7590-01 UNITED STATES NUCLEAR REGULATORY COMMISSION DUKE POWER COMPANY DOCKET NOS. 50-369 AND 50-370 NOTICE OF CONSIDERATION OF ISSUANCE OF AMENDNENTS TO FACILITY OPERATING LICENSES AND OPPORTl!NITY FOR HEARING The United States Nuclear Regulatory Comission (the Comission) is considering issuance of amendments to Facility Operating Licenses Nos.

NPF-9 and NPF-17 issued to Duke Power Company (the licensee), for operation of the McGuire Nuclear Station, linits 1 and ? located in Mecklanburn County, North Carolina.

The amendments would revise Technical Specification (TS) 3/A.7.13 "Groundwater t.avel" and referenred Table 3.7-7 "Groundwater level Monitors."

TS 3.7.13 presently requires that groundwater level be maintained at specii41 levels as detemined from eleven interior and exterior groundwater level monitors situated in or near the Reactor Buildings, the Auxiliarv Ru'1 ding and the Diesel Generator 9uildings. The proposed change would deleta the groundwater monitors for the Reactor Buildings and the Diesel Generator Buildirps, leaving only the five man'ters for the Auxiliary Ruilding. The change would introduce a revised groundwater level control strategy based upon a single alam level l

(731 feet MSL) for the Auxiliary Building monitors, and would change tha unit shutdown requirement fron one alamed monitor to three alamed ronitors out of 4

a total of five for the Auxiliary Ruilding. The licensea states that Duke

{

Design Engineering has performed analyses which show that the Deactor Buildirot and Diesel Generater Buildings een withstand a groundwater elevation corresponding to plant grade, 760 feet MSL (which is also tha full pond level for Lake Nomanl 8804220183 880415 ADOCK 0 % y9 DR

7590-01 !

and that. therefore, it is not necessary to continue monitoring the groundwater i

levels at lower elevations for these buildings.

Elevation 737 feet MSL was calculated to be the maximum level that groundwater could rise before overturning due to buoyancy would begin for the Auxiliary Building. To avoid reaching this level, the proposed TS would require that if groundwater level exceeds elevation 731 feet MSL as indicated by 3 of 5 monitor alarms, and cannot be reduced in one hcur, the McGuire Statien (both units) must be in at least hot standby within 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br />, and hot shutdown within the next 6 houis, and cold shutdown within the following 30 hours3.472222e-4 days <br />0.00833 hours <br />4.960317e-5 weeks <br />1.1415e-5 months <br />.

The associated surveillance requirements would i

be changed to require that (1) the groundwate invel be demonstrated each shif t to be belew elevation 731 feet MSL and (2) the groundwater level monitor instrunent/ loop for the specified locations be demonstrated operable arrually by loop calibration or operational test.

This notice supersedes the related previous notice in 50 FR 38914 dated September 25, 1985.

3 By May 23, 1988

, the licensee may file a request for a hearing with

]

respect to issuance of the amendrents to the subject facility operating licenses and any person whose interett may be affected by this proceedino and who wishes to participate as a party in the proceedino rust file a written reouest for

]

hearirg and a petition for leave to intervene.

Requests for a hearing and petitions for leave to intervene shall be filed in accordance with the Comission's "Rules of Practice for Dorestic Licensing Proceedings" in 10 CFR i

Part ?.

If a request for a hearing or petition for leave to intervene is filed j

by the above date, the Comission or an Atonic Safety and Licensiro Board, j

7590-01.

r designated by Commission or by the Chairman of the Atomic Safety and Licensing Board Panel, will rule on the request and/or petition, and the Secretary or the designated Atenic Safety and Licensing Board will issue a notice of hearing or an appropriate order.

As required by 10 CFR 62.714, a petition for leave to intervene shall set forth with particularity the interest of the petitioner in the proceeding, and how that interest nay be affected by the results of the proceeding.

