ML20151G363
| ML20151G363 | |
| Person / Time | |
|---|---|
| Site: | Waterford |
| Issue date: | 07/22/1988 |
| From: | Callan L NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV) |
| To: | Dewease J LOUISIANA POWER & LIGHT CO. |
| Shared Package | |
| ML20151G365 | List: |
| References | |
| NUDOCS 8807280313 | |
| Download: ML20151G363 (2) | |
See also: IR 05000382/1988015
Text
.
.'
,'
.,
,.
.
JUL 2 21988
-In Reply Refer To:
Docket:
50-382/88-15
Louisiana Power & Light Company
-
ATTN: 'J. G. Dewease, Senior Vice President
Nuclear Operations
317 Baronne Street
New Orleans, Louisiana 70160
Gentlemen:
This refers to the inspection conducted by Mr. R. C. Stewart of this office
during the period May 16-20 and June 6-9, 1988, of activities authorized by NRC
Operating License NPF-38 for the Waterford 3 Steam Electric Station, and to the
discussion of our findings with Mr. J. R. McGaha and other members of your
staff at the conclusion of the inspection.
The area examined during the inspection was the Unit 3 inservice testing
program for pumps and valves. Within this area, the inspection consisted of
selective examination of procedures and representative records, interviews with
personnel, and observations by the NRC inspector.
The inspection findings are
-documented in the enclosed inspection report.
Within the scope of the inspection, no violations or deviations were
identified.
<
One unresolved item is identified in paragraph 2.f of the enclosed inspection
report.
Should you have any questions concerning this inspection, we will be pleased to
discuss them with you.
Sincerely,
Original SJgned By
L J. Callan
'
L. J. Callan, Director
Division of Reactor Projects
Enclosure:
Appendix - NRC Inspection Report
50-382/88-15
cc w/ enclosure:
(see next page)
@
- RIV:RI
- C:MQPS
- D:DRS
- 0RP
n r
-
RCStewart/tw
IBarnes
JLMilhoan
ber a
LJCalla
IBar s
/ /88
/ /88
/ /88
/ /
7//t/88
/
- Previously concurred
1\\
8807280313 880722
ADOCK 05000382
{fg/
Q
- - -
-
,
..
,
.:
. ' .'
'
"
.
Louisiana Power & Light Company
-2-
,
Louisiana. Power & Light Company
ATTN:
G. E. Wuller. Onsite
' Licensing Coordinator
P.O. Box B
Killona, Louisiana 70066
Louisiana Power & Light Company
ATTN:
N. S. Carns, Plant Manager
.P.O. Box.B
Killona, Louisiana 70066
Middle-South Services
ATTN: Mr. R.-T. Lally
P.O. Box 61000
New Orleans, Louisiana 70161
Louisiana Power & Light Company
ATTN:
R. F. Burski, Acting Manager
Nuclear Safety and Regulatory
Affairs
317 Baronne Street
P.O. Box 60340
New Orleans, Louisiana 70160
Louisiana Radiation Control Program Director
bec to DMB (IE01)
bec distrib. by RIV:
- RRI
R. D. Martin, RA
- SectionChief(DRP/A)
- DRP
- RPB-DRSS
- MIS System
- Project Engineer, DRP/A
- RSTS Operator
- RIV File
- D. Wigginton, NRR Project Manager
- DRS
R. C. Stewart
Lisa Shea, RM/ALF
G. F. Sanborn, E0
'
- I.
Barnes
- w/766
i
.
.