in Encl SER IR 05000458/19892001990-08-0909 August 1990 Discusses Insp Rept 50-458/89-200 on 891023-27 & 1113-17 & Forwards Notice of Violation ML20056A7521990-08-0303 August 1990 Discusses Util 891220 Response to Generic Ltr 89-10 Re safety-related motor-operated Valve Testing & Surveillance. Util Schedule for Completing Phase I of motor-operated Valve Program in Four Refueling Outages Acceptable ML20056A7681990-08-0202 August 1990 Ack Withdrawal of Proposed Amend to License NPF-47,allowing One Loop of RHR to Be Used for ECCS & for Shutdown Cooling. Util Resubmittal of Proposed Amend Following Completion of Generic Study Recommended ML20058L5361990-08-0101 August 1990 Forwards Electrical Distribution Sys Functional Insp Rept 50-458/90-200 on 900521-0622 & Notice of Violation ML20055G5241990-07-18018 July 1990 Forwards Fr Notice Re Util Withdrawal of 900202 Amend to License NPF-47,per .Amend Modifies Tech Specs Re Div I & II Diesel Generator Crankshaft Insp Scheduling & Surveillance Requirements IR 05000458/19900411990-07-0505 July 1990 Ack Receipt of 900614 & 0209 Ltrs Informing NRC of Steps Taken to Correct Violations Noted in Insp Rept 50-458/90-41 ML20055D5211990-06-27027 June 1990 Forwards Insp Rept 50-458/90-14 on 900521-22.One self-identified Violation Noted But Not Cited ML20055F1861990-06-27027 June 1990 Forwards Safety Evaluation Accepting Util Proposed Changes Re Scram Accumulator Check Valves ML20055D0981990-06-25025 June 1990 Reviews Util 900406 Response to Violation Noted in Investigation Rept 50-458/90-43 Re Unescorted Access for Two Welding Svcs,Inc Employees to Plant Protected Area. Violation Properly Classified as Severity Level IV ML20055D6581990-06-20020 June 1990 Ack Receipt of 900531 & s Informing NRC of Steps Taken to Correct Violations Noted in Insp Rept 50-458/89-31 ML20059M9441990-06-13013 June 1990 Forwards NRC Performance Indicators for First Quarter 1990. W/O Encl ML20055D0021990-06-11011 June 1990 Discusses Util 900514 Application for Amend to License NPF-47,increasing Suppression Pool Temp from 95 F to 100 F. Requests That Util Demonstrate Applicability of Items Addressed in Encl Hatch Safety Evaluation to Facility ML20055C3071990-02-23023 February 1990 Advises That 891027 Changes to Emergency Plan,Acceptable ML20248A3051989-09-26026 September 1989 Forwards Insp Rept 50-458/89-33 on 890801-31.No Violations or Deviations Noted ML20247Q7221989-09-22022 September 1989 Forwards FEMA Exercise Evaluation Rept of Plant Emergency Preparedness Exercise on 890301.No Deficiencies Observed During Exercise.W/O Encl ML20248E5681989-09-21021 September 1989 Forwards Amend 3 to Indemnity Agreement B-104,reflecting Increase in Primary Layer of Nuclear Energy Liability Insurance ML20247P4951989-09-19019 September 1989 Ack Receipt of Informing NRC of Steps Taken to Correct Violations Noted in Insp Rept 50-458/89-28 IR 05000458/19890181989-09-11011 September 1989 Ack Receipt of Informing NRC of Steps Taken to Correct Violations Noted in Insp Rept 50-458/89-18 ML20247D4661989-09-11011 September 1989 Ack Receipt of Informing NRC of Steps Taken to Correct Violations Noted in Insp Rept 50-458/89-27. Understands That Comparison of Expanded Unreviewed Safety Question Committee Data Base Will Be Reviewed by Committee ML20247B0381989-09-0101 September 1989 Forwards Insp Rept 50-458/89-31 on 890701-31 & Notice of Violation ML20247C3081989-09-0101 September 1989 Summarizes 890822 Meeting W/Util in Region IV Ofc to Discuss Results of INPO Evaluation of Facility.List of Attendees Encl ML20247A1241989-08-30030 August 1989 Forwards Summary of Region Iv/Senior Util Executive Meeting on 890818.No plant-specific Issues Discussed at Meeting. Agenda & Attendees List Also Encl ML20247A6751989-08-28028 August 1989 Advises That 890424 Rev 3 to ODCM Acceptable,Per Encl Eg&G Idaho,Inc Comments.Remaining Questions Re Rev 3 in Encl Should Be Considered in Next Rev ML20246J0751989-08-21021 August 1989 Forwards Insp Rept 50-458/89-30 on 890619-23.Violation Noted ML20245H6631989-08-0707 August 1989 Forwards Insp Rept 50-458/89-32 on 890717-21.No Violations or Deviations Noted ML20245K0101989-08-0606 August 