The petition should specifically explain the reasons why intervention should be permitted with particular reference to the following factors:

(1)thenature of the petitioner's right under the Act to be nade a party to the proceeding; (2) the nature and extent of the petitioner's property, financial, or other interest in the proceeding; and (3) the possible effect of any order which nay be entered in the proceeding on the petitierer's interest. The petition should also identify the specific aspect (s) of the subject matter of the proceeding as to which petitioner wishes to intervene. Any person who has filed a petition for leave to intervene or who hat, been admitted as a party may amend the i

petition without requesting leave of the Board up to fifteen (15) days prior to the first prehearing conference scheduled in the proceeding, but such an amended t

petition must satisfy the specificity requirenents described above.

Not later than fifteen (15) days prior to the first prehearing conferenc scheduled in the proceeding, a petitioner shall file a supplement to the petition to intervene which must include e list of the contentions which arc sought to be litigated in the ratter, and the bases for each cc-tention set forth with reasonable specificity. Contentions shall be limited to matters

7590-01 4

a within the scope of the anendment under consideration. A petitioner who fails to file such a supplement which satisfies these requirements with respect to at ler.st one contention will not be permitted to participate as a party.

Those permitted to intervene become parties to the proceeding, subject to any linitations in the order granting leave to intervene, and have the opportunity to participate fully in the conduct of the hearing, including the opportunity to present evidence and cross-examine witnesses.

A request for a hearing or a petition for leave to intervene shall be filed with the Secretary of the Commission, United States Nuclear Regulatory

]

Comission, Washington, D.C.

20555, Attention: Docketing and Service Branch, or may be delivered to the Commission's Public Document Room, 1717 H Street, N.W.,.:ashington, D.C., by the above date.

Where petitions are filed during 1

the last ten (10) days of the notice period, it is required that the petitioner or representative for the petitioner promptly to inform the Comission by a i

toll-free telephone call to Western Union at 1-800-325-6000(inMissouri l-800-342-6700).

The Western Union operator should be given Datagram Identification Nur.ber 3737 and the following ressage addressed to Lawrence P.

Crocker, Acting Director, Project Directorate !!-3; (petitioner's name ano telephone number); (date Petition was nailed); (plant name); and (publicatien date and page number of this FECERAL REGISTER notice).

A copy of the petition i

shculd also be sent to the Office of the General Counsel, U.S. Nuclear Regulatory l

Comission, Washington, D.C.

20555, and to Mr. Albert Carr, Duke Power Comp 3ny, 422 South Church Street, Charlotte, North Carolina 28242.

I

-~

y e

,,,m,

,.,_.----a

+. - -,

,g

- -. -=

O 7590-01 5

Nontinely filings of petitions for leave to intervene, amended petitions, supplemental petitions and/or reouests for hearing will not be ~" cained absent a determination by the Cortnission, the presiding officer or the presiding Atomic Safety and Licensing Board, that the petition and/or request should be granted based upon a balancing of the fertors specified in 10 CFR 2.714(a)(1)(i)-(v) and 2.714(d).

If a request for hearing is received, the Conmission's staff nay issue the anendments after it completes its technical review and prior to the completion of any required hearing if it publishes a further notice for public corrent of its proposed finding of no significant hazards consideration in accordance with 10 CFR 50.91 and 50.92.

For further details with respect to this action, see the application for anendment dated January 27, 1988, which is available for public inspection at the Commission's Public Document Roon,1717 H Street, N.W., Washington, D.C.,

and at the Atkins library, tiniversity of North Carolina, Charlotte (UNCC Statinn),

North Carolina 28223.

th Dated at Rockville, Maryland, this 15 day of April 1988.

