ML20151M414

From kanterella
Jump to navigation Jump to search
Amends 123 to Licenses DPR-32 & DPR-37,respectively,revising Table 6.1-1, Min Shift Crew Composition, of Tech Specs to Increase Min Shift Manning Requirements for Auxiliary Operators from 3 to 4
ML20151M414
Person / Time
Site: Surry  Dominion icon.png
Issue date: 08/01/1988
From: Berkow H
Office of Nuclear Reactor Regulation
To:
Shared Package
ML20151M420 List:
References
NUDOCS 8808050155
Download: ML20151M414 (6)


Text

'-

e

/pa'no, h UNITED STATES y

[j, ch ' i

-NUCLEAR REGULATORY COMMISSION

,g

-l WASWNG TON. O. C. 20555

%r a

J y_lRGIhlA ELECTRIC _ AtlD POWER C0liPAllY DOCKET NO. C-280 SURRY POWER STATI0tl, UNIT fl0.-1 A!1ENDl4Eili TO FACILITY GPERATING LICEllSE Ariendment !!o.12 3 License flo. DPR 1.

The fauclear Regulatory Corrmission (the Cor.nission) has found that:

A.

The opplication for amendment by Virginia Electric and Power Company (the licensee) cated l'ay 25, 1988, complies with the standards and requirements of the Atomic Energy Act of 1954, as amended (the Act) and the Conraission's rules and regulations set forth in 10 CFR Chapter I; B.

The facility will operate in conformity with the application, the provisions of the Act, and the rules ana regulations of the Conmission; C.

There is reasonable assurance (i) that the activities authorized by this amendtrent can be coriducted without endangering the health ~

and safety of the public, and-(ii) that such ectivities will be conducted in compliance with the Commission's regulations; D.

The issuance of this amendtrent will r.ot be inimical to the comrr.on defense end security or to the-heelth and safety of the public;.

and E.

The issuance of this amendment is in accordance with 10 CFR Part 51 of the Connission's regulations and all applicable requirements have been satisfied.

2.

Accordingly, the license is smended by changes to the Technical Specifications as indicated ir, the ottachment to this license alcendment, and paragraph 3.8 of Facility Operating License No. DPR-32 is hereby ar,, ended to read as follows:

8808050155 880801 PDR ADOCK 05000280 P

PDC

. (B) Technical Specificatioris Th.- Technical Specific 6tions containeo in Appendix A, as revised thr cugh Arrencrerit f!o. I 2 3, are hereby incorpcrated in the license.

The licensee shall eperate the f6c11ity in accordance with the Technical Specific 6tions.

3.

This license arendment is effective as cf the date of its issuar.ce.

FOR ThE I!UCLEAR FECl:LATORY C0l'lilSS10tl

[A l'

H rbert fl. Berkow, Director Project Directorate II-2 Divisicr. cf Reactor Projects-I/Il Office of fiucleer Reactor Peculation Attachnent:

Changes to the Technical Specificaticns Cate of Istcer.ce:

August i, 1988

'f intog h

UNITED STATES 8(' r,- j[ h NUCLEAR REGULATORY COMMISSION

{

^'#/J lC '

WA5m NG TON. D. C. 20555 4.s+....f VIRGINIA ELECTRIC AND PCUER COMPAl1Y DOCKET 110. 50-281 SURRY POWER STATION, UllIT fl0. 2 AltENDMENT TO FACILITY OPERATIf1G LICEf1SE Auendment flo.123 License No. DPR-37 1.

The l;uclear Reculatory Consission (the Conmission) has found that:

A.

The application for aniencnent by Virginia Electric and Power Corapany (the licensee) dated flay 25, 1988, complies with the-standards end requirements of the Atomic Energy Act of 1954, as amended (the Act) and the Commission's rules and regulations set forth in 10 CFR Chapter I; L.

The facility will operate in conformity with the application, the provisions of the Act, and the rules and regulations of the Cor.cis sion; C.

There is reasonable assurance (i)'. that the activities authorized

-by this omendment can be conducted without endangering the health and safety of the public, and (ii) that such activit;ies will be conducted in conipliance with the Consission's regulations; D.

The issuance of this amencrtent will not be inimical to the corron defense and security or to the health and safety of the public; dMd E.

The issuance of this amendment is in accordance with 10 CFR Part 51 of the Comission's regulations and all applicable reouirements have been satisfied.

2.

Accordingly, the license is amended by changes to the Technical Specifications as indicated in the attachment to this license diaendment, and pardgraph 3.B of Facility Operating License flo. DPR-37 is hereby amended to read as follcws:

2 (B) Tech.i cc i Specifications The Technical Specificctions contained in Appendix A, as i evised tr.rcogh M,encu ent fio.12 3, are :ereoy incorporated in the license.

The licensee shall operate the fecility in accordance with the Technical S pe c i fi ca t t er.s.

3.

This license aiencraent is effective as of the date of its issuance.

FOR ThE hliCLEAR REGULATORY CCf'l11SSION O

1 j[

Herbert N. Berkou. Director Project Directorute 11-2 bivisior. cf Peactor Projects-I/II Office of fluclear Peoctor Regulation Atta chicent:

Changes to the Techr.ical Specifications Cate of Issuctice:

August 1, 1988

ATTAChl4ENT TO LICEflSE Af!EtlDriENT AMEi!Df!E.'IT f!0.12 3 FACILITY OPERATIllG LICEfiSE fl0. DPR-32 A!!ENDME."Tj0. 12 3 FACILITY CPERATIttG LICENSE fl0. CPR-37 DOCKET f.05. 50-280 At:0 50-281 Revise Appendix A as follw s:

Remove Page Irisert Pope TS 6.1-4 TS 6.1-4

1 IS 6.1-4 TABLE 6.1-1 MINIMN SHIFT CRFW COMPOSITION POSITION NWBER OF INDIVIDUALS REQUIRED TO FILL POSITION ONE UNIT TWO UNITS TWO UNITS IN COLD OPERATING OPERATING SHUTDOWN OR REFUELING SS 1

1 1

SRO 1

1 None RO 3

3 2

l A0 4

4 a

STA 1

1 None Amendrent ?!os.12 3 and 123

-