1989 Forwards Summary of 890727 Meeting W/Licensee in Region IV Ofc Re Plant Security Enhancement Program & Personnel Changes ML20247N7601989-07-31031 July 1989 Informs That 890719 Request for Withdrawal of Proposed Tech Specs 3.5.2,3.7.1.1,3.7.1.2 & 3.9.11.1 Changes,Submitted by Ltr W/Other Proposed Changes,Approved.No Addl Work Will Be Performed by NRC ML20247R2641989-07-28028 July 1989 Forwards Insp Rept 50-458/89-28 on 890601-30 & Notice of Violation.Notice of Violation Will Not Be Issued for Item Identified by Licensee ML20247M2581989-07-27027 July 1989 Forwards Insp Rept 50-458/89-25 on 890710-14.No Violations or Deviations Noted ML20247H4611989-07-26026 July 1989 Ack Receipt of Informing NRC of Steps Taken to Correct Violations Noted in Insp 50-458/89-11 1990-08-09
[Table view] Category:OUTGOING CORRESPONDENCE
MONTHYEARML20217L7681999-10-19019 October 1999 Forwards Insp Rept 50-458/99-12 on 990822-1002.Four Severity Level IV Violations of NRC Requirements Identified & Being Treated as non-cited Violations Consistent with App C of Enforcement Policy ML20217J3751999-10-15015 October 1999 Informs That Applicable Portions of NEDC-32778P, Safety Analysis Rept for River Bend 5% Power Uprate, Marked as Proprietary Will Be Withheld from Public Disclosure Pursuant to 10CFR2.790(b)(5) & Section 103(b) IR 05000458/19990071999-10-0505 October 1999 Refers to Util Ltr Re Apparent Violations Described in Insp Rept 50-458/99-07 Issued on 990804 & Forwards Nov.Insp Described Two Apparent Violations Related to River Bend Station Division I EDG ML20212D8901999-09-16016 September 1999 Discusses 6 Month Review of Plant Midcycle Ppr.Advises of Plans for Future Insp Activities.Forwards Historical Listing of Plant Issues,Referred to as PIM ML20216F7881999-09-15015 September 1999 Forwards Insp Rept 50-458/99-10 on 990830-990903.No Violations Noted.Insp Covered Licensed Operators Requalification Training Program & Observation of Requalification Activities ML20211Q7721999-09-0909 September 1999 Expresses Appreciation for ,In Response to NRC 990702 Re Denial of Notice of Violation Cited in Concerning Insp Rept 50-458/98-16.Reply Found to Be Responsive to Concerns Raised in NOV ML20211Q3921999-09-0808 September 1999 Forwards Insp Rept 50-458/99-08 on 990711-0821.One Violation Being Treated as Noncited Violation ML20211Q5541999-09-0808 September 1999 Discusses Meeting Conducted on 990830 in St Francisville,La Re Overall Performance Issues During 990403-0703 Refueling/ Maintenance Outage.Due to Proprietary Nature of Some Subject Matters,Meeting Closed to Public.Attendance List Encl ML20211E2071999-08-23023 August 1999 Discusses Insp Rept 50-458/99-07 in Which 2 Violations Were Identified & Being Considered for Escalated Enforcement Action.Response Should Be Submitted Under Oath or Affirmation ML20211A9291999-08-17017 August 1999 Forwards Insp Rept 50-458/99-11 on 990719-23.Areas Examined Included Portions of Licensee Physical Security Program. No Violations Noted ML20210T8881999-08-16016 August 1999 Forwards Replacement Pages 9-18 for Insp Rept 50-458/99-09, Issued on 990730 IR 05000458/19980101999-08-13013 August 1999 Forwards Summary of 990805 Mgt Meeting with Licensee in Arlington,Tx Re Radiological Control Problems Noted in Insp Repts 50-458/98-10 & 50-458/99-04.With Attendance List & Licensee Presentation ML20211A9501999-08-12012 August 1999 Discusses 990720-21 Workshop Conducted in Region IV Ofc,Re Exchange of Info in Area of Use of Risk Insights in Regulatory Activities.List of Attendees,Summary of Topic & Issues,Agenda & Copies of Handouts Encl ML20210U3751999-08-12012 August 1999 Informs That Info Contained in Presentation, River Bend Station Fuel Recovery Project,Dtd 990622, Will Be Withheld from Public Disclosure Pursuant to 10CFR2.790(b)(5) & Section 103(b) of Atomic Energy Act of 1954,as Amended ML20210Q7691999-08-11011 August 1999 Forwards Request for Addl Info Re Licensee River Bend Individual Plant Exam External Events,Under GL 88-20,suppl 4,dtd 910628 ML20210R4591999-08-10010 August 1999 Ack Receipt of Which Transmitted Plant Emergency Plan,Rev 20 Under Provisions of 10CFR50,App E,Section