ML20151K213
| ML20151K213 | |
| Person / Time | |
|---|---|
| Site: | Arkansas Nuclear |
| Issue date: | 04/14/1988 |
| From: | ARKANSAS POWER & LIGHT CO. |
| To: | |
| Shared Package | |
| ML20151K210 | List: |
| References | |
| NUDOCS 8804210273 | |
| Download: ML20151K213 (2) | |
Text
.
4 ARKANSAS POWER & LIGHT COMPANY ARKANSAS NUCLEAR ONE E X E Cuf fV E DietECTOR. ANO Stit OPER ATIONS NUCLEAR CUAtfTY OEMERAL MANAGER ~~~--~~7 I
i
__________________________q l
l
[ _ _ _ _t_r)
I y
I Q.C. t 02.
- 0. A.
III St.FSReertteENT SUPERINTENDENT g
t
~
l i
I I
INI""O ERAL WANAGER l
LNI"I"O PLANT WANAGER A
LONGTER P(ANT SUPPORT WANAGER esANAGER pgg gg gg g g
(3) l l
l l
l l
I b
l OPE RAtl0NS WORK CONTROL MAINTENANCE PLANT S
[c, 1,0sst WANAGER CENTER WANAGER MANA0p uA R
l 1
1 I
I I
Utelt 1 OPERATC868 UNIT 2 OptRATONS MEALTN PHYS 8CS
,,.)
[
SUPEfMNTE 800E NT SUPE RTNTE NDE NT SUPERINTENDENT u
a l
l l
OPERAftoset OPE R ATIONS TECMeseCAL TE CHNIC AL
~
~
ADWus4TRAffYS SUPPORT SUPPORY WANAGER SUPERVISOR SUPERYtSOR l
l
-SNLFT SUPE RYlSOR BMIP T Supt RY140R TRAmesNO WAN AGER (A)
L_
l SM4F T SMIF T O P E R A TION S
&OYINISTR ATIVE ADWINIS T R A flV E ASSESSMENT A S SIS T ANT S A S $lS T ANT S S UPE mite T E N D E N T
=TLART OPERATOR PtANT OPERATOR WM SE CURff Y E SENs0R OPER ATOR LICENSE REQUNttD E N OPER ATOR LICENBt REQUIRED
~AS$lST ART PL ANT ASSIST ANT PL ANT
~
CPIRATOR OPERATOR RR NN (1) THE Mt! ALTM PHYSIC $ SUPERINTIN0 TNT REPORTS TO TMt TECHNIC AL SUPPORT WANAGER IN ADWfhlSTR ATIVE WATTERS ANC R-)UTikt ME ALTM PMYSICS CONCERNS ANO ME REPORTS TO THE E XE CUTIVE DIRECTOR. ANO SITE OPER A fl0N S IN W AYTERS 07 R AD10 LOG 8C AL ME ALTM S AFETY AND POLICY.
(t) TME N JCLE AR OVALITY GENER AL MAN ASER REPORTS TO TME vlCE PRESIDENT OF NUCLE AR OPERAtl0NS. MS MAS WASTE WASTE BITERf' ACE WITM TMt E XECUf fVE DutECTOR, ANO SITE OPER ATIONS tes O AILY COMWVN8C Atl0NS. AND M AS DetCT ACCESS 70 THE SENOR YtCE PRESIDENT GEleER ATON. TRAN64ft4SCM & fe800eEERfe9 081 ANY WATTERS C088 TROL CONTROL CPERATOR OPtRATOR CoseCE Seesee IRp11AR CUALITY.
(3) THE ENS 90EtRD60 W ANAGER MAS RESP 00stettTY FOR THE FIRE PRottCT1086 PRoeR AW. CORPOR ATE OYtRSsSMT Post TMS PROGRAW IS PROYDED SY THE ORJCLEAR OVER$aGMT / SUPPORT EEP ARTWElff.
(A) THE TR &Betse WANAGEP MAS RESPCsetetfTY FOR TME thsERGElpCY PREPAREDNESS Pel00A AW. CORPOR ATE OVERScMT FOR TMS PROGRAW IS PROYDEO SY TNG NUCL&AR OVERS 9eff / SUPPORT DS*ARThsENT.
AU t tL 6A R Y A bitLI A R Y OPERATOR OPtRATOR 3804210273 880414 PDR ADOCK 05000313 P
DCD FIGURE 6.2-2 FUNCTION AL ORGANIZATION FOR PLANT OPERATIONS ARKANSAS - UNIT 1 120 Amendment No. 37, //, Ef, M, 99
..~~
s d.
metal 7urgy e.
instrumentation and control f.
radiological safety g.
mechanical and electrical engineering h.
quality assurance practices COMPOSITION 6.5.2.2 The Safety Review Committee shall be composed of a Chairman and eight to twelve members which collectively have the experience ~and competence required by ANSI /ANS-3.1-1981 to review problems in the areas specified'in Section 6.5.2.1, a-h.
The Vice President of Nuclear Operations shall designate, in writing, the Chairman and all SRC members.
The Chairman shall designate, in writing, the alternate Chairman in the absence of the SRC Chairman
-ALTERNATES.
6.5.2.3 All alternate members shall be appointed in writing by the SRC I,
Chairman to serve on a temporary basis; however, no more than tG.a alternates shall participate as voting members in SRC activities at any one time.
CONSULTANTS 6.5.2.4 Consultants shall be utilized as determined by the SRC Chairman to provide expert advice to the SRC.
MEETING FREQUENCY 6.5.2.5 The SRC shall meet at least once per calendar quarter during the initial year of facility operation following fuel loading and at least once per six months thereafter.
I QUORUM 6.5.2.6 The minimum quorum of the SRC necessary for the performance of the SRC review and audit functions of these technical specifications shall consist of the Chairman or his designated alternate and at least a majority of the SRC members including alternates.
No more than a minority of the quorum shall have line responsibility for operation of the unit.
Amendment No. 16, 34, 37, 47, 58, 82, 123 99 i
__