Category:MEMORANDUMS-CORRESPONDENCE
MONTHYEARML20217F0841999-10-0808 October 1999 Informs That During 466th Meeting of ACRS on 990930-1002, CEOG Proposal to Eliminate PASS from Plant Design & Licensing Bases for CEOG Plants,Were Reviewed.Discussion & Recommendations,Listed ML20217C5311999-10-0808 October 1999 Notification of 991027 Meeting with Representatives of Gpu in Rockville,Md to Discuss Recent Control Rod Surveillance Performance Issues at TMI-1.Proprietary Portions of Meeting Will Be Closed to Public ML20212K8901999-10-0505 October 1999 Notification of 991027 Meeting with Util in Rockville,Md to Discuss Status of Licensing Actions Proposed & Currently Under Review by NRC for TM1-1 ML20216J0151999-09-29029 September 1999 Notification of 991020 Meeting in Forked River,Nj to Discuss Licensee 990922,response to NRC & Other Info Addressing Sale of Portion of Land That Is Part of Plant Site ML20216G3671999-09-10010 September 1999 Forwards CNWRA Program Manager Periodic Rept (Pmpr) for Period 990731-0827 ML20211L3311999-09-0303 September 1999 Notification of 990927 Meeting with Util in Rockville,Md to Allow Licensee to Present Modified Program to Reverify Design Code Compliance of Large Bore Safety Related Piping at Plant,Unit 3 ML20210U7571999-08-20020 August 1999 Forwards Info Received from Gpu Nuclear,Inc on 990820 in Preparation for 990823.Requests Info Be Docketed ML20210C9991999-07-22022 July 1999 Revised Notification of 990813 Meeting with Gpu Nuclear,Inc Rockville,Maryland to Discuss TMI-1 Licensing Action Status. Meeting Date Changed ML20210E9511999-07-12012 July 1999 Notification of 990805 Meeting with Representative of Gpu Nuclear,Inc in Rockville,Md Re Plant,Unit 1 Licensing Action Status ML20212H9621999-06-23023 June 1999 Revised Notification of Meeting with Gpu Nuclear,Inc to Discuss Proposed Mods to RBS Sys Procedures & HPI Cross Connect Lineup.Meeting Rescheduled to 10 A.M. on 990713 ML20195H8521999-06-18018 June 1999 Requests That Encl Questions,Faxed to Gpu Nuclear,Inc on 990616,be Docketed,In Preparation for Forthcoming Conference Call Re TS Change Request 248, Remote Shutdown Sys, ML20195H9911999-06-15015 June 1999 Notification of 990707 Meeting with Util to Discuss Licensee Proposed Mods to Reactor Bldg Spray Procedures & High Pressure Injection Cross Connection Lineup ML20206F2921999-05-0505 May 1999 Forwards Draft Questions Which Were Faxed to Licensee for TMI Unit 1,GPUN on 990505 in Preparation for 990506 Conference Call on TS Change Request 279 ML20206D1291999-04-28028 April 1999 Notification of 990507 Meeting with Gpu Nuclear,Inc in Rockville,Maryland to Discuss Three Mile Island,Unit 1 Licensing Action Status ML20205N3161999-04-0909 April 1999 Notification of Significant Licensee Meeting 99-19 with Util on 990423 to Discuss Emergency Feedwater Flow Discrepancies ML20207F8451999-03-0202 March 1999 Forwards NRC Operator Licensing Exam Rept 50-302/98-301 (Including Completed & Graded Tests) for Tests Administered on 980629-0701 ML20203J0851999-02-18018 February 1999 Notification of 990312 Meeting with Util in Rockville,Md to Discuss Licensee Deficiencies Identified in Their License Amend Request to Change Standby Position of Low Pressure Injection & Building Spray Sys Suction Valves ML20207L7771999-02-18018 February 1999 Notification of 990312 Meeting with Util in Rockville,Md to Discuss Deficiencies in License Amend Request to Change Standby Position of LPI & Bldg Spray Sys Suction Valves from Open to Closed.Meeting Has Been Cancelled ML20203E0321999-02-11011 February 1999 Staff Requirements Memo Re 990211 Affirmation Session in Rockville,Md (Open to Public Attendance) Re Secys 99-044 & 99-045 ML20197G6381998-12-0707 December 1998 Forwards Program Manager Period Rept (Pmpr) for Period 981024-1120 ML20196E2801998-11-30030 November 1998 Discusses Closeout of TAC