V.Nrc Approval Not Required,Based on Determination That Changes Does Not Decrease Effectiveness of EP ML20210N1641999-08-0404 August 1999 Forwards Insp Rept 50-458/99-07 on 990530-0710.One Violation of NRC Requirements Occurred & Being Treated as NCV, Consistent with App C of Enforcement Policy ML20210K4641999-08-0303 August 1999 Forwards SE Accepting Licensee 180-day Response to GL 95-07, Pressure Locking & Thermal Binding of Safety-Related Power Power-Operated Gate Valves, Issued on 950817 ML20210L1461999-08-0303 August 1999 Informs That NRC Plans to Administer Gfes of Written Operator Licensing Exam on 991006.Requests Submittal of Ltr Identifying Individuals Taking Exam,Personnel Allowed Access to Exams & Mailing Address for Exams ML20210K1351999-07-30030 July 1999 Forwards Insp Rept 50-458/99-09 on 990510-28 with in-office Insp Until 990701.Three Violations Being Treated as Noncited Violations ML20210J9691999-07-30030 July 1999 Discusses 990719 Meeting with Util in Arlington,Tx Re Region IV Staff Findings of Root Cause Investigation Into Fuel Cladding Failures That Occurred During Recent Cycle 8 Operation.List of Attendees & Organization Chart Encl ML20210E9001999-07-23023 July 1999 Informs That as Result of Staff Review of Licensee Responses to GL 92-01,rev 1,Suppl 1 & Suppl 1 Rai,Staff Revised Info in Reactor Vessel Integrity Database & Releasing Database as Rvid Version 2 ML20196L0501999-07-0606 July 1999 Informs That NRC Insp Rept 50-458/99-03 Issued on 990519 with Errors in Tracking Numbers Assigned to Seven Noncited Violations & Error Re Actual Location of SRO During Refueling Activities.Revised Pages 2 & 4 Encl ML20196K6851999-06-30030 June 1999 Ack Receipt of & Denial of NOV in Response to Transmitting NOV & Insp Rept 50-458/98-16.Listed Info Documents Results of Review of Response to Violation Re fire-induced Circuit Faults ML20196K0671999-06-30030 June 1999 Forwards Insp Rept 50-458/99-04 on 990412-16 & 28-29.Five Violations of NRC Requirements Occurred & Being Treated as Noncited Violations,Consistent with App C of Enforcement Policy.Meeting Scheduled for 990726 ML20196E0601999-06-18018 June 1999 Forwards Insp Rept 50-458/99-05 on 990418-29.Four Violations Identified & Being Treated as Noncited Violations ML20195G3121999-06-0909 June 1999 Ack Receipt of Re Changes to River Bend Station Emergency Plan,Rev 19.No Violations of 10CFR50.47(b) Were Identified ML20195G3671999-06-0909 June 1999 Ack Receipt of Ltr Dtd 981016,which Transmitted River Bend Station Emergency Plan,Rev 18 Under Provision of 10CFR50, App E,Section V.No Violations of 10CFR50.54(q) Identified During Review ML20195D6041999-06-0303 June 1999 Discusses EOI Request That Attachment 4,NEDC-32549P, Safety Review for River Bend Station Cycle 7 Final Feedwater Temp Reduction, Rev 0,be Withheld from Public Disclosure. Determined Info Proprietary & Will Be Withheld DD-99-08, Informs That to Extent That Union of Concerned Scientists Requests Commission Undertake Formal Review of DD-99-08 & Hold Meeting to Directly Receive View on Decision,Request Denied.With Certificate of Svc.Served on 9905211999-05-20020 May 1999 Informs That to Extent That Union of Concerned Scientists Requests Commission Undertake Formal Review of DD-99-08 & Hold Meeting to Directly Receive View on Decision,Request Denied.With Certificate of Svc.Served on 990521 ML20206U4321999-05-18018 May 1999 Forwards Notice of Withdrawal of Licensee 961106 Request for Approval of Deviation from Approved Fire Protection Program to Extent Program Incorporated Technical Requirements of Section III.G.2 of App R to 10CFR50 ML20206U6081999-05-18018 May 1999 Forwards Insp Rept 50-458/99-03 on 990307-0417.Eight Violations of NRC Requirements Identified & Being Treated as Noncited Violations Consistent with App C of Enforcement Policy ML20207A8051999-05-15015 May 1999 Forwards Insp Rept 50-458/99-06 on 990419-23.No Violations Noted.Inservice Insp Activities at River Bend Station Were Being Implemented in Accordance with ASME Code & Regulatory Requirements ML20206N7081999-05-12012 May 1999 Informs That NRC Ofc of NRR Reorganized,Effective 990328. Reorganization Chart