ML20151H716
| ML20151H716 | |
| Person / Time | |
|---|---|
| Site: | Millstone |
| Issue date: | 07/15/1988 |
| From: | Russell W NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I) |
| To: | Opeka J NORTHEAST NUCLEAR ENERGY CO. |
| Shared Package | |
| ML20151H718 | List: |
| References | |
| NUDOCS 8808020014 | |
| Download: ML20151H716 (2) | |
See also: IR 05000245/1986099
Text
. _ _ _ _ _ _
'
.
_
.
JUL 15 W
Docket Nos. 50-245; 50-336
Northeast Nuclear Energy Company
ATTN:
Mr. J. F. Opeka
Senior Vice President - Nuclear
Engineering and Operations Group
P. O. Box 270
Hartford, Connecticut 06141-0270
Gentlemen:
Subject: Systematic Assessment of Licensee Performance (SALP) Report 50-245/86-99;
50-336/S6-99
This letter forwards the amended Millstone 1 and 2 SALP Report (Enclosure 1) for
the period from June 1, 1986 through December 31, 1987.
The amended report is
based on NRC evalution (Enclosure 2) of your May 27, 1988 coments (Enclosure 3)
on the initial SALP Report forwarded to you by my March 29, 1938 letter (Enclosure
4).
The SALP was discussed with you on April 28, 1988 at the Millstone Training Facility
in Waterford, Connecticut.
(Meeting attendees are listed in Enclosure 5.) We be-
lieve that the discussion ireproved mutual understanding of your activities and of
our SALP program.
Evaluation of your SALP comments resulted in amending the Unit 2 Plant Operations
rating from Category 2 to Category 1 for the reasons stated in Enclosure 2.
Other-
wise, the SALP ratings did not change.
Our overall assessment is that Millstone 1 and 2 were operated safely and conserva-
tively during the SALP peried.
We appreciate the thorough review you gave the SALP report.
No reply to this letter is required.
Thank you for your cooperation.
Sincerely,
0%INAL SIGNED Bn
kS M. ALLAN
,q c William T. Russell
Regional Administrator
Enclosures:
1.
Amended NRC SALP Report, Millstone Units 1 and 2 (6/1/86 - 12/31/87)
2.
Comments Evaluatiuns and SALP Errata
3.
Northeast Utilitics Letter A07137 dated May 27, 1938
,
4.
NRC Region ! March 29, 1988 Letter, W. Russell to J. Opeka
5.
April 28, 1988 SALP Management Meeting Attendees
OFFICIAL RECORD COPY
DL50-245/86-99 FINAL - 0001.0.0
GG0002OO14 eso715
07/06/88
ADOCK 05000245
,p
a
roc
3epe
- - -
-
. , y'
. " .
M 15 M
Northeast Nuclear Energy Company
2
cc w/encis:
E. J. Mroczka, Senior Vice President, Nuclear Engineering and Operations Group
W. D. Romberg, Vice President, Nuclear Operations
S. E. Scace, Station Superintendent
0. O. Nordquist, Director of Quality Services
{
R. M. Kacich, Manager, Generation Facilities Licensing
Gerald Garfield, Esquire
Chairman Zech
Commissioner Roberts
Commissioner Carr
Commissioner Rogers
K. Abraham, PAO, RI (14 copies)
Public Document Room (POR)
Local Public Document Room (LPOR)
Nuclear Safety Information Center (NSIC)
NRC Resident In:pector
State of Connecticut
bec w/ enc 15:
Region I Docket Room (with concurrences)
Management Assistant, ORMA (w/o enc 1)
M. Boyle, NRR
0. Jaffe, NRR
J. Stolz, NRR
J. Taylor, OERO
W. Russell, RI
Division Director, DRSS
Division Director, DRS
SALP Management Meeting Attendees
R. Brady, RI
J. Lieberman, OE
W. Oliveira, DRS
0. Holody, RI
DRP Section Chief
J. Shedlosky, SRI, Haddam Neck
W. Raymond, SRI, Millstone
RI: RP
RI
P
P
R
/
/
HC e/meo
Bett
usen
"p
Alla
Russell
7/1f/88
7/2/99
0FFICIAL RECORD COPY
DL50-245/86-99 FINAL - 0002.0.0
07/06/88