ML20151L849

From kanterella
Jump to navigation Jump to search
Forwards Part 3 of Operating Rept,Consisting of Results of Environ,Radiological & Meteorological Monitoring.Part 1 Submitted Under Separate Cover in Feb & Part 2, Radioactive Effluents Submitted in Feb & Aug
ML20151L849
Person / Time
Site: Zion  File:ZionSolutions icon.png
Issue date: 02/09/1988
From: Pliml G
COMMONWEALTH EDISON CO.
To: Davis A
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
Shared Package
ML20151L829 List:
References
NUDOCS 8804220159
Download: ML20151L849 (1)


Text

.'

C:mm:nw:alth Edisen Zion Generating Station 101 Shiloh Blvd.

Z:on, Illinois 60099 Telephone 312/746 2084 February 9, 1988 Mr. Bert Davis Acting Regional Administrator Directorate of Inspection and Enforcement, Region III U. S. Nuclear Regulatory Commission 799 Roosevelt Road Glen Ellyn, IL 60137

Subject:

Zion Nuclear Power Station Operating Report, NRC Dockets 50-295 and 50-304

Dear Mr. Davis:

Enclosed is Part 3 of the Zion Station Operating Report, reporting results of Environmental Radiological and Meteoro-logical monitoring. Part 1, facility operating experience was submitted under separate cover in F.ebruary, and Part 2, radio-active effluents in February and AQgust.

Two copies of the report are provided for your use. One copy each will be forwarded to Document Control and the NRC Resident Inspector.

Sinceret ours, 4

/7 kN G. J. Pliml Station Manager Zion Station GJP/jlc Enclosure 8804220159 880209 PDR ADOCK 05000295 R DCD