Encl ML20206N8811999-05-12012 May 1999 Forwards Notice of Withdrawal of 981120 Amend Request for License NPF-47.Proposed Amend Would Have Established New TS 3.10.9, Control Rod Pattern - Cycle 8, Added to Section 3.10, Special Operations ML20206H9191999-05-0707 May 1999 Informs That on 990407,NRC Administered Generic Fundamentals Exam Section of Written Operators Licensing Exam.Facility Did Not Participate in Exam,However Copy of Master Exam with Key Encl.Without Encl NUREG-1434, Discusses Licensee 960418 Request for Amend for Plant That Would Permit Addl Method of Fuel Movement & Loading in Core Upon Removal of Control Rods from Defueled Core Cells.Nei TSs Task Force Process Will Be Used to Review TSTF-2261999-05-0505 May 1999 Discusses Licensee 960418 Request for Amend for Plant That Would Permit Addl Method of Fuel Movement & Loading in Core Upon Removal of Control Rods from Defueled Core Cells.Nei TSs Task Force Process Will Be Used to Review TSTF-226 ML20206J2291999-05-0303 May 1999 Discusses Responding to NOV Issued on 990105.NOV Was Based on NRC Conclusions That Licensee Provided NRC Inspector with Info Licensee Knew Was Inaccurate & Incomplete ML20206E6381999-05-0303 May 1999 Ack Receipt of 990305,990315 & s Responding to NOV & Proposed Imposition of Civil Penalty, .EOI Paid Civil Penalty & Requested Withdrawal of NOV & Civil Penalty for Reasons Stated.Finds NOV & Civil Penalty Appropriate ML20206E4531999-04-27027 April 1999 Discusses Request That Attachment 4, Final Calculation of RBS Cycle 9 SLMCPR (Safety Limit for Mcpr), Submitted with 981216 License Amend Request,Be Withheld from Public Disclosure.Determined Info Proprietary & Will Be Withheld ML20206A2031999-04-21021 April 1999 Discusses EOI Second 10-year IST Program for River Bend Station Submitted on 980106 & 980910 Which Included One Pump Relief Request & Two Valve Relief Requests.Forwards SE Authorizing Pump Relief Request & One Valve Relief Request ML20205N7251999-04-13013 April 1999 Forwards Summary of 990408 Meeting with EOI in Jackson, Mississippi Re EOI Annual Performance Assessment of Facilities & Other Issues of Mutual Interest.List of Meeting Attendees & Licensee Presentation Slides Encl ML20205J5331999-04-0606 April 1999 Ack Receipt of Denying Request from NRC That Addl Info Be Provided Prior to Informal Public Hearing Held on 990222 Re River Bend Station & Perry Nuclear Power Plant 10CFR2.206 Petitions ML20205K0681999-04-0505 April 1999 Submits Summary of 990325 Meeting Re Engineering Performance at Site & Assessment of Organization Strengths & Opportunities for Improvement.List of Attendees & Matl Used in Presentation Enclosed ML20205A4531999-03-26026 March 1999 Forwards Insp Rept 50-458/98-10 on 990222-26.Violation Noted & Being Treated as Non-Cited Violation.Concludes That Radiation Work Permit Program Poorly Implemented Until July 1998 Because of Inadequate Program Implementing Procedures ML20205D7691999-03-26026 March 1999 Forwards Insp Rept 50-458/99-02 on 990124-0306.One Violation Identified & Being Treated as non-cited Violation.Licensee Conduct of Activities During Insp Generally Characterized by safety-conscious Operations & Sound Engineering ML20205D5361999-03-26026 March 1999 Forwards Ser,Accepting Util 980107 Request for Alternative to Augmented Reactor Pressure Vessel Exam Requirements for Plant,Unit 1 Pursuant to 10CFR50.55a(g)(6)(ii)(A) for First 10-year Insp Interval.Technical Ltr Rept Also Encl ML20204G8081999-03-24024 March 1999 Refers to 990303 Reply to NRC NOV & Proposed Imposition of Civil Penalty .Since Licensee Paid Civil Penalty & C/A Found Responsive to NRC Concerns,Matter Considered Closed ML20205A4021999-03-23023 March 1999 Forwards Insp Rept 50-458/99-301 on 990222-0303.No Violations Noted.Insp Included Evaluation of Three Applicants for Senior Operator Upgrade & for Senior Operator Instant & Eight Applicants for Reactor Operator License ML20205F3131999-03-19019 March 1999 Advises of Planned Insp Effort Resulting from River Bend PPR Review,Which Was Completed on 990211.Performance of River Bend Staff During Assessment Period Was Acceptable 1999-09-09
[Table view] |
Text
-
.x , .
