ML20151M426

From kanterella
Jump to navigation Jump to search
Confirms 880422 Mgt Meeting W/Util in Portland,Or to Discuss SALP Rept & Potential Enforcement Items,Per 880415 Telcon. Agenda & Meeting Notification Encl
ML20151M426
Person / Time
Site: Trojan File:Portland General Electric icon.png
Issue date: 04/15/1988
From: Kirsch D
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION V)
To: Cockfield D
PORTLAND GENERAL ELECTRIC CO.
References
NUDOCS 8804250051
Download: ML20151M426 (5)


Text

__ __ _ _ -_ _ __.

-r APR 151989 l

e Docket No.-50-344-Portland General Electric Company 121 S. W. Salmon Street Portland, Gregon 97204 Attention:

Mr. D. W. Cockfield Vice President, Nuclear-4 i

Gentlemen:

SUBJECT:

MANAGEMENT MEETING TO DISCUSS SALP REPORT AND POTENTIAL ENFORCEMENT ITEMS This will confirm the telephone discussion between Mr. T. Walt of your staff and Mr. M. Mendonca of this office on April 15, 1988, concerning the subject traeting to be held between NRC and Portland General Electric Company representatives in your Portland Offices' conference room at 8:00 a.m. on April 22, 1988.

Enclosure A lists the agenda items to ce discussed during this meeting, and Enclosure B provides our internal meeting notice which lists i

the anticipated attendees at this meeting.

l Sincerely, oiVnn1 @id Sf D, f, foiF.h,

l i

I D. F. Kirsch, Director Division of Reactor Safety and l

Projects

Enclosures:

A.

Meeting Agenda i

D.

Notice of Significant Meeting i

i i

cc w/ enclosures:

i C. A. Olmstead, PGF L. A. Girard, PGE i

W. Dixon, DOE i

i t

m

\\

I l

l

/

8804250051 880415

,A' h PDR ADOCK 05000344 I

V I

l Q

DCD

/

P

<jf 9 APR 151983 bcc w/ enclosures:

Project Inspector Resident Inspector D. Persinko, NRR G. Cook, RV

8. Faulkenberry, RV J. Martin, RV docket file J. M. Taylor, ED0 Director, PPAS, NRR D. Crutchfield, DRSP, NRR J. Partlow, DRIS, NRR R. Starostecki, ADT, NRR J. Lieberman, OE, ED0 J. Goldberg, GC G. Knighton, FD5, NRR F. Hebdon, ILRB, NRR C. Trammell, PM NRR NRC Attendees bec w/o enclosures:

LFNB M. Smith REGION V DKi(sch RZikpg erman AJo son DPereira/ dot PFendonca f

4// /88 4/15/88 4/t 88 4// /88 4/ /88 PE W EST COPY REQUEST COPY ESTCOPY]I #ES) / N0 l(TES) / NO l REQUEST COPY l RE(UEST COPY R

YES / N0 kfES T / NO I' ES

/ N0

~

v V

END TO POR YEs> / NO I

.j

-e.

i.

AGENDA MANAGEMENT MEETING AT PGE CORPORATE OFFICE April 22, 1988, 8:00 A.M.

J. B. Martin, Regional Administrator i

OPENING REMARKS M. M. Mendonca, Chief, Reactor Projects i

DISCUSSION OF SALP BOARD FINDINGS AND NRC CONCERNS Section 1 D. W. Cockfield, Vice President LICENSEE'S RESPONSE TO SALP BOARD FINDINGS Nuclear R.'C. Barr, Senior Resident Inspector i

DISCUSSION OF OPEN CONTAINMENT ISOLATION VALVES

.A. D. Johnson, Regional Enforcement (FEEDWATER DRAIN LINE),

Officer INOPERABLE CONTAINMENT i

ISOLATION VALVES (CHILLED i

WATER SYSTEM) OUTSIDE i

CONTAINMENT, AND SAFETY ANALYSIS INADEQUACY FOR CONTAINMENT ISOLATION ON AUXILIARY FEEDWATER TURBINE STEAM ADMISSION VALVE MODIFICATION D. W. Cockfield, Vice President LICENSEE'S RESPONSE Nuclear e

J. B. Martin, Regional Administrator CLOSING REMARKS F

ENCLOSURE A i

I i

i

i

,o Y

NOTICE OF SIGNIFICANT MEETING Name of Licensee:

Portland General Electric Company Name of Facility:

Trojan Docket Nos.:'

50-344 Date and Time April 22, 1988, 8:00 A.M.

of Meeting:

Location of Meeting:

Portland Office Conference Room Purpose of Meeting:

SALP Report Meeting and Management Meeting to discuss Potential Enforcement Items NRC Attendees:

J. B. Martin, Regional Administrator D. F. Kirsch, Director, Division of Reactor Safety and Projects A. D. Johnson, Regional Enforcement Officer R. P. Zimmennan, Chief, Reactor Projects Branch M. M. Mendonca, Chief, Reactor ProjectsSection I R. C. Barr, Senior Resident Inspector G. Y. Suh, Resident Inspector G. Knighton, PDS, NRR T. Chan, PM, NRR T. Foley, NRR Licensee Attendees:

D. W. Cockfield, Vice President Nuclear T. D. Walt. Manager, Nuclear Safety and Regulation Department C. A. Olmstead, Plant General Manager C. P. Yundt, General Manager, Technical Functions G. A. Zimmennan, Manager, Nuclear Regulation Branch J. W. Lentsch, Manager, Personnel Protection A. N. Roller, Manager, Nuclear Plant Engineering M. C. Street, Manager, Corporate Security L. W. Erickson, Manager. Quality Assurance D. W. Swan, Manager, Technical Services R. P. Schmitt, Manager, Operations and Maintenance Oregon Department of Energy Attendees:

W. Dixon H. Moomey, Oregon Resident Inspector NOTE:

Attendance at this meeting by NRC personnel other than those listed above should be made known by April 21, 1988, via a telephone call to M. M. Mendonca FTS 463-3720.

ENCLOSURE B

)

2 cc:

NRC Attendees listed above J. M. Taylor, EDO Director, PMAS, NRR T. Martin, ADT, NRR J. Lieberman, OE, ED0 J. Goldberg, GC D. Crutchfield, DRSP, NRR J. G. Partlow, DRIS, NRR G. Knighton, PDS, NRR F. Hebdon, ILRB, NRR T. Chan, PM NRR T. Foley, NRR D. B. Pereira, RV