MA1607 Re Cross Potential for common-cause High Pressure Injection Pump Failure IR 05000289/19983011998-11-0404 November 1998 Forwards NRC Operator Licensing Exam Rept 50-289/98-301 with as Given Written Exam for Tests Administered on 980824-27 at Facility ML20154G3451998-10-0101 October 1998 Rev 2 to Notification of Significant Licensee Meeting 97-73 on 981023 in King of Prussia,Pa to Discuss Actions Taken Re Engineering Corrective Action Performance Assessment Team Findings ML20153D9681998-09-24024 September 1998 Notification of 981006 Meeting W/Gpu Nuclear,Inc in Rockville,Md to Discuss Status of Licensing Actions Proposed & Currently Under Review by NRC for TMI-1 ML20237E8381998-08-28028 August 1998 Notification of 980917 Meeting W/Gpu Nuclear,Inc & Amergen in Rockville,Md to Discuss Sale & Transfer of TMI-1 from Gpu Nuclear,Inc to Amergen ML20151X0311998-08-27027 August 1998 Notification of 980921 Meeting W/Fpc in Rockville,Md to Discuss Present Plans & Schedules for Proposed Design Mods to Emergency Feedwater & High Pressure Injection Systems at Crystal River Unit 3.Meeting Agenda Attached ML20237E3131998-08-26026 August 1998 Forwards for Public Release,Info Re NRC SMM Held on 980714-15.Summary of January 1998 NRC SMM & Watch List Removal Evaluation Factors Also Encl ML20237E4591998-08-20020 August 1998 Submits Rev 1 to Notification of Significant Licensee Meeting 98-73 W/Util in Middletown,Pa to Discuss Actions Taken Re Engineering Corrective Action PA Team Findings. Meeting Postponed ML20237C9401998-08-14014 August 1998 Notification of Significant Licensee Meeting 98-73 on 980828 W/Gpu Nuclear,Inc in Middletown,Pa to Discuss Actions Taken Re Engineering C/A Performance Assessment Team Findings ML20236Y5761998-08-0606 August 1998 Notification of 980724 Meeting W/Util in Rockville,Md to Describe Crystal River Unit 3 Large Bore Piping Project ML20236S1451998-07-17017 July 1998 Responds to 980206 Memo from W Rogers Which Documented Errors Identified in Staff SE for Amend 163 to Crystal River Unit 3 FOL ML20236U5641998-07-10010 July 1998 Notification of 980724 Meeting W/Florida Power Corp in Rockville,Md to Describe Crystal River Unit 3 Large Bore Piping Project ML20249A7921998-06-12012 June 1998 Submits TIA 98-003 Requesting That NRR Respond to Questions Re Unit 3 Low Pressure Injection ECCS Valve Configurations ML20248M0831998-06-11011 June 1998 Notification of 980617 Meeting W/Util in Rockville,Md to Discuss Issues Related to Revised Control Complex Habitability Analysis,Including Assumptions Used in Analysis ML20248L7421998-06-0505 June 1998 Notification of 980617 Meeting W/Util in Rockville,Md to Discuss Issues Related to Revised Control Complex Habitability Analysis,Including Assumptions Used in Analysis ML20248H7001998-05-20020 May 1998 Staff Requirements Memo Re SECY-98-071,exemption to 10CFR72.102(f)(1) Seismic Design Requirement for TMI-2 ISFSI ML20247M2191998-05-19019 May 1998 Notification of 980604 Meeting W/Gpu Nuclear Inc in Royalton,Pa to Discuss Status of Licensing Actions Proposed & Currently Under Review by NRC for TMI-1 ML20216B6871998-05-0808 May 1998 Notification of 980527 Meeting W/Representative of Gpu Nuclear,Inc in Rockville,Md to Discuss Licensee 980324 Submittal Re Control Room Habitability at TMI-1 ML20217Q5271998-05-0404 May 1998 Notification of 980513 Meeting W/Util in Crystal River,Fl to Discuss Issues Related to Increased Number of Sea Turtles Entering Crystal River Intake Canal,Requirements of Endangered Species Act ML20217Q5551998-05-0101 May 1998 Discusses Opening of Task Authorization Control Number for Effort Associated W/Sea Turtle Issues at Crystal River Unit 3 ML20216J5241998-04-15015 April 1998 Notification of 980429 Meeting W/Florida Power Corp in Rockville,Md to Discuss Issues Related to Revised Control Complex Habitability Analysis,Including