In R_eply Refer To:
' Docket: 50-458/0L-88-01 APR l 51988 Gul f -States- Utilities ATTN: Mr.' James C. Deddens Senior Vice President (RBNG)
P.O. Box 220 St. Francisville, Louisiana 70775 Gentlemen:
SUBJECT:
OPERATOR LICENSING EXAMINATIONS AT RIVER BEND STATION (RBS)
In-a telephone conversation between Messrs. Richard Jackson, RBS Training Coordinator, and David Graves, Operator Licensing Examiner, arrangements were made for the administration of reactor operator and senior operator license examinations at RBS during the week of July 11, 1988.
In order for NRC to meet the above schedule, it will be necessary for facility
-management to furnish the approved reference material listed in Enclosure 1, "Reference Material Requirements for Reactor /SeniorsReactor Operator Licensing Examinations," to the extent it is available at your'far<ility, by May 11, 1988. Any delay in receiving properly bound and indexed'refetence material may result in a delay in administering the examinations. Examihattons are scheduled far in advance with considerable planning to utilize limitTed s exeniner manpower chd to meet, the examination dates requested by the vari'ous, .
facility licensees. Therefore, missing the May 11, 1988, deadline, even by as few days, may result i_n a long delay because it may not be possible to N reschedule examinations for other facility licensees. Mr. Jackson has been advised of'our' reference material requirements.
The facility management is responsible for providing adequate space and accommodations in order to properly conduct the written examinations.
Enclosure 2, "Administration of Reactor / Senior Reactor Operator Licensing Written Examinations," describes NRC requirements for conducting these examinations. Hr. Jackson has also been informed of these requirements.
In addition, to better document simulator examinations, the chief examiner will have the facility simulator operator record prespecified plant conditions (i.e.,
plant pressure, temperature, pressurizer level, etc.), for each simulator scenario. The candidate will be responsible for providing this information, along with any appeal of his simulator operating examination. Therefore, the facility training staff should retain the simulator examination scenario information until all candidates taking the examination have either passed the operating examination or all appeals filed by the candidates who failed the operating examination have been complete .
RE gno C:0LS M rifR D:DRPb DGraves:cs JPellet Mil hoan LCa 4/N/88 4/F/88 4/#/88 4/p/1
/88an s\
fgg42ggggggggg gg DCD L__ _ __ _ _ _ _ J
Gulf States Utilities 1 l
Reactor operator and senior reactor operator license applications for all candidates should be submitted at least 60 days before the first scheduled :
examination date so that.the NRC will be able to review the training and '
experience of the candidates, process medical certifications, and issue examiner assignments. If copies of the applications are not received at least 30 days before the examination date, it is likely that a postponement will be necessary. All training and qualification requirements must be met by each candidate prior to applicat'on submittal.
