Amend 107 to License DPR-72,modifying Paragraph 2.D of License to Require Compliance W/Amended Physical Security Plan
ML20151L360
Person / Time
Site: Crystal River Duke Energy icon.png
Issue date: 08/01/1988
From: Berkow H
Office of Nuclear Reactor Regulation
To:
Shared Package
ML20151L364 List:
References
NUDOCS 8808040020
Download: ML20151L360 (2)


Text

,

6 i

[

o UNITED STATES g

NUCLEAR REGULATORY COMMISSION e

o WASHINGTON, D C. 20555

,o FLORIDA POWER CORPORATION


CTTTUFAEACHUA CITTUFB05MEEE CITY OF GAINE5VIELE CITTUFRT55TMT CITY OF LEE 5BU W CITY OF NEW SMYRNA BEACH AND UTTETTTE5 CUMT5SION, CITY OF NEW SMYRNA BEACH CITY OF OCALA ORLAND0 UTILITIES CUMI55TDFAND CITY OF ORLAND0 SEBRT T UTTEITTE5 CDMT55 ION SEMINOLE ELECTRTt l DUFERATIVE, INC.

CIT N F TALLAHA55EE DOCKET N0. 50-302 CRYSTAL RIVER UNIT 3 NUCLEAR GENERATING PLANT AMENDMENT TO FACILITY OPERATING LICENSE Amendment No.107 License No. DPR-72 1.

The Nuclear Regulatory Comission (the Commission) has found that:

A.

The application for amendment by Florida Power Corporation, et al.

(the licensees) dated December 2, 1986, as supplemented December 1, 1987, January 20, 1988 and April 14, 1988, complies with the standards and requirements of the Atomic Energy Act of 1954, as amended (the Act), and the Commission's rules and regulations set forth in 10 CFR Chapter I; 8.

The facility will operate in conformity with the application, the provisions of the Act, and the rules and regulations of the Comission; C.

There is reasonable assurance (i) that the activities authorized by this amendment can be conducted without endangering the health and safety of the public, and (ii) that such activities will be conducted in compliance with the Commission's regulations; D.

The issuance of this amendment will not be inimical to the common defense and security or to the health and safety of the public; and E.

The issuance of this amendment is in accordance with 10 CFR Part 51 of the Commission's regulations and all applicable requirements have been satisfied.

8808040010 880801 PDR ADOCK 05000302 P

PDC I

b s-4,

2.

Accordingly, paragraph 2.0 of Facility Operating License No. DPR-72 is hereby amended to read as follows:

2.0 The licensee shall fully implement and maintain in effect all provisions of the Commission-approved physical security, guard training and qualification, and safeguards contingency plans including amendments made pursuant to provisions of the Miscellaneous Amendments and Search Requirements revisions to 10 CFR 73.55 (51 FR 27817 and 27822) and to the authority of 10 CFR 50.90 and 10 CFR 50.54(p).

The plans, which contain Safeguards Information protected under 10 CFR 73.21, are entitled:

"Crystal River Nuclear Power Plant, Unit 3, Podified Amended Security Plan," with revisions submitted through April 14, 1988; "Crystal River Nuclear Power Plant, Unit 3, Security Training and Quali-f1 cation Plan," with revisions submitted through July 29, 1987; and "Crystal River Nuclear Power Pient, Unit 3, Safeguards Contingency Plan," with revisions submitted through July 23, 1987.

Changes made in accordance with 10 CFR 73.55 shall be implemented in accordance with the schedule set forth therein.

3.

This license amendment is effective as of its date of issuance.

FOR THE NUCLEAR REGULATORY COMMISSION

/9

\\

H rbert N. Berk w, Director Project Directorate 11-2 Division of Reactor Projects-l/II Office of Nuclear Reactor Regulation Date of Issuance:

August 1,1988