Assumptions Used in Analysis IR 05000289/19980991998-02-26026 February 1998 Notification of Significant Licensee Meeting 98-22 W/Util on 980318 to Discuss SALP for Period Covering 960805-980124,as Documented in SALP Rept 50-289/98-99 ML20203A3651998-02-12012 February 1998 Notification of Meeting W/Fpc on 980225 in Rockville,Md Re Technical Discussions Concerning IPE Submittal IA-98-345, Discusses Licensing Basis for Letdown Line Break Outside Containment for Plant,Unit 11998-02-0606 February 1998 Discusses Licensing Basis for Letdown Line Break Outside Containment for Plant,Unit 1 ML20154B7931998-02-0606 February 1998 Discusses Licensing Basis for Letdown Line Break Outside Containment for Plant,Unit 1 ML20199F9211998-01-27027 January 1998 Informs That on 971215 FPC Submitted Jco Re Control Complex Habitabiltiy Envelope ML20199A4851998-01-0707 January 1998 Notification of 980112 Meeting W/Util in Rockville,Md to Present Status of Resolution Issues Addressed in NRC CAL, ML20199A4811998-01-0505 January 1998 Notification of 980108 Meeting W/Util in Rockville,Md to Discuss Control Complex Habitability Envelope Including NRC Staff Assessment of FPC Justification for Continued Operation (NRC Ltr ) ML20203C4761997-12-0505 December 1997 Notification of 971215 Meeting W/Util in Rockville,Md to Discuss Util Response to Staff 971126 Request for Addl Info Re SBLOCA License Amend Submittal ML20202E6581997-11-26026 November 1997 Notification of 971202 Meeting W/Util in Rockville,Md to Discuss Seismic Qualification of Mechanical & Electrical Equipment (A46 Issue) & Large Bore Piping & Pipe Support Calculations 1999-09-03
[Table view] Category:STAFF REQUIREMENTS MEMORANDUMS
MONTHYEARML20203E0321999-02-11011 February 1999 Staff Requirements Memo Re 990211 Affirmation Session in Rockville,Md (Open to Public Attendance) Re Secys 99-044 & 99-045 ML20248H7001998-05-20020 May 1998 Staff Requirements Memo Re SECY-98-071,exemption to 10CFR72.102(f)(1) Seismic Design Requirement for TMI-2 ISFSI ML20057C0131993-09-0202 September 1993 Staff Requirements Memo Re Approval of Issuance of Unit 2 Possession Only License Amend ML20125D6021992-12-10010 December 1992 Staff Requirements Memo Re 921201 Briefing of Commission by TMI-2 Advisory Panel in Rockville,Md on Issues Re Decommissioning of Plant & Future of Panel ML20245E0401989-04-27027 April 1989 Staff Requirements Memo Re 890420 Briefing in Rockville,Md Re Status of TMI-2 Cleanup Activities.R Martson Requested That Rept on TMI Revisted Be Made Part of Meeting Record ML20245C5331989-04-21021 April 1989 Staff Requirements Memo Re 890413 Affirmation/Discussion & Vote in Rockville,Md Re SECY-89-089, Effectiveness Review of Final Initial Decision - Disposal of Accident-Generated Water at TMI-2 ML20195C8651988-11-0101 November 1988 Staff Requirements Memo Re 881025 Briefing in Rockville,Md Re TMI-2 post-defueling Monitored Storage ML20154A7141988-05-0909 May 1988 Staff Requirements Memo on 880428 Affirmation/Discussion & Vote in Rockville,Md Re SECY-88-058 Concerning Draft Order in TMI-2 Leak Rate Proceeding.Commission Approved Order Completing Review of Board 870521 Decision ML20196E8661988-02-25025 February 1988 Staff Requirements Memo Re 880218 Affirmation/Discussion & Vote in Washington,Dc on SECY-88-26.Commission Approved Order Responding to Question Certified by Appeal Board to Commission ML20237A8141987-12-10010 December 1987 Revised Staff Requirements Memo Re Commission 871202 Affirmation/Discussion & Vote in Washington,Dc on SECY-87-261,SECY-87-280 & SECY-87-281.FR Notices Should Be Forwarded for Publication & Order Approved ML20211M8611987-02-20020 February 1987 Staff Requirements Memo Re Commission 870213 Briefing by Gpu in Washington,Dc on Status of TMI-2 Cleanup Efforts, Projection of Future Activities and Status of TMI-1 ML20206L5601986-08-0808 August 1986 Staff