Until December 31, 1988, in order to allow you to modify your training program so that all training is completed prior to submission of an application, you are permitted to request an exemption of this certification requirement. This can be done by lining through the language in Item 19.b on the application, NRC Form 398, concerning completion of licensee requirements and by referencing a separate attachment to the application containing the following language:
The applicant has not yet successfully completed the licensee requirements to be licensed as an Operator / Senior Operator. However, he/she will have completed them prior to the examination. Upon completion of the requirements, a certification to that effect will be provided as a further addendum to this application. In the interim, it is requested, pursuant to 10 CFR 55.11, that the applicant be exempted from this requirement, as contained in 10 CFR 55.31(a)(4).
l 4
. Printed Name and Signature-Training Printed Name and Signature-Senior Coordinator Management Representative on Site
'Once the applicant completes the training requirements, an addendum to NRC Form 398 would be required to be sent. This addendum must be received prior to the examination date. The format and content of this addendum should read as follows:
Addendum to NRC Form 398 i Application of 4
Facility Name Printed Name and Signature-Training Printed Name and Signature-Senior Coordinator Management Representative on Site l This is to certify that has successfully completed the
- licensee requirement for licensing, as required under 10 CFR 55.31(a)(4),
l l
r -
4 Addendum to NRC Form 398*
Application of-Facility Name Printed Name and Signature-Training _ Printed Name and Signature-Senior
' Coordinator Management Representative on Site This is to certify that has successfully completed the
' licensee requirement for licensing, as required under 10 CFR 55.31(a)(4).
This request for-information was approved by the Office of Management and Budget ~under Clearance No. 3150-0101, which expires May 31, 1989. Comments on burden and duplication may be directed to the Office of Management and Budget, Reports Management' Room 3208, New Executive Office Building, Washington, DC 20503.
Thank you for your consideration in this matter. If you have any questions regarding the examination procedures and requirements, please contact Messrs. John L. Pellet, Chief, Operator Licensing Section, at (817)860-8159 or David N. Graves, Cperator Licensing Examiner, at (817)860-8168.
Sincerely, Original Signed By L,J.Cailan L. J. Callan, Director Divisiun of Reactor Projects
Enclosures:
- 1. Reference Material Requirements
- 2. Written Exam Administration Requirements
- 3. Facility Review Requirements cc w/ enclosures:
Gulf States Utilities ATTN: J. E. Booker, Manager-River Bend Oversight
-P.O. Box 2951 Beaumont, Texas 77704 Gulf States Utilities ATTN: Les England, Director Nuclear Licensing - RBNG P.O. Box 220 St. Francisville, Louisiana 70775
s Gulf States Utilities Gulf States Utilities ATTN: Dale Andrews Manager, Nuclear Training P.O. Box 220 St. Francisville, Louisiana 70775 Louisiana State University, Government Documents Department Louisiana Radiation Control Program Director bec w/ enclosures:
bec to DMB (IE42) bec distrib. by RIV:
DRP Resident Inspector R. D. Martin, RA Section Chief (DRP/C)
Lisa Shea, RM/ALF MIS System RPSB-DRSS RSTS Operator Project Engineer, DRP/C RIV File W. Paulson, NRR Project Manager DRS TSS D. Graves J. Pellet
ENCLOSURE 1 REFERENCE MATERIAL REQUIREMENTS FOR REACTOR / SENIOR REACTOR OPERATOR LICENSING EXAMINATIONS
- 1. Existing learning objectives and lesson plans (including training manuals, plant orientation manual, system descriptions, reactor theory, thermodynamics, etc.).
Training materials should include all substantive written material used for preparing candidates for initial R0 and SR0 licensing. The written material shoula be inclusive of learning objectives and the details presented during lecture, rather than outlines. ~ Training materials should be identified by plant and unit, bound, and indexed. Failure to provide complete, properly bound and indexed reference material will result in canceling and rescheduling of the examinations. Training materials which include the following should be provided:
System descriptions including descriptions of all operationally relevant flow paths, components, controls and instrumentation.
System training material should draw parallels to the actual procedures used for operating the applicable system.
Complete and operationally useful descriptions of all safety-system interactions, and, where available, B0P system interactions under emergency and abnormal conditions, including consequences of anticipated operator error, maintenance error, and equipment failure.
Training materid usaJ to clarify and strengthen understanding of emergency operating procedures.
Comprehensive thenry material that includes fundamentals in the area of theory of rea.: tor operation, thermodynamics, heat transfer, and l fluid flow, as well as specific applications to actual in plant components, For example, mechanical theory material should include pump theory as well as descriptions of how these principles actually apply to major plant pumps and the system in which they are installed 1 (i.e., reactor coolant pumps, all ECCS pumps, recirculation pumps, feedwater, and emergency feedwater pumps). Reactor theory material should include descriptions that draw explicit ties between the fundamental and actual operating limits followed in the plant (e.g. ,
reactor theory material should contain explanations of how principles relate to the actual curves used by operators to verify shutdown margin or calculate an ECP).
l
i l
2 .' Procedure Index (alphabetical by subject).
