Responds to Violations Noted in Insp Repts 50-369/88-12 & 50-370/88-12.Corrective Actions:Station Operations Will Place Draining of Steam Supply Lines on Shift Rounds Sheets to Ensure Lines Drained Twice Daily
ML20151K870
Person / Time
Site: McGuire, Mcguire  
Issue date: 07/22/1988
From: Tucker H
DUKE POWER CO.
To:
NRC OFFICE OF ADMINISTRATION & RESOURCES MANAGEMENT (ARM)
References
NUDOCS 8808030303
Download: ML20151K870 (3)


Text

_ _ _ _ _ _ _ _ - _ - _ _ _ _ - _ - _ _ - _

i-r

,. 4 4

DUKE POWEn GOMPANY f

P.O. Box 33180 CHAMLOTTE. N.C. 28242 HAL H. TL'CKER rutzeno3rn tus receseant (704) D73-4 M1 swaram reoewmas July 23, 1988 1

1 U.S. Nuclear Regula.cory Commission

)

Document Control-De'sk Washington, D.C.

20555

Subject:

McGuite Nuclear Station Docket Nos. 50-369, -370 NRC/0IE Inspection Report Nos. 50-369,370/88-12 Reply to a Notice of Violation Gentlemen:

Pursuant to 10CFR 2.201, please find attached Duke Power Company's response to the violation 369, 370/88-12-04 that was delayed until July 22, 1988, by my letter of July 6, 1988 in which Duke responded to the other violations and deviation that were reported in the subject inspection report.

Should there be any questions concerning this matter, contact S.E.

LeRoy at (704) 373-6233.

Very truly yours, y

Hal B. Tucker SEL/294/ bhp Attachment xe:

Dr. J. Nelson Grace Regional Administrator, Region II U.S. Nuclear Regulatory Commission 101 Marietta St., NW, Suite 2900 Atlanta, CA 30323 Mr. Darl Hood U.S. Nuclear Regulatory Commission Office of Nuclear Reactor Regulation Washington, D.C.

20555 Mr. W.T. Orders NRC Resident Inspector l

McGuire Nuclear Station (j

8808030303 000722

} [)

PDR ADOCK 05000369 0

PNU

DUKE POWER COMPANY McGUIRE NUCLEAR STATION REPLY TO NOTICE OF VIOLATION INSPECTION REPORT 50-369, 370/88-12 Violation 369, 370/88-12-04 10 CFR 50, Appendix B,

Criterion XI, requires that a test program be established to assure tha t all testing required to debonstrate that systems and components will perform satisfactorily in service is identified and performed in accordance with written test procedures.

Contrary to the above, the test program established to demonstrate that the turbine driven auxiliary feedwater pumps will perform satisfactory in service was inadequate.

The procedure used to test the pumps does not perform the test in the as found condition in that the steam lines to tne pump turbine are drained of condensate prior to testing.

This is a Severity Level IV (Supplement I) violation.

Response

1.

Admisaion or denial of violation:

The violation is admitted as stated.

2.

Reason for the violation if admitted:

The first portion of the violation states that, "... the test program established to demonstrate that the turbine driven auxiliary feedwater pumps will perform satisfactory in service was inadequate".

This portion of the violation is admitted. None of the tests performed on the turbine driven auxiliary feedwater pumps in order to satisfy the requirements of the Technical Specifications of ASME Section XI demonstrate ?} 1 < the turbine will perform satisfactorily in service since the turbint iteam supply lines were drained prior to performing any tests on the turtsne.

The steam supply lines were routinely drained prior to initiation of any tests on the turbine driven auxiliary feedwater pumps.

This waJ done as a "good operating practice" in order to avoid any potential damago to the turbine from condensate which was not expected to be present in the steam supply lines.

In deed, the operating history of the auxiliary feedwater pumps has demonstrated on auto-starts following feedwater transients that the automatic condensate drain feature of the steam supply lines has provided reasonabic assurance that condensate will not accumulate and adversely affect the operation of the turbine.

The second portion of the violation which states "the procedure used to test the pumps does not perform the test in the as found condition in that the steam lines to the pump turbine are drained of condensate prior eo testing", is not correct.

The subject IWP procedurc is designed to test the pump ONLY in order to comply with ASME Section XI requirements.

The draining of the turbine steam supply lines does not impact or change the as-found condition of the CA pump.

~2-3.

Corrective steps which have been taken and results achieved:

No additional corrective steps have been taken.

4.

Corrective steps planned to avoid further violations:

Station Operations will place the draining of all steam supply lines on the shift rounds sheets.

This will ensure that lines are drained twice a day normally.

5.

Date when full compliance will be achieved:

October 1, 1988