ML20151K596

From kanterella
Jump to navigation Jump to search
Confirms 880728 Enforcement Conference at Site to Discuss Concerns Re Apparent Failure to Comply W/Tech Spec 3.5.1.2 Action Requirements for Upper Head Injection Sys,Per 880719 Telcon
ML20151K596
Person / Time
Site: Sequoyah  Tennessee Valley Authority icon.png
Issue date: 07/20/1988
From: Mccoy F
NRC OFFICE OF SPECIAL PROJECTS
To: White S
TENNESSEE VALLEY AUTHORITY
References
NUDOCS 8808030220
Download: ML20151K596 (2)


Text

..

  • w .a - . ..

^

d JUL 2 01998 Docket Nos. 50-327, 50-328 License Nos. OPR-77, DPR-79

.Tgnnessee Valley Authority LATTN: Mr. S. - A. Whi te Senior Vice President, Nuclear Power 6N 38A Lookout Place 1101 Market Street Chattanooga, TN 37402-2801 Gentlemen:

SUBJECT:

CONFIRMATION OF MEETING - SEQUOYAH DOCKET NOS. 50-327 AND 50-328 This confirms the telephone conversations between Mr. J. Bynum, Vice President, Nuclear Power Production, TVA, and Mr. F. McCoy, Assistant Director for TVA Inspection Programs, Office of Special Projects, NRC, on July 19, 1988, concerning an enforcement conference to be conducted at Sequoyah Nuclear Power Plant, Saddy Daisy, TN, . on July 28, 1988, at 9:00 a.m. The purpose of this m,eeti g .is to discuss concerns related to the apparent failure to comply with lech'.ical Specification 3.5.1.2 action requirements for the upper head injection system. These concerns specifically deal with the faiidre to follow surveillance instruction (SI) 744 on July 9, 1988, in order to demonstrate upper head injection accumulator isolation valve 2-FCV-87-21 operability immediately af ter the 4th hydraulic charge of the valve's accumulator. We request that, if possible, your shift operating supervisors that were on shift during the actual accumulator charging evolutions, from the time of the fourth accumulator charge at 1:30 p.m., on July 9,1988, until the time of the pre-charge on July 10, 1988, attend the enforcen ant conference.

Should you have any questions regarding these arrangements, we will be pleased to discuss them.

Sincerely, ORIGINAL, $1CNED BY FRANK R. McCOY Frank R. McCoy, Assistant Director for TVA Inspection Programs TVA Projects Division Office of Special projects cc: (See page 2) 8908030220 880720 PDR ADOCK 05000327 x Q PNV

\0

[ ___

, JUL 2 91988 Tennessee Valley Authority 2 cc: g. L. Abercrombie, Site Director Sequoyah Nuclear Plant

/ A. Kirkebo, Vice President, Nuclear Engineering

  1. . L. Gridley, Director Nuclear Safety and Licensing
f. R. Harding, Site Licensing Manager y A Representative, Rockville Office bcc: f. G. Partlow, OSP MD. Richardson,OSP Or. Black, OSP

@. D. Liaw, OSP

'K. P. Barr, OSP/RII J. B. Brady, OSP/RII

  1. . Rutberg, OGC t)(RC Resident Inspector DRS, Technical Assistant NRC Document Control Desk State of Tennessee OSP/RII 05,P/RII B \'

,dBrady KBir)r 7/ /j/88 -7/(q/88