FOR THE NUCLEAR REGULATORY COPJi!SSION Original signed by:

Lawrence P. Crocker, Acting Project Director Projart Directorate 11-3 Division of Reactor Projects - I/II DISTRIBUTION:

Docket File PDII3 R/F DHood McGuire R/F OGC-WF MRoed Glainas Acting PD

.h./ j/

M H in MP /n PDII3/DRP-l/II PDII3/DRP-I/II OGC-WF f.,d(

r PDII /DR -l/II MRood DHood:pw

/*

Acting PD 3 /,/88 if/[>/88 er //6788 3 /p /88 J

-~

DISTRIBUTION:

Docket File PD II-3 Reading

('

DHood April 15, 1988 DOCKET NO.s. 50-369 Rules and Procedures Branch Division of Rules and Records MEMORANDUM FOR:

Office of Administration Office of Nuclear Reactor Regulation (Duke Power Company)

McGuire Mucicar Station, Units 1 and 2 FROM:

SUBJECT:

Ottice of the Federal h

fi d below is enclosed for your transmittal to t e One signed original of the Federal Register Notice identi e

) of the Notice are enclosed for your use.

Register for pubhcation. Addihonal conf ormed copies (

Permit (s) and Oper ating Ucense(s).

Notice of Receipt of Appbcation for Construction ti n Permit (s) and Facihty Notice of Receipt of Partial Apphcation for Construc o Matters.

License (s): Time f or Submission of Views on Antitrust Facility Operating License.

mental Report; and Notice of Consideratton of Issuance of Amendment to( ) Noti 0e of Availability of Applican i

Notice of Receipt of ADD cation for Facility License s ; License (s) and Notice of Opportunity fo fi Notice of Consideration of issugnce of Facihty ntal St at ement.

Notice of Availabihty of NRC DrafteFinsli:nvironme Notice of Limited Work Authorization.

Notice of Avadability of Saf ety Evaluation Report.

Notice of issuance of Construction Permit (s),

Amendment (s)

Notice of fssuance of Facihty Operating Ucense(s)or Order.

Exemption.

Notice of Granting Eiamption.

Environmental Assessment.

t Notice of Preparation of Environmental Assessmen.

Other Office of Nuclear Reactor Regulation Enclosure-A% stated knon*,f liarilee Rood p-21487 7

o"'c E ".PD.II,3 f

sum ut> 3 D"'" 4/15/88 OFFICI AL RECORD COPY

~ N A'C"0"*

g' DISTRIBUTION:

Decket File

[

PD II-3 Raaditig DHood April 15, 1988 POCKET NO.s. 50-369 Rules and Procedures Branch MEMORANDUM FOR:

Division of Rules and Records Office of Administration FROM:

OffMe of Nuclear Reactor Regulation susacT McGuire Nuclear Station, Units 1 and 2 (Duke Power Coagamy)

One signed original of the Federal Regisfer Notice identified below is enclosed for your transmittal to the Office of the Federal Register for publication. Additional conformed cop;es (

$ ) of the Notice are enclosed for your use.

Notice of Receipt of Application for Construction Permit (s) and Operating Licer se(s).

Notice of Receipt of Partial Application for Construction Permit (s)and Facility License (s): Time for Submission of Views on Antitrust Matters.

Notice of Consideration of issuance of Amendment to Facility Operating License.

Notice of Receipt of Application for Facility License (s); Notice of Availability of Applicant's Environmental Report; and Notice of Consideration of Issuance of Facility License (s) and Notice of Opportunity for Hearing.

Notice of Aval: ability of NRC Draft / Final Environmental Statement.

Not!ce of Limited Work Authodtation.

Notice of Availability of Safety Evaluation Report, Notice of issuance of Construction Permit (s).

Notice of lasuance of Facility Operating License (s) or Amendment (s).

Order.

Exemrlion.

ON

. of O, anting e,empiion.

Ervaronmental Assessment.

Notice of Preparation of Environmental Assessment.

Other:

J Of fice of Nuclear Reactor Regulation i

I

Enclosure:

As stated i

No"n*,f Hartlee Rood

.1487 1 ornes*

,pp.1x,3,

~

unwaws >,d),,,

  • * " *.A/15/88-op'FICI AL RECORD COPY w2c comu sie no,eo, wacu o 4o