Confirms 880815 Enforcement Conference in Region IV Ofc to Discuss Apparent Violations Re Equipment Qualification as Noted in Insp Repts 50-313/88-09 & 50-368/88-09,per 880722 Telcon.Revised Proposed Meeting Agenda Encl
ML20151K526
Person / Time
Site: Arkansas Nuclear  Entergy icon.png
Issue date: 07/27/1988
From: Callan L
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
To: Campbell G
ARKANSAS POWER & LIGHT CO.
References
NUDOCS 8808030206
Download: ML20151K526 (5)


See also: IR 05000313/1988009

Text

.

.

-

. - *f:'

,

JA.27 m

In Reply Refer To:

Dockets: 50-313/88-09

50-368/88-09

Arkansas Power & Light Company

ATTN: Mr. Gene Campbell

Vice President, Nuclear

Operations

P.O. Box 551

Little Rock, Arkansas 72203

Gentlemen:

M

This is to confirm arrangements made with Mr. Dan Howard of your staff during

telephone conversations with Region IV staff on July 22, 1988, for an

Enforcement Conference in the Region IV office on August 15, 1988, at

10:30 a.m.

The purpose of the Enforcement Conference is to discuss apparent violations

and other matters regarding equipment qualification as documented in our

letter to you regarding this matter dated July 14, 1988. A revised proposed

meeting agenda is enclosed.

Should you have any questions concerning these arrangements, we will be

pleased to discuss them with you.

Sincerely,

Original Signed by Beach

for:

L. J. Callan, Director

Divisim, of Reactor Projects

Enclosures:

Proposed Agenda

cc:

Arkansas Nuclear One

ATTN:

J. M. Levine, Director

Site Nuclear Operations

P.G. Box 608

Russellville, Arkansas 72801

Arkansas Radiation Control Program Director

0

D:DFf)lan

C:PSA

DDChamberlain;df

LJCa'l

i

1 /2'l/88

1 /27/88

'

,

seoso30206 880727

i\\

PDR

ADOCK 05000313

g

PDC

.

-

--

- -

_ -

-

-.

.

. .

. - .

_.

. . .

,

-

.c

Arkansas Power & Light Company

-2-

bec w/ enclosures:

DMB IE45

i

RRI

R. D. Martin, RA

,

RPB-DRSS

Section Chief (DRP/A)

i

Lisa Shea, RM/ALF

RIV File

DRP

MIS System

RSTS Operator

Project Engineer, DPP/A

G. Dick, NRR Project Manager

DRS

G. F. Sanborn, E0

_

_

_

__

_ _ _

. ;-

a-

,

,

PROPOSED AGENDA

ARKANSAS POWER & LIGHT COMPANY (AP&L)

ENFORCEMENT CONFERENCE WITH NRC

I.

INTRODUCTION AND PURPOSE OF MEETING

A. B. Beach, Deputy Director

Division of Reactor Projects

II.

ENVIRONMENTAL QUALIFICATION OF ELECTRICAL

J. L. Milhoan, Director

EQUIPMENT (July 14-18, 1986, NRC

Division of Reactor. Safety

NRC Inspection)

LICENSEE COMMENTS

AP&L Representative

DISCUSSION

1.

Limitorque Motor Operators (Inside

and Outside Containment)

1.1 Unidentified Splices (found by AP&L)

1.2 Unidentified, Corroded, and

Underrated Terminal Blocks

(found by AP&L)

1.3 Missing T-drains

1.4 Mixing of Greases, Hardenino

and Contamination

1.5 Shipping Caps on Grease Relief.

Valves

1.6 Unidentified Mctor Lead Crimp

'

Type Connectors (Thomas Betts,

Hollingsworth,orBurndy)

1.7 Limit Switch Compartment Space

Heaters - Qualified Life on

Components

1.7.1 Life of Components

1.7.2 Burnt Insulation with

Wires in Contact

2.

Rockbestos Coaxial Cable to the

GA RD23 High Range Radiation Monitor

2.1 Similarity Evaluation

Clarifying the Differences of

"LD" and "LE" Generation Cable

i

,

-

,

-

--

. . . - . .

, ,, - - .-- -.--.-.

,,_ ,_._.,,,. _

._

.a

.

.

.

_,

i

-2-

3.

Cable Instrument Accuracy

Evaluations Considering Combined

Errors of Transmitters, Terminal

Blocks, Penetrations, etc.

4.

Amphenol/ Bunker Ramo Electrical

Penetration Assemblies

Model 50009752-07-Instrument Circuits

4.1

Insulation Resistance Test Data

5.

Eaton Cable, GEN 1002

'

5.1 Bases-for 40-Year Qualification

5.2 Clarification of Jacket

Material

6.

Boston Insulated Wire (BIW), Cable,.

GEN 1002

'

6.1 Qualification for the Required

110 Hours Fost-LOCA

7.

Roter; Motor Operator,11NA1

7.1 Test Report TR116, Test

Anomalies

III. ENVIRONMENTAL QUALIFICATION OF LIMITORQUE

MOTOR OPERATORS (JULY 31, 1986, LETTER

WITH ENCLOSURE)

LICENSEE COMMENTS

DISCUSSION

1.

Approximately 75 Limitorque Motor

Operators were specifically addressed

in the Justification for Interim

Operation submitted to the NRC on

July 31, 1986.

1.1

Identify all affected motor operators

1.2 Identify as-found conditions from the 1986 Unit I refueling

outage inspections

1

_

t .

,

,

3-

-

IV. ENVIRONMENTAL QUALIFICATION OF ELECTRICAL

J. L. Milhoan, Director

EQUIPMENT (SubsequentNRCInspections).

Division of Reactor Safety

LICENSEE COMMENTS

- AP&L Representative

DISCUSSION

1.

Limitorque Motor Operators

1.1 Okonite T95/35 Tape Splices on

Braided Fiberglass Jacketed

Field Cable

1.2 Thermal Aging of Components Due

,

to Switch Compartment Space

Heaters

1.2.1 Heater Qualification

1.2.2 Power Source

Reliance Containment Coolin

Motors (Fans by Joy Mfgr.) g Fan

2.

2.1 Gulf High Temperature Grease

Qualification

2.2 Double Sealed / Shielded Bearing

Qualification (Testedvs. Installed)

i

2.3 Bearing Replacement Procedures

to Maintain Qualified Status

2.4 Electrical Insulation System

.,

Modifications (Glyptol 1201)

l

3.

Rosemount Transmitters

3.1 Loss of EQ Seal Integrity

'

3.2 Internal Orientation Requirements

IV. LICENSEE CLOSING COMMENTS

AP&L Representative

V.

NRC CLOSING COMMENTS

A. B. Beach /J. L. Milhoan

i

i

-we

?

--

-c'

m-

ryy+-+x+em

--w

-ww-

-w

w

,w,-y-

yy----

p y M

-

ggyy

-yy-

w---w-y

ey-

r

-e-

,--

-y

e'---

--e

e

r-v

e