ML20151H403

From kanterella
Jump to navigation Jump to search
Staff Requirements Memo Re 830330 Briefing on Investigation & Possible Enforcement Action.Ie Requested to Submit Investigation Results Based on Review of All Documents for New Info within 3 Wks
ML20151H403
Person / Time
Site: Three Mile Island, Crystal River  Constellation icon.png
Issue date: 04/08/1983
From: Chilk S
NRC OFFICE OF THE SECRETARY (SECY)
To: Jamarl Cummings, Dircks W, Hayes B
NRC, NRC OFFICE OF INSPECTOR & AUDITOR (OIA), NRC OFFICE OF THE EXECUTIVE DIRECTOR FOR OPERATIONS (EDO)
Shared Package
ML20151H394 List:
References
REF-10CFR9.7 M830330B, NUDOCS 8305040068
Download: ML20151H403 (2)


Text

. .

^ *

  1. 'o UNITED STATES  : M 0330B

[ fy,..- ['gg .

NUCLE AR REGULATORY COMMISSION w AsmNcTon, o.c. 2cus ACTION'- DeYoung/Stello

-A , l .

5: s April 8, 1983 -

Roe

%f -',J', ,

  • c[

OFFICE OF THE LIMITED DISTRIBUTION GCunningham SECRETARY Denton Keppler,RIII William J. Dircks, Executive Director MEMORANDUM FOR:

~

for Operations

' Ben B. Hayes, Director, OI -

James J. Cummings, Directo:QOIA FROM: Samuel J. Chilk,Secretad e ,

SUBJECT:

STAFF REQUIREMENTS - BRIljrIbjG ON INVESTIGATION AND POSSIBLE ENFORCEMENT %CTION, 2:35 P.M.,

WEDNESDAY, MARCH 30, 1983, CbMMISSIONERS'

~

CONFERENCE ROOM (CLOSED -- EXEMPTION 5)

The Commission discussed a number of investightions and possible enforcement issues relating to TMI-Unit 1. -

I. Civil Penalty on Examination and Test Proc'edures.

The Director, IE informed the Commission that they had tentatively concluded that the licensee had failed to provide a proper training and testing program and that it is a Severity Level III violation.

Commissioner Ahearne requested IE to explain further

~

the comment on page 4 of their March 29 memorandum that "in view of this licen'see's history regarding operator .

~ competence, the staff did consider the violation significant..."

(IE) (SECY Sus' pense: 4/11/93}- Jf?j The Commission requested that IE forward the results of its investigation to the Commission within three

. Weeks. '(IE) (SECY Suspense: 4/22/83)

II. False Certification of Operator and Material False Statement.

1 l

The staff reviewed t'he status of an investigation into the false certification of an ind.ividual identified as VV as qualified to be a reactor operator.

The Commission requested that staff complete its investigation and forward the results to the Commission l

I within three weeks. (IE) (SECY Suspense: 4/22/83)

I g,gggggggg ,i 3 8305040068 830420 e N Date. .u. , f.f PDR ADOCK 05000289 g PDR

t .' '

t .

4 III. Status of Hartman Investigation. .

The staff reviewed the status of an investigation into alleged falsified leak rate calculations.

The Commission requested that staff determine whether

the 1980 GPU report and the 1982 deposition of Hartman was ever submitted to or known by anyone in the NRC, ,

and if so, when, and whether it was provided to the ,

Department of Justice. -

(EGG) (SECY Suspense: .4/15/83) i OZ .

The Commission also requested staff to determine whether these documents should have been submitted to NRC.

(SECY Suspense: 5/1/83)

' (OGC/p61R

'IV. Investigation of Psychological Profile Test.

Staff informed the Commission tnat the allegations in this investigation had not been substantiated and that

~ -

i. the investigation had been closed. ,

V. GAP Allegation.

The Director, OI discussed the status into allegation made by Mr. Parks, and the Director, OIA discussed the i

status of an investigation into a related issue of collusion.

The Director, OI also discussed personnel resource allocations and noted that three people from EDO and two from OIA would b,e assisting the OI investigation .

"for the next several weeks.

~

Subsequent to the meeting, the Director, OI provided the Commission a work plan to investigate the GAP allegations.

VI. Review of B&W v. GPU Transcripts.

The Commission discussed GPU's offer to allow the NRC to review a number of additional documents related to the trial.

The Commission requested that staff review all the B&W

- and GPU documents and advise the Commission of any significant new information contained therein that would affect safety or understanding of the TMI-2 accident.

(EDO) (SECY Suspense: 5/2/83) cc: Chairman Palladino Commissioner Gilinsky Commissioner Ahearne Commissioner Roberts

Commissioner Asselstine l OGC ,

OPE

- ,. - . - .-_ -- _ . _ . , _ - - - - - -