Docket No.: STN 50-483 JUN 151984 Mr. D. F. Schnell Vice President - Nuclear Union Electric Company P. O. Box 149 St. Louis, Missouri 63166
Dear Mr. Schnell:
Subject:
Additional Information Needed to Resolve Five-Percent License Conditions In the Callaway License, there are several conditions which must be met prior to operation above five-percent of rated power. The specific issues along with the current status are detailed in the enclosure. Because these issues require a detailed staff review and in order to support the projected full-power amendment date of August 15, 1984, you should provide the needed infor-mation no later than June 29, 1984. All of these issues have been previously discussed with members of your staff.
If you require any additional information or clarification, please contact the Callaway Project Manager.
Sincerely, Osu Gara; st a 2p g n B. J. Youngblood, Chief Licensing Branch No. 1 Division of Licensing
Enclosure:
As stated cc: See next page DISTRIBUTION:
Docket > File - ~- JHolonich NRC PDR P0'Connor L PDR OELD NSIC ACRS (16)
PRC System EJordan LB#1 R/F NGrace MRushbrook LBN)
LB#
LBf1:DL JH n ch:kab P0'Connor BJY4 Laood 06/g /84 06/;5 /84 06/
/84 8406270397 840615 PDR ADOCK 05000483 E
PDR i
I
pc j?).
- o, UNITED STATES l
{,*-(av(,j NUCLEAR REGULATORY COMMISSION
~
W f9 E WASHINGTON, D. C. 20555
'g*.L/]
JUN 151984 Docket No.: STN 50-483 Mr. D. F. Schnell Vice President - Nuclear Union Electric Company P. O. Box 149 St. Louis, Missouri 63166
Dear Mr. Schnell:
Subject:
Additional Infonnation Needed to Resolve Five-Percent License Conditions In the Callaway License, there are several conditions which must be met prior to operation above five-percent of rated power. The specific issues along with the current status are detailed in the enclosure.
Because these issues require a detailed staff review and in order to support the projected full-power amendment date of August 15, 1984, you should provide the needed infor-
. mation no later than June 29,1984 All of these issues have beert, previously discussed with members of your staff.
If you require any additional information or clarification, please contact the Callaway Project Manager.
Sincerely, V
B. J.; Youngbloo, Chief Licerfsing Bran No. 1 Divisich of Licensing
Enclosure:
As stated cc: See next page
.. ~.
~
JUN 151984 CALLAWAY Mr. D. F. Schnell Vice President - Nuclear Union Electric Company Post Office Box 149 St. Louis, Missouri 63166 cc:
Mr. Nicholas A. Petrick Mayor Howard Steffen Executive Director - SNUPPS Chamois, Missouri 65024 5 Choke Cherry Road Rockville, Maryland 20850 Mr. Fred Luekey Presiding Judge, Montgomery County Gerald Charnoff, Esq.
Rural Route Thomas A. Baxter, Esq.
Rhineland, Missouri 65069 Shaw, Pittman, Potts & Trowbridge 1800 M Street, N. W.
Professor William H. Miller Wa~shington, D. C.
20036 Missouri Kansas Section, American Nuclear Society Mr. J. E. Birk Department of Nuclear Engineering Assistant to the General Counsel 1026 Engineering Building Union Electric Company University of Missouri Post Office Box 149 Columbia, rissouri 65211 St. Louis, Missouri 63166 Mr. Robert G. Wri-5t Mr. John Neisler Assoc. Judge, Eastern District U. S. Nuclear Regulatory Commission County Court, Callaway County, Resident Inspectors Office Missouri RR#1 Route #1 Steedman, Missouri 65077 Fulton, Missouri 65251 Mr. Donald W. Capone, Manager Lewis C. Green, Esq.
Nuclear Engineering Green, Hennings & Henry Union Electric Company Attorney for Joint Intervenors Post Office Box 149 314 N. Broadway, Suite 1830 St. Louis, Missouri 63166 St. Louis, Missouri 63102 A. Scott Cauger, Esq.
Mr. Earl Brown Assistant General Counsel for the School District Superintendent Missouri Public Service Comm.
Post Office Box 9 Post Office Box 360 Kingdom City, Missouri 65262 Jefferson City, Missouri 65101 Mr. Samuel J. Birk Mr. Donald Bollinger, Member R. R. #1, Box 243 Missourians for Safe Energy Morrison, Missouri 65061 6267 Delmar Boulevard University City, Missouri 63130 Mr. Harold Lottman Presiding Judge, Dasconade County Ms. Marjorie Reilly Route 1 Energy Chairman of the League of-Owensville, Missouri 65066 Women Voters of Univ. City, MO 7065 Pershing Avenue Eric A. Eisen, Esq.
University City, Missouri 63130 Birch, Horton, Bittner and Moore Suite 1100 1140 Connecticut Avenue, N. W.
Washington, D. C.
10036 J
' ~ ~
JUN 151984 CALLAWAY 2-4 cc:
(cont'd):
Mr. John G. Reed Route #1 Kir.gdom City, Missouri 65262 I
Mr. Dan I. Bolef, President Kay Drey, Representative Board of Directors Coalition for the Environment St. Louis Region 6267 Delmar Boulevard j
University City, Missouri 63130 1
Mr. James G. Keppler 4
U. S. Nuclear Regulatory Commission Region III 799 Roosevelt Road Glen Ellyn, Illinois 60137
~
.s
)
I i
i I
e i
,g, a
w.*
,-e%
e
- - *
- ee m se
- 8*'-
- ,e
- * *499 t e o
s ENCLOSURE SER Section Issue or Reference Status Qualification of seal water 3.11 Awaiting Information infection filter l
Seismic and Dynamic Qualification 3.10.1 Awaiting Information Pump and Valve Operability 3.10.2 Awaiting Information Detailed Control Room Design Review (a) Environmental' Survey I.D.1 Awaiting Information (b) Supplemental DCRDR Report I.D.1 for all issues, (a),
(c) Auxiliary Shutdown Panel I.D.1/ June 11, (b), and (c)
Concerns 1984 NRC letter Post Accident Sampling System (a) System Operable II.B.3 Awaiting Information (b) Core Damage Procedure II.B.3 ICC Isolation Devices II.F.2 Awaiting Information Shift Advisors ULNRC-838 (a) Revised Procedure Awaiting Information (b) Addition Advisors-Resume's PSI Exemption Requestion SLNRC Under staff review 84-093 i
Fire Protection Items in ULNRC Awaiting Completion May 7, 1984 letter 814 Expand Charter of SOAP ULNRC-838 Awaiting Information Environmental Errors for SLNRC Awaiting Information Redundant Trips84-084 i