ML20151J656
| ML20151J656 | |
| Person / Time | |
|---|---|
| Site: | Comanche Peak |
| Issue date: | 07/31/1997 |
| From: | John Marshall TEXAS UTILITIES ELECTRIC CO. (TU ELECTRIC) |
| To: | NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM) |
| References | |
| TXX-97169, NUDOCS 9708050216 | |
| Download: ML20151J656 (4) | |
Text
__
Log # TXX 97169 F7 File # 10011.1 Refs # 10CFR26.71(d) 2 TUELECTRIC' July 31, 1997 Group %ce President 4
U. S. Nuclear Regulatory Commission Attn: Document Control Desk Washington, DC 20555
SUBJECT:
COMANCHE PEAK STEAM ELECTRIC STATION (CPSES)
DOCKET NOS. 50 445 AND 50 446 TRANSMITTAL OF FIRST-HALF 1997 FITNESS-FOR DUTY PROGRAM PERFORMANCE DATA Gentlemen:
Attached are CPSES Fitness For Duty Program Performance Data for the six month period of January 1, 1997 through June 30, 1997.
The data required by 10CFR26.71(d) are provided on standard forms with the exception of the summary of management actions and list of events reported, which are provided on a separate page titled " Summary of Management Action."
If there are any questions, please contact Mr. James Brown at (817) 897 8912.
Sincerely.
C. L. Terry By:
J. S. Marshall Generic Licensing Manager 050043 achment j
c-Mr. J. E. Dyer, Region IV Mr. J. I. Tapia, Region IV Hr. T. J. Polich, NRR Resident Inspectors, CPSES
'700050216 970731 9
ll l
l!lll
^
P. O. Box 1002 Gen Rose Texas 76043
J l
TU ELECTRIC COMANCHE PEAK STEAM ELECTRIC STATION i
]
SUMMARY
OF MANAGEMENT ACTION a
Six months ending June 30,1997 i
Activities associated with the Fitness for Duty Program were performed without significant incidents.
No events were reported by telephone under 10CFR26.73.
i 3
i
Fitness for Duty Program Performance Data Personnel Subject to 10CFR 26 I
TU Electric June 30, 1997
- conow, e u,,me Enems Comanche Peak Steam Electric Station P.O. Box 1002 Glen Rose, Texas 76043 Lomeon James E. Brown Fitness for Duty Coordinator (254) 897-8912 Contan Nr*
P?mne M: hee was M Cutoff s: ScreerVConfirmation (ng/ml)
M Appendix A to 10CFR 26 Marijuana 50 ng/ml 15 ng/mlAmphetamines
/
/
Cocaine
/
Phencyclidine
/
/
Opiates
/
Alcohol (% BAC)
/
Long-Term Short-Term Testing Results Ucensee Employees Contractor Personnel Contractor Personnel Average Numt,er with Unesconed Access 1205 l
Categories Tested Positive Tested Positive Tested Positive Pre-Access 15 0
106 1
k Post accident n
n o
$g Observed behavior 2
0 0
Random 373 1
132 0
Foiiow up 22 0
0
(
Otheir 0
Total 412 1
238 1
REv.1/92
Bre-kdown of Confirmed Pccidve Tests for Specific Substances Ampho-Phency-Flefusal Marijuana Cocaine Opiates famines clidine Alcohol to Test 1
2 3
4 5
Licensee Ernpioyees 1
0 0
0 0
0 0
Long-Term Contractors Short-Term Contractors 1
A Total i
2 0
0 0
0 0
0 i
-t b
e m
.