Requirements Memo Re 860731 Affirmation/Discussion & Vote in Washington,Dc Re SECY-86-203,SECY-86-221,SECY-86-168 & SECY-86-184 ML20211H9001986-06-24024 June 1986 Staff Requirements Memo Re 860611 Meeting W/Advisory Panel for Decontamination of TMI-2 in Washington,D.C.Nrc Must Identify Issues Requiring Panel Input & Examine Ways to Increase Credibility of Psychiatric Studies ML20198H9931986-05-23023 May 1986 Staff Requirements Memo Re 860515 Affirmation/Discussion & Vote in Washington,Dc on Order Rejecting & Granting Rc Arnold & Eg Wallace Requests,Respectively,For Hearing Concerning Integrity Drawn in Restart Proceeding ML20199E2651986-03-20020 March 1986 Staff Requirements Memo Re 860311 Briefing in Washington,Dc by DOE on R&D Results from TMI-2 Cleanup.Chairman Palladino Requested Addl Info on Effects of loss-of-coolant Environ on Instrumentation & Electrical Equipment ML20154A3421986-02-25025 February 1986 Staff Requirements Memo Re 860213 Affirmation/Discussion & Vote in Washington,Dc.Order Denying Suffolk County 860122 Motion Re Shoreham Emergency Exercise Approved.Order Denying Met Ed Employee 860114 Motion Also Approved ML20137L3201986-01-23023 January 1986 Staff Requirements Memo Re Commission 860114 Briefing by Util in Washington,Dc on Status of Cleanup of TMI-2 & Restart of Operations at TMI-1 ML20141E2171986-01-0202 January 1986 Staff Requirements Memo Re 851218 Affirmation/Discussion & Vote in Washington,Dc Re SECY-85-241A & SECY-85-39 (ALAB-818).Board Established by Order to Preside Over Hearing on RCS Leak Rate Data Falsifications at TMI-2 ML20138E5091985-12-11011 December 1985 Staff Requirements Memo Re 851119 Meeting W/Advisory Panel on Decontamination of TMI-2 in Washington,Dc.Analysis Should Be Prepared to Examine Cause of Scheduling Slip & Effect of Delay on Overall Cleanup Schedule ML20140F6881985-07-0505 July 1985 Staff Requirements Memo Re 850620 Periodic Meeting W/ Advisory Panel for Decontamination of TMI-2 in Washington,Dc to Obtain Panel Rept on Cleanup Activities ML20127F0581985-06-14014 June 1985 Staff Requirements Memo Re Commission 850529 Vote in Washington,Dc,Approving Order (SECY-85-183/183A),lifting Immediate Effectiveness of 1979 Shutdown Orders for Facility ML20129G0821985-05-31031 May 1985 Staff Requirements Memo Re Ofc of Investigation 850521 Briefing on Pending Investigations.No Requirements as Result of Briefing ML20129D7401985-05-30030 May 1985 Staff Requirements Memo Re Oral Presentations to Commission at 850522 Meeting Concerning Whether to Lift Effectiveness of 1979 Shutdown Orders for TMI-1.No Requirements Imposed at Meeting ML20129G8721985-05-29029 May 1985 Staff Requirements Memo from 850516 Affirmation/Discussion & Vote in Washington,Dc Re Govt in Sunshine Act Regulations (SECY-85-067) & Aamodt Motion for Reconsideration & Reopening of Record (SECY-85-074A) ML20128D1591985-05-17017 May 1985 Staff Requirements Memo Re Commission 850509 Affirmation/ Discussion & Vote in Washington,Dc Re SECY-85-136, Options to Respond to Remand of Guard Vs NRC, SECY-85-140, TMI-1 Restart Proceeding & SECY-85-141, TMI-1 Restart ML20133K5231985-04-0101 April 1985 Staff Requirements Memo Re Commission 850315 Briefing in Washington,Dc Concerning Continuance for NRC Investigation of TMI-2 Operators at Facility.Investigation Should Continue.Action on COMNP-85-14 & COMJP-85-1 Complete ML20214K4731984-04-0202 April 1984 Staff Requirements Memo Re 840323 Closed Discussion in Washington,Dc on Pending Facility Investigation Re Falsification of Leak Rate Data,Beta & RHR Repts,Mystery Man,Parks/Gischel & Keaten ML20151H4031983-04-0808 April 1983 Staff Requirements Memo Re 830330 Briefing on Investigation & Possible Enforcement Action.Ie Requested to Submit Investigation Results Based on Review of All Documents for New Info within 3 Wks 1999-02-11
[Table view] |
Text
. .