- 3. All administrative. procedures (as applicable to reactor operation or safety).
- 4. All integrated plant procedures (normal or general operating procedures).
- 5. Emergency procedures (emergency instructions, abnormal, or spacial procedures).
- 6. Standing orders (important orders that are safety related and may supersede the regular procedures).
, 7. Fuel handling and core-loading procedures, (initial core-loading procedure, when appropriate).
i
- 8. Radiation protection manual (radiation protection manual or procedures).
- 9. Emergency plan implementing procedures.
- 10. Technical Specifications.
- 11. System operating procedures.
- 12. Piping and instrumentation diagrams, electrical single-line-diagrams, or 1 flow diagrams.
- 13. Technical data book, and/or plant curve information as used by operators and facility precautions, limitations, and set points (PLS) for the facility.
- 14. Questions and answers that the facility licensee has prepared (voluntary by facility licensee).
- 15. The following on the plant reference simulation facility:
- d. List of all readily available initialization points.
- b. List of all preset malfunctions with a clear identification number.
The list should includa cause and effect information. Specifically for each malfunction, a concise description of the expected result, or range of results, that will occur upon implementation should be provided. Additionally, an indication of which annunciators are to
, be initially expected should be given.
- c. A description of simulator failure capabilities for valves, breakers, indicators, and alarms.
- d. Where the capability exists,. an explanation of the ability to vary the severity of a particular malfunction should be provided, i.e. ,
the ability to vary the size of a given LOCA or steam leak, or the ability to cause a slow failure of a component such as a feed pump,
' turbine generator, or major valve (e.g., drifting shut of a main feedwater control valve),
- e. An indication of modeling conditions or problems that may impact the examination.
- f. Identification of unknown Performance Test Failures not yet completed.
- g. Identification of significant differences between the simulator and the control room.
- h. Copies of facility licensee generated scenarios that expose the candidates to situations of degraded pressure control (PWR), degraded heat removal capability (PWR and BWR), and containment challenges (BWR) may be provided (voluntary by facility licensee).
- i. Simulator instructors manual (voluntary by facility licensee).
- j. Description of the scenarios used for the training class (voluntary by facility licensee). .
- 16. Additional material required by the examiners to develop examinations that meet the requirements of these standards and regulations.
The above reference material should be approved, final issued, and so marked.
If a plant has_not finalized some of the material, the chief examiner is responsible for ensuring that the most complete, up-to-date material is available and that agreement has been reached with the facility licensee for limiting changes before the administration of the examination. All procedures and reference material should be bound or IN THE FORM VSED BY THE CONTROL ROOM OPERATORS, WITH appropriate INDEXES or TABLES OF CONTENTS so that they can be used efficiently.
i q._,c-v-_w --y- .- rr m.- , , ,ww,.g, , , - ., y,_- ,,,p,,_,.rw m - y - wgr -.>,m,4,y, g-,3,--w-eweg# -,w 9-r-.y yp--y--.y. - - -+m ew m g e ye. w-=
-7, 79
1 ENCLOSURE 2 REQUIREMENTS FOR ADMINISTRATION OF WRITTEN EXAMINATIONS
- 1. A single room shall be provided for completing the written examination.
. The location of this room and supporting restroom facilities shall be such as to prevent contact with.all other facility licensee and/or contractor personnel during the duration of the written examination. .If necessary, the facility licensee should make arrangements for use of a suitable room at a local school, motel, or other building. Obtaining this room is the responsibility of the fa;ility licensee.
- 2. Minimum spacing is required to ensure examination integrity as determined by the chief examiner. Minimum spacing should be one candidate per table, with a 3-foot space between tables. No wall charts, models, and/or other training materials shall be present in the examination room.
- 3. Suitable arrangements shall be made by the facility licensee if the candidates are to have lunch, coffee, or other refreshments. These arrangements shall comply with Item 1 above. These arrangements shall be reviewed by the chief examiner and/or proctor.
