Text
_ _ _ _ . _ _ _ _ _ - _ - - _ _ _
'
.
. o
w.
APR I 51988
In Reply Refer To:
Dockets:
50-313/88-07
50-368/88-07
t-
Arkansas Power & Light Company
ATTH: Mr. Gene Campbell
Vice President, Nuclear
Operations
P.O. Box 551 -
Little Rock, Arkansas 72203
Gentlemen:
This refers to the inspection conducted by Messrs. R. C. Stewart and A. Singh
of this office during the period March 7-11, 1988, of activities authorized by
NRC Operating Licenses DPR-51 and NPF-6 for Arkansas Nuclear One, Units 1
and 2, and to the discussion of our findings with Mr. J. M. Levine and other
members of your staff at the conclusion of the inspection.
The area examined during the inspection was the Unit 2 inservice testing
program for pumps and valves. Within this area, the inspection consisted of
selective examination of procedures and representative records, interviews with
personnel, and observations by the NRC inspectors. The inspection findings are
documented in the enclosed inspection report.
Within the scope of the inspection, no violations or deviations were
identified.
Should you have any questions concerning this inspection, we will be pleased to
,
discuss them with you.
Sincerely,
Original Signed By
L. J. Callan
L. J. Callan, Director
Division of Reactor Projects
Enclosure:
Appendix - NRC Inspection Report
50-313/88-07
50-368/88-07
cc w/ enclosure:
(see next page)
b
RIV:M&QPS:RE* PSS:RE* C:M&QPS* D:DRS*
C:DRP/A
D:DR
Reconcu %
RCStewart/tw
ASingh
IBarnes
JLMilhoan DDChamberlain LJCal'an
IBarnes
f
/ /88
/ /88
/ /88
/ /88
4/lf/88
T/(f 88 er//f/88
N
$8g42ggggggggo
3
\\\\
'.- ,-
,
,
. . . .
Arkansas Power & Light' Company
-2-
cc w/ enclosure: Arkansas Nuclear One
ATTN:
J. M. Levine, Director
Site Nuclear Operations
P.O. Box 608
Russellville, Arkansas 72801
Arkansas Radiation Control Program Director
bectoDMB(IE01)IV:
bec distrib. by R
- RRI
R. D. Martin, RA
- RPSB-DRSS
- SectionChief(DRP/A)
Lisa Shea, RM/ALF
- RIV File
- DRP
- MIS System
- RSTS Operator
- Project Engineer, DRP/A
- G. Dick, NRR Project Manager
- R. Hall
- DRS
- TSS
D. Powers
- A. Singh
- R. C. Stewart
- w/766
l
,