Forwards Rev 10 of Facility Pump & Valve Inservice Testing Program.Relief Requests P03 & P09 Resubmitted in Revised Form for NRC Staff Review & Approval.Nrc Staff Approval of Submittal Requested by 880601.Fee Paid
ML20151J214
Person / Time
Site: Callaway Ameren icon.png
Issue date: 04/12/1988
From: Schnell D
UNION ELECTRIC CO.
To:
NRC OFFICE OF ADMINISTRATION & RESOURCES MANAGEMENT (ARM)
Shared Package
ML20151J221 List:
References
ULNRC-1756, NUDOCS 8804210071
Download: ML20151J214 (5)


Text

_

l# NNIDN Etscraic a

1901 Gratbt Street. St. Louis Donald F. Schnell April 12, 1988 U.S. Nuclear Regulatory Commission Attnt Document Control Desk Washington, D.C.

20555 Gentlemen:

ULNRC-17 56 UOCKET NUMBER 50-483 CALLAWAY PLANT CALLAWAY PUMP AND VALVE INSERVICE TESTING PROGRAM Referenco:

1)

ULNRC-1484. dated Apr il 14, 1987 2)

T. W. Alexion letter to D.

F.

Schnell dated Auguct 19, 1987 Reference 1 transmitted Revision 8 of the Callaway Pump and Valve Inservice Testing (IST) Program.

Reference 2 found the Callaway IST Program acceptable with the exception of relief requests P03 and P09, which were granted interim relief until June 1, 1988, and relief request V02 which was partially granted.

Attached is a further apaate to the Callaway IST Program. is a brief description of the changes, and contains a copy of revised pages which should be inserted into the existing program.

Included in this update are relief requests P03 and PO4 which are being resubmitted in a revised form for NRC stafi "eview and approval.

NRC staff approval of this submittal is requested by June 1, 1988.

Changes to the Callaway IST Program are subject to the fee provisions of 10 CFR 170.

Therefore, Union Electric is remitting the required $150.00 application fee and wil). accept additional charges incurred as a result of the NRC review.

If you have anf questions concerning this submittal, please contact me.

Very t aly yours, l

Donald F.

Schnell 4

WEK/ mat

'g3 Attachments

' ))\\

8804210071 880412 PDR ADOCK 05000483 I

J P

DCD M&Mg Address: P.O. Box 149. St Louis, MO 63166 l

1

Y[. e a.

e6.

e STATE OF MISSOURI )

' ).

'SS CITY OF ST. LOUI S.- )

Donald F.

Schnell, of lawful age,.being first duly sworn upon oath says that-he.is Vice President-Nuclear and an officer of-Union Electric Company; that he hcs read the foregoing document and knows 'the content thereof;' that he has executed the same for and on behalf of said company with full ~ power and. authority'to do so; and that the facts therein stated are ' true and correct to the best of his knowledge, information and belief.

By Donald F.

Schnell Vice President Nuclear SUBSCRIBED and sworn to before me this /O day of [

,198[

i j

BARBARA J. FFAFF(/

47 l

NOTARY PL'OlfC, STATE Of MISSOURI n'Y COV21SS10N EXPIRES APRIL 22, 1933 ST. LOUIS COUNTY i

4 y

.., ~., - -,

n.-,-

--. - - - -,, - - - -,,,..,,, -,, - - -, -, ~,,,,, -,,

~

~

.. '. ' f. >

i l-cc:

Gerald Charnoff, Esq.

Shaw, Pittman, Potts & Trowbridge 2300 N.

Street, N.W.

Washington, D.C.

20037 Dr. J.

O.

Cermak CFA, Inc.

4 Professional Drive (Suite 110)

Gaithersburg, MD 20879 R. C. Knop Chief, R2 actor Project Branch 1 U.S. Nuclear Regulatory Commission Region III 799 Roosevelt Road Glen Ellyn, Illinois 60137 Bruce Little Callaway Resident Of fice U.S. Nuclear Regulatory Commission RRil Steedman, Missouri 65077 Tom Alexion (2)

Office of Nuclear Reactor Regulation U.S. Nuclear Regulatory Commission Mail Stop 316 7920 Norfolk Avenue Bethesda, MD 20014 l

Manager, Electric Department Missouri Public Service Commission P.O. Box 360 i

Jefferson City, MO 65102 U.S. Nuclear Regulatory Commission ATTN:

Document Control Desk Washington, D.C.

20555

]

.G V:

g g J'.*j. i.

,f AttachmentL1 Page 1 of 2

. CHANGES TO CALLAWAY NUCLEAR PLANT INSERVICE TESTING PROGRAM Item 1:

Change:. 1 Revise Relief. Request P03:to add.flowtate testing to the Centrifugal Charging Pumps'en a Reactor Refueling frequency.

Basis for Change:.Per the NRR Safety Evaluation for the Callaway 4

IST Program, dated. August 19, 1987, Relief Request P03 was only granted interim relief until June 1, 1988.

See Relief Request for.

-justification of new revision.

. Item 2:

Change: Revise Relief Request.P09 to add flowrate testing to the Boric Acid Transfer Pumps on a Cold Shutdown frequency.

Basis for Change: Per the NRR Safety Evaluation for the Callaway IST Progtam, dated August 19, 1987 Relief

~ Request P09 was only granted interic relief until l

June 1, 1988.

Ses Relief Request for justification of new revision.

Etem 3:

Change:

Add Relief Request V06 to obttin relief from the requiremente of ASME Section XI IWV-3417(a) for power operated valves with a 2 secogid maximum allowable stroke time.

l Basis for Change: The corrective action requirement of IWV-3417(a) is ineffective in determining degradation ca valves that stroke rapidly.

See kelief Request V06.

Item 4:

Change: Decrease the maximum allowable stroke time from 15 seccnda to 10 seconds for EM-HV-8801A, B and EM-HV-8803A B.

[

Basis for Change: Re-evaluation of the valve functional requirements indicates that these valves need to stroke in 10 seconds rather than 15 seconds to i

meet design bases.

+

Item 5:

. Change: Add stroke time testing in the closed direction on a quarterly frequency for EM-HV-8871 and EM-HV-8964. Also add quarterly fail-safe testing and position indicatlon testing on a Reactor Refueling frequency.

Basi; for Changer The status of these valves has changed from passive to active due to change in plant normal 7

i operational valve line-up, i

t h

.,,--,_..,-.m---_-.,_,.-__,.-

e--+

s -

Page 2 of 2 Item 6:

Change:

Increase the maximum allowable stroke time from 10 seconds to 20 seconds for AL-HV-5, 7, 9, 11.

Basis for Change: Valve maximum allowable stroke time was listed incorrectly.

Valve technical data shows a 20-second design maximum stroke time and is realistic as compared to actual stroke times.

Item 7:

Change:

Increase the maximum allowable stroke time from 3 seconds to 5 seconds for valves GT-HZ-4, 5, 11, 12 Basis for Change:

Technical Specification Amendment 33 increased the maximum allowable stroke time from 3 seconds to 5 seconds for these valves.

--