-_

APPENDIX C OPER ATING DATA REPOR T AMENDMENT 00CKET NO.

50-265 UNIT Two DATE July 13, 1988 COMP 1.ETED BY Lynne Deelsnyder TELEPHONE 309-654-2241 l

OMRATING STATUS 0000 040188 2400 043088 M

1. REPORnNO PERICO.

GROSS HOURS th REPORTlho PimlOC:

2511 MAX. DEPtND. CAPACITY (Mvwent:

769

2. CURRENTLY AUTHORIZED POWER LEVEL (MWil:

DESIGN ELECTRICAL RATING (mNel:

789 N/A S. POWER LEVE L TO WHtCH RESTRICTED (IP ANY) (MWo Nel:

' REASONS POR RESTRICTION ii,43y3, THIS MONTH YM TO OATE CUMULATIVE 228. E 2289.8 106946.9

5. NUMetR OF HOURS REACTOR WAS CRITICAL...............

0.0 0.0 2985.8

6. REACTOR RESERVE SHUTDOWN HOURS...................

228.4 2261.9 103797.2

7. HOURS GEN ER ATOR ON LIN E.......................

0.0 0.0 702.9 l

8. UNIT RESERVE SHUTDOWN HOURS
9. GROSS THERMAL ENERGY GENERATED (MWM)......,.....

504509*

5153180* 222523747*

162610 1669730 71227514

10. GROSS ELECTRICAL ENERGY GENER ATED (MWM).....,..,,,.
11. NET E'LECTRICAL ENERQY GENERATED (MWM)............. 1544541599345 67159370 31.8 78.9 76.9
12. EACTO R SE RvlC E P ACTOR.......................

31.8 78.9 79.0 13 R EACTOR AV AILABILITY P ACTOR......................

31.8 77.9 74.6

14. UNIT SE RVICE P ACTOR........................

31.8 77.9 75.I

15. U NIT AVAI LA SI LITY P ACTOG..........................

27.9 71.6 62.8

18. UNIT CAPACITY P ACTOR (Usint MDC1.....................

27.2 69.8 61.2

17. UNIT CAPACITY P ACTOR (Uung Demon WWel.................

0. 0 __

6.2 8.3

18. U NIT P O RCE D OUT AG E RAT E..........................
19. SHUTDOWNS SCHEDULED OVER NEXT 6 MC.4THS ITYPE. DATE. AND DURATION OF EACHl:
20. IP SHUT DOWN AT END OF REPORT PERIOD. ESTIMATED DATE OF STARTUP.
21. UNITS IN TE37 STATUS (PRIOR TO COMMERCIAL OPERATION):

PORECAST ACHIEVED INITIAL CRITICALITY INITIAL ELECTRICITY COMMERCl AL OPERAT10N 1.169 8807280327 880627 PDR ADOCK 05000254 R

PDR

--.. - --./

. 1