^ *
- 'o UNITED STATES : M 0330B
[ fy,..- ['gg .
NUCLE AR REGULATORY COMMISSION w AsmNcTon, o.c. 2cus ACTION'- DeYoung/Stello
-A , l .
5: s April 8, 1983 -
Roe
%f -',J', ,
OFFICE OF THE LIMITED DISTRIBUTION GCunningham SECRETARY Denton Keppler,RIII William J. Dircks, Executive Director MEMORANDUM FOR:
~
for Operations
' Ben B. Hayes, Director, OI -
James J. Cummings, Directo:QOIA FROM: Samuel J. Chilk,Secretad e ,
SUBJECT:
STAFF REQUIREMENTS - BRIljrIbjG ON INVESTIGATION AND POSSIBLE ENFORCEMENT %CTION, 2:35 P.M.,
WEDNESDAY, MARCH 30, 1983, CbMMISSIONERS'
~
CONFERENCE ROOM (CLOSED -- EXEMPTION 5)
The Commission discussed a number of investightions and possible enforcement issues relating to TMI-Unit 1. -
I. Civil Penalty on Examination and Test Proc'edures.
The Director, IE informed the Commission that they had tentatively concluded that the licensee had failed to provide a proper training and testing program and that it is a Severity Level III violation.
Commissioner Ahearne requested IE to explain further
~
the comment on page 4 of their March 29 memorandum that "in view of this licen'see's history regarding operator .
~ competence, the staff did consider the violation significant..."
(IE) (SECY Sus' pense: 4/11/93}- Jf?j The Commission requested that IE forward the results of its investigation to the Commission within three
. Weeks. '(IE) (SECY Suspense: 4/22/83)
II. False Certification of Operator and Material False Statement.
1 l
The staff reviewed t'he status of an investigation into the false certification of an ind.ividual identified as VV as qualified to be a reactor operator.
The Commission requested that staff complete its investigation and forward the results to the Commission l
I within three weeks. (IE) (SECY Suspense: 4/22/83)
I g,gggggggg ,i 3 8305040068 830420 e N Date. .u. , f.f PDR ADOCK 05000289 g PDR
t .' '
t .
4 III. Status of Hartman Investigation. .
The staff reviewed the status of an investigation into alleged falsified leak rate calculations.
The Commission requested that staff determine whether
- the 1980 GPU report and the 1982 deposition of Hartman was ever submitted to or known by anyone in the NRC, ,
and if so, when, and whether it was provided to the ,
Department of Justice. -
(EGG) (SECY Suspense: .4/15/83) i OZ .
The Commission also requested staff to determine whether these documents should have been submitted to NRC.
(SECY Suspense: 5/1/83)
' (OGC/p61R
'IV. Investigation of Psychological Profile Test.
Staff informed the Commission tnat the allegations in this investigation had not been substantiated and that
~ -
- i. the investigation had been closed. ,
V. GAP Allegation.
The Director, OI discussed the status into allegation made by Mr. Parks, and the Director, OIA discussed the i
status of an investigation into a related issue of collusion.
The Director, OI also discussed personnel resource allocations and noted that three people from EDO and two from OIA would b,e assisting the OI investigation .
"for the next several weeks.
~
Subsequent to the meeting, the Director, OI provided the Commission a work plan to investigate the GAP allegations.
VI. Review of B&W v. GPU Transcripts.
The Commission discussed GPU's offer to allow the NRC to review a number of additional documents related to the trial.
The Commission requested that staff review all the B&W
- and GPU documents and advise the Commission of any significant new information contained therein that would affect safety or understanding of the TMI-2 accident.
(EDO) (SECY Suspense: 5/2/83) cc: Chairman Palladino Commissioner Gilinsky Commissioner Ahearne Commissioner Roberts