- 4. The facility licensee shall provide pads of 8 1/2- by 11-in. lined paper in unopened packages for each candidate's use in completing the examination. The examiner shall distribute these pads to the candidates. '
The facility licensee shall provide unmarked steam tables for candidate use as reouested by the chief examiner. When requested by the chief ,
examiner, the facility licensee shall also orepare copies of large documents (i.e., Technical Specifications, Emergency Plan Implementing >
Procedures, Emergency Operating Procedures, etc.) for use by the candidates. Such requests will normally be made known to the facility licensee the working day prior to the written examination. All other reference material needed to complete the examination shall be furnished by the examiner. Candidates may bring pens, pencils, non programable calculators, or slide rules into the examination room. No other equipment or reference material shall be allowed.
- 5. Only black ink or dark pencils should be used for writing answers to questions.
i
., . - , - - . . ~ . - - - _ _ , _ . _ . - - - - . . , , , - , - , , . . . - , - . .-. ,
l
- 3 ENCLOSURE 2 (continued)
NRC RULES AND GUIDELINES FOR LICENSE EXAMINATIONS
)
l During the administration of this examination, the following rules apply:
- 1. Cheating on the examination means an automatic denial of your application and could' result in more severe penalties.
- 2. Restroom trips are to be limited and only_one candidate at a time may leave. You must avoid all contacts with anyone outside the examination room to avoid even the appearance or'p.ssibility of cheating.
- 3. Use black ink or dark pencil only to facilitate legible reproductions.
- 4. Print your-name in the blank provided on the cover sheet of the examination.
- 5. Fill in the date on the cover sheet of the examination (if necessary).
- 6. Use only the paper provided for answers.
- 7. Print' your name in the upper right-hand corner of the first page of each section of the answer sheet.
- 8. Consecutively number each answer sheet, write "End of Catego/y " as '
appropriate, start each category on a new page, write only one r.ide of the paper, and write "Last Page" on the last answer sheet.
- 9. Number each answer as to category and number, for example,1.4, 6.3, etc.
- 10. Skip at least three lines between each answer, i
- 11. Separate answer sheets from pad and place finished answer sheets face down on your desk or table. .
- 12. Use abbreviations only if they are commonly used in facility literature.
- 13. The point value for each question is indicated in parentheses after the question and can be used as a guide for the depth of answer required.
- 14. Show all calculations, methods, or assumptions used to obtain an answer to mathematical problems whether indicated in the question or not.
- 15. Partial credit may be given. Therefore, ANSWER ALL PAR 15 0F THE QUESTION. 00 NOT LEAVE ANY ANSWER BLANK.
- 16. If parts of the examination are not clear as to intent, ask questions of the examiner only.
- 17. You must sign the statement on the cover hseet that indicates that the work is your own and you have not received or been given assistance in completing the examination. This must be done after the examination has been completed.
E
+ ,
~2-
- 18. When you complete your examination, you shall:
- a. Assemble your examination as follows:
(1) Exam questions on top.
(2) Exam aids - figures, tables, etc.
(3) Answer pages including figures which are a part of the answer.
- b. Turn in your copy of the examination and all pages used to answer the examination questions.
- c. Turn in all scrap paper and the balance of the paper that you did not use for answering the questions.
- d. Leave the examination area, as defined by the examiner. If after leaving, you are found in this area while the examination is still in progress, your license may be denied or revoked.
., 9 , ', .{ ' y ENCLOSURE 3 REQUIREMENTS FOR FACILITY REVIEW 0F WRITTEN EXAMINATIONS
- 1. There shall be no review of the written examination by the facility licensee staff before or during the administration of the examination.
Following the administration of the written examination, the facility licensee staff shall be provided a marked-up copy of tne examination and the answer key.
- 2. Th'e facility licensee will have 5 working days from the day the written examination is given to submit formal comments. The formal comments will be approved by the highest level of corporate management for plant operations, e.g., Vice President for Nuclear Operations, and submitted.to the Region IV office w*th a copy.to the Section Chief for Operator Licensing. Comments not submitted within 5 working days will be incorporated into the grading process on a case-by-case basis as determined by the Section Chief. -No grading will be done until the formal comments are received and resolved. If the formal comments are not received by the deadline, the final examination results may be delayed several weeks since the grading may have to be rescheduled in a later time slot.
- 3. The following information shall be provided for each individual comment:
- a. HRC question nue.ber
- b. Facility licensee comment
- c. Copy of supporting documentation (the reference may be cited if the document is held by tha Operator Licensing Section)
NOTES: 1. No change to the examination will be made without submittal of, or proper reference to, complete, current, and approved reference material.
i
- 2. Comments made without a clear, concise, facility licensee recommendation, will not be addressed.
,