ML20151G360

From kanterella
Jump to navigation Jump to search
Amend 105 to License DPR-72,revising Tech Specs Re Containment Air Lock Surveillance Requirements
ML20151G360
Person / Time
Site: Crystal River Duke Energy icon.png
Issue date: 04/13/1988
From: Berkow H
Office of Nuclear Reactor Regulation
To:
Shared Package
ML20151G361 List:
References
NUDOCS 8804190358
Download: ML20151G360 (5)


Text

.,

1 pt@ Creg 8

o UNITED STATES E

- ~,,

NUCLEAR REGULATORY COMMISSION l

o 5

E WASHINGTON, D. C. 20555 1

4 ** **

FLORIDA POWER CORPORATION CITY OF ALACHUA CITY OF BUSHNELL l

CITY OF GAINESVILLE CITY OF KISSIMMEE CITY OF LEESBURG CITY OF NEW SMYRNA BEACH AND UTILITIES COMMISSION, CITY OF NEW SMYRNA BEACH CITY OF OCALA l

ORLANDO UTILITIES COMMISSION AND CITY OF ORLAND0 SEBRING UTILITIES COMMISSION j

SEMINOLE ELECTRIC COOPERATIVE, INC.

CITY OF TALLAHASSEE i

DOCKET NO. 50-302 I

CRYSTAL RIVER UNIT 3 NUCLEAR GENERATING PLANT AMENDMENT TO FACILITY OPERATING LICENSE 1

1 Amendment No.105 License No. DPR-72 1.

The Nuclear Regulatory Commission (the Comission) has found that:

A.

The application for amendment by Florida Power Corporation, et al.

(the licensees) dated February 17, 1987, as revised !! arch 9,1988, I

complies with the standards and requirements of the Atomic Energy Act of 1954, as amended (the Act), and the Comission's rules and j

regulations set forth in 10 CFR Chapter I; j

B.

The facility will operate in conformity with the application, the provisions of the Act, and the rules and regulations of the Commission; C.

There is reasonable assurance (i) that the activities authorized by this amendment can be conducted without endangering the health and safety of the public, and (ii) that such activities will be conducted i

in compliance with the Commission's regulations; D.

The issuance of this arondment will not be inimical to the common i

defense and security or to the health and safety of the public; and E.

The issuance of this amendment is in accordance with 10 CFR Part 51 of the Conmission's regulations and all applicable requirements have l

been satisfied.

8804190358 880413 i

PDR ADOCK 05000302 l

p PDR

.. 2.

Accordingly, the license is amended by changes to the Technical Specifications as indicated in the attachment to this license arendment, and paragraph 2.C.(2) of Facility Operating License No. DPR-72 is hereby amended to read as follows:

Technical Specifications The Technical Specifications contained in Appendices A and B, as revised through Amendment No.105, are hereby incorporated in the license.

Florida Power Corporation shall operate the facility in accordance with the Technical Specifications.

3.

This license amendment is effective as of its date of issuance.

FOR THE NUCLEAP. REGULATORY COMMISSION j f.

erbert N. Berkow, Director Project Directorate 11-2 Division of Reactor Projects-I/II Office of Nuclear Reactor Regulation

Attachment:

Changes to the Technical Specifications Date of Issuance: April 13, 1988 l

l

ATTACHMENT TO LICENSE AMENDMENT N0.105 FACILITY OPERATING LICENSE NO. DPR-/2 DOCKET NO. 50-302 Replace the follcwing page of the Appendix "A" Technical Specifications with the attached page.

The revised page is identified by amendment number and contains vertical lines indicating the area of change. The corresponding overleaf page is also provided to maintain document completeness.

Remove Insert 3/4 6-5 3/4 6-5 l

l l

CONTATNMENT SYSTEMS CONTAINMENT AIR LOCKS LIMITING CONDITION FOR OPERATION 3.C.1.3 Each containment air lock shall be OPERABLE with:

a.

Both doors closed except when the air lock is being used for normal transit entry and exit through the containment, then at least one air lock door shall be closed, and I

b.

An overall air lock leakage rate of 1 0.05 La at Pa, 49.6 psig.

APPLICABILITY:

MODES 1, 2, 3 and 4.

ACTION:

With an air lock inoperable, restore the air lock to OPERABLE status within 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> or be in at least HOT STANDBY within the next 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> and in COLD SHUTDOWN l

within the following 30 hours3.472222e-4 days <br />0.00833 hours <br />4.960317e-5 weeks <br />1.1415e-5 months <br />.

SURVEILLANCE REQUIREMENTS 4.6.1.3 Each containment air lock shall be demonstrated OPERABLE:

a.

By verifying seal leakage 10.01 L when the volume between the a

door seals is pressurized to 2 8 psig for at least 30 seconds after stabilizing pressure for at least 15 minutes:

1.

After each opening, (in Modes 1, 2, 3, or 4) except when the air lock is being used for multiple entries, then at least once per 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br />.

2.

' Prior to establishing. CONTAINMENT INTEGRITY when maintenance

)

has not been performed on the air lock.

(Reperformance of i

this test is not required prior to entering Mode 4 if the air i

lock has not been opened since the previous test.)

b.

By conducting overall air lock leakage tests at not less than Pa (49.6 psig), and verifying the overall air lock leakage rate is within its limit:

1. -IAt least once per 6 months, and 2.

' Prior to establishing CONTAINMENT INTEGRITY when maintenance has been performed on the air lock that could affect the air lock sealing capability.

At least once per 6 months by verifying that only one door in each air c.

lock can be opened at a time.

' Exemption to Appendix

'J' of 10 CFR 50.

  1. The provisions of Specification 4.0.2 are not applicable.

CRYSTAL RIVER - UNIT 3 3/4 6-5 Amendment No.105

1 CONTAINMENT SYSTEMS INTERNAL PRESSURE

~

LIMITING CONDITION FOR OPERATION l

3.6.1.4 Primary containment internal pressure shall'be maintained between 17.7 and 12.7 psia, j

APPLICABILITY: MODES 1, 2, 3 and 4.

ACTION:

With the containment internal pressure outside of the limits above, restore the internal pressure to within the limits within 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> or be in at least H0T STANDBY within the next 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> and in COLD SHUTOOWN within the following 30 hours3.472222e-4 days <br />0.00833 hours <br />4.960317e-5 weeks <br />1.1415e-5 months <br />.

I SURVEILLANCE REQUIREMENTS 4.6.1.4 The primary containment internal pressure shall be determined to within the limits at least once per 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br />.

l CRYSTAL RIVER - UNIT 3 3/4 6-6 i

l