Forwards Request for Addl Info Re Amend 12,Chapter 1 of Sys 80+ CESSAR-DC Transmitted by .Requests Info within 90 Days of Ltr Date
ML20151K961
Person / Time
Issue date: 04/13/1988
From: Vissing G
Office of Nuclear Reactor Regulation
To: Scherer A
ABB COMBUSTION ENGINEERING NUCLEAR FUEL (FORMERLY
References
PROJECT-675A NUDOCS 8804210448
Download: ML20151K961 (5)


Text

April 13, 1988 Project No. 675 Mr. A. E. Scherer, Director Nuclear Licensing Combustion Engineering 1000 Prospect Hill Road Post Office Box 500 Windsor, Connecticut 06095-0500

Dear Mr. Scherer:

SUBJECT:

REQUEST FOR ADDITIONAL INFORMATION CONCERNING CHAPTER 1. CESSAR-DC SYSTEM 80+ DESIGN, INSTRUMENTATION AND CONTROL SYSTEMS BRANCH Our Instrumentation and Control Systems Branch has reviewed the Amendment 12, Chapter 1 of the System 80+ CESSAR+DC, transmitted by your letter dated September 11, 1987 and has identified the need for additional information.

The enclosed Request for Additional Information describes the needed information. Our schedule calls for the information to be received within 90 days from the date of this letter.

Sincerely, original signed by Guy S. Vissing, Project Manager Standardizaticn and Non-Power Reactor Project Directorate Division of Reactor Projects - III, IV, Y and Special Projects Office of Nuclear Reactor Regulation

Enclosure:

As stated 8804210448 880413 cc:

See next page P

PROJ PDR DISTRIBUTION:

Central File GVissing ACRS (10)

,y NRC PDR LRubenstein OGC-Rockville jr 9 PDSNP Reading EJordan SNewberry W

dp.

EHylton JPartlow JStewart E.

n g:cw LRuben ein 04/@/88 04//p/98 04//3 /88

p ** "8%

s k

UNITED STATES r

NUCLEAR REGULATORY COMMISSION

[,

g j

WASHINGTON, D. C. 20555

(.....,/

April 13, 1988 Project No. 675 l

Mr. A. E. Scherer, Director Nuclear Licensing l

Combustion Engineering 1000 Prospect Hill Road Post Office Box 500 Windsor, Connecticut 06095-0500

Dear Mr. Scherer:

SUBJECT:

RE0 VEST FOR ADDITIONAL INFORMATION CONCERNING CHAPTER 1 CESSAR-DC SYSTEM 80+ DESIGN, INSTRUMENTATION AND CONTROL SYSTEMS BR/.NCH Our Instrumentation and Control Systems Branch has reviewed the Amendment 12, Chapter 1 of the System 80+ CESSAR-DC, transmitted by your letter dated September 11, 1987 and has identified the need for additional information.

The enclosed Request for Additional Information describes the needed information. Our schedule calls for the information to be received within 90 days from the date of this letter.

Sincerely, Guy S. Vissing, Project Manager Standardization and hon-Power Reactor Project Directorate Division of Reactor Projects - III, IV, V and Special Projects Office of Nuclear Reactor Regulation

Enclosure:

As stated cc: See next page

Combustion Engineering Inc.

Project No. 675 Advanced CESSAR cc: Mr. C. B. Brinkman, Manager Washington Nuclear Operations Combustion Engineering, Inc.

7910 Woodmont Avenue, Suite 1310 Bethesda, Maryland 20814 Dr. Michael Green Manager of Licensing Combustion Engineering 1000 Prospect Hill Road Post Office Box 500 Windsor, Connecticut 06095-0500 i

l l

f 1

1

ENCLOSURE 1 REQUEST FOR ADDITIONAL INFORMATION CONCERNING INSTRUMENTATION AND CONTROL SYSTEMS BRANCH 'dEVIEW OF CHAPTER 1 0F AMENDHENT NO. 12 COMBUSTION ENGINEERING SYSTEM 80+ DESIGN, CESSAR-DC PROJECT NO. 675 420.1)

Section 1.1.1 "System 80+ Design" The last sentence in this section states that "The service life for System 80+ will be sixty calendar years." Assuming that the NRC changes 10 CFR 50.51 to allow sixty year licensing, the applicant needs to address the use of IEEE qualification standards which are written based on a 40 year maximum plant life.

420.2)

Section 1.8 and Table 1.8-1 This section lists all current applicable Regulatory Guides which are addressed in the System 80 design and notes that changes relative to the System 80+ design will be included as subsequent chapters are revised.

Without the total list of Regulatory Guides applicable to the System 80+

design, the staff cannot complete its review of this section. The following Regulatory Guides should be added to the existing table 1.8-1 list:

1.89 (6/84)

Qualification of Class 1E Equipment for Nuclear Power Plants 1.97 (6/93)

Instrumentation for Light-Water-Cooled Nuclear Power Plants to Assess Plant Conditions During and Following an Accident 1.100 (8/77)

Seismic Qualification of Electric Equipment for f

Nuclear Power Plants 1.105 (2/86)

Instrument Setpoints 1.118 (6/78)

Periodic Testing of Electric Power and Protection Systems 1.121 (4/74)

Instrumentation for Earthquakes 1.151 (7/83)

Instrument Sensing Lines 1.152 (11/85) Criteria for Programmable Digital Computer System Software in Safety Systems of Nuclear Power Generating Stations 1.153 (12/85) Criteria for Power Instrumentation and Control Portion of Safety Systems

. In addition, several dates are missing from the list and the System 80+

should reference the latest revision of the Regulatory Guides.

The following requirements and guides were not addressed.

CE should provide clear indication whether the System 80+ has any changes from the System 80 related to these items.

Branch Technical Positions ICSB - 3, 4, 12, 13, 14, 20, 21, 22, 26 CFR 50.55 (f), 50.34 (f(2) (ix)), (f(2) (xii))

Generic Letters 81-18, 82-33, 83-29, 85-09, 85-10 NUREG - 0460, CR2147, CR3069 GDC - 13,.19, 21, 22, 23, 24, 25, 29 420.3)

Section 1.1.3.2 Is remote shutdown capability outside of the Nuclear Plant Control Center included as part of the System 80+ scope?