ML20151H725
| ML20151H725 | |
| Person / Time | |
|---|---|
| Site: | Comanche Peak |
| Issue date: | 04/15/1988 |
| From: | Counsil W TEXAS UTILITIES ELECTRIC CO. (TU ELECTRIC) |
| To: | NRC OFFICE OF ADMINISTRATION & RESOURCES MANAGEMENT (ARM) |
| References | |
| TXX-88394, NUDOCS 8804200489 | |
| Download: ML20151H725 (1) | |
Text
,
==
F7 Log # TXX-88394
~.
."~
Fi1e # 10130 Z
Z IR 86-22 Ref f OC 2 01 U,**,'",tff,'"j,,,,
Apri1 15, 1988 U. S. Nuclear Regulatory Commission Attn: Document Control Desk Washington, D. C.
20555
SUBJECT:
COMANCHE PEAK STEAM ELECTRIC STATION (CPSES)
DOCKET N05. 50-445 AND 50-446 INSPECTION REPORT 50-445/86-22 AND 50-446/86-20 REVISED DATE OF FULL COMPLIANCE FOR NOTICE OF VIOLATION ITEM A (445/8622-V-02; 446/8620-V-03)
REFERENCE:
(1) TV Electric letter TXX-88219 from W. G. Counsil to HRC dated February 15, 1988.
Gentlemen:
Reference (1) provided a revised date of full compliance to NOV Item A (445/8622-V-02; 446/8620-V-03).
In that letter we stated that nonconformance documents would be dispositioned and closed by April 15, 1988.
The additional information needed from the valve supplier (Crosby) to disposition the nonconformance documents was only recently received.
Consequently, the disposition and closure of the nonconformance documents is now expected to be complete by July 15, 1988.
Additionally, Reference (1) stated that a response delineating any required additional action that may result from ISAP VII a.9 would be provided.
The ISAP VII.a.9 Results Report, Section 5.0 "... Discussion of Results" regarding manufacturing processes, indicates that additional corrective action is not required with respect to NOV Item A (445/8622-V-02; 446/8620-V-03).
Very truly yours, ll:X W. G. Counsil ROD /gj c - Mr. R. D. Martin, Region IV Resident Inspectors, CPSES (3) l
\\D r804200489 880415 ADOCK0500y5 soo soris otiva sserer Last oattas. trias mot DR
-