Forwards Written Confirmation from DPC Re Removal of Structure Near Left Downstream Toe of Dam at Plant Standby Svc Water Pond.Final Rept for Standby Svc Water Pond Dam Requested to Be Issued,If in Agreement W/Classification
ML20151L879
Person / Time
Site: Catawba  Duke Energy icon.png
Issue date: 08/04/1997
From: Joseph Holonich
NRC OFFICE OF NUCLEAR MATERIAL SAFETY & SAFEGUARDS (NMSS)
To: Marshall G
FEDERAL ENERGY REGULATORY COMMISSION
References
NUDOCS 9708070308
Download: ML20151L879 (1)


Text

  • Parkridge 85 North Building 3125 Presidential Parkway - Suite 300  ;

Atlanta, Georgia 30340

SUBJECT:

CATAWBA NUCLEAR STATION STANDBY SERVICE WATER POND

Dear Mr. Marshall:

Pursuant to our discussions with Mr. Jason J. Chen, P.E., of your office, we are enclosing written confirmation from Duke Power Co., of the removal of a structure near the left  !

downstream toe of the dam at the referenced site. It is our understanding that the enclosure will satisfactorily address the hazard potential, and that the dam will be considered to have

" Low" hazard potential. Your final report should confirm the " Low" hazard potential, l

if you are in agreement with the proposed classification of the structure, it is requested that i your final report for the Catawba Nuclear Station Standby Service Water Pond dam be issued at this time. As stated in our letter dated July 8,1997, we concur with the five recommendations for improving maintenance and operation of the dam and related structures j identified in your draft report.  ;

i' If you have any questions regarding these or related matters, or if additional information is required, please call Mr. Daniel Rom at (301) 415-6704.

Sincerely, (original signed by)

Joseph J. Holonich, Chief Uranium Recovery Branch Division of Waste Management Office of Nuclear Material Safety and Safeguards

,h I l Enclosure As stated DISTRIBUTION: FILE CENTER PUBLIC NMSS r/f URB r/f CNWRA ACNW CCain RIV DOCUMENT NAME: S:\DWM\ URB \DSR\ CAT FIN.LTR UR5rs , / C OFC URB NRR _ URB h\f @

NAME DRom N PTam kN DGi N J M ch DATE 7 A ( /97 9 / 4 /97 6/9/97 4 8/h/97 / /97 0FF CIAL RECORD COPY \

\

9708070308 970804 i PDR ADOCK 05000413 p PD8t NHC FILE CENTER COPY ll!Ill!Ilapil!!Wil,Oll!!Illijllllpl

. n l

j ',. .

  • Duke Power Compong
  • c AO.brEwa ampn>

' Cauwba Nu&a* Surice i era amc ,

4800 Concord P.md l YoA,$C 0 ,4) l Cuy n, paa (803) a31031 oma 1%,Pmyfmg (BW) 831-3AN MX July 17, 199'1 l

Document Control Desk U. S. Nuclear Regulatory commission Washington, D.C. 20555 l

l 1 l Sub]ect: Duke F.cergy Corporation I Catawba Nuclear Station, Unita 1 and 2 '

Docket Nos. 50-413 and 50-414 ,

Standby Service Water Pend Dam TAC Nos. M99239 & M99240  :

1

Reference:

Letter Crom Nuclear Regulatory Commissicn j MA. Judeph J. liolonich to Federal Energy l

! Regulatory Com:nission Attn: Mr. Gleny S. i Marsnail cated July 8, 1997, Catawba l Nuclear Station Standby Service Water Pend )

i The purpose of this letter is to document the removal _of I a structure "near the left downstream tce of the dam",

as manH nned i n the referenced letter.

This structure wse located juot east of the toe of the dam (tc an observer's left if standing en the middle of the dam crest and luu'Ainy duans Licam) at the time of the on site inspection of the Standby Nuclear Service Water Pond Dam which was held February 26, 1997. Since that time, the structure (which was a small cabin that predated construction of the dam and power plant) has been torn down and removed. This has been verified by actual inspection.

If you require further inforrtation, please contact l M. S. Kician, Jr. at (803)S31-3205.  !

i .-

! Very Truly Your ,

j G. P. Peterson i

l 8

cry o .,

o'

'e e

U. S. Nuclear Regulatory Comm1=sion July 17, 1997 Page 2 xc: L. A. Reyes Administrator, Region II P. S. Tam Senior Project Manager, ONRR i