Amend 20 to License NPF-47,revising Surveillance Requirements of Tech Spec 4.7.1.2 to Reflect Upgraded UHS Water Temp Monitoring Sys Installed During First Refueling Outage
ML20151G100
Person / Time
Site: River Bend Entergy icon.png
Issue date: 04/11/1988
From: Calvo J
Office of Nuclear Reactor Regulation
To:
Shared Package
ML20151G102 List:
References
NUDOCS 8804190221
Download: ML20151G100 (5)


Text

-

<pe na UNITED STATES

[

g NUCLEAR REGULATORY COMMISSION t

5

'- l WASHINGTON, D. C 20555

%,....+,/

GULF STATES UTILITIES COMPANY DOCKET NO. 50-458 RIVER BEND STATION, UNIT 1 AMENDMENT TO FACILITY OPERATING LICENSE Amendment No. 20 License No. NPF-47 1.

The Nuclear Pegulatory Commission (the Connission) has found that:

A.

The application for amendment by Gulf States Utilities Company (the licensee) dated November 13, 1087, complies with the standards and requirements of the Atomic Energy Act of 1954, as amended (the Act), and the Commission's rules and regulations set forth in 10 CFR Chapter I; C.

The facility will operate in conformity with the application, as amended, the provisions of the Act, and the rules and regulations of the Connission; C.

There is reasonable assurance:

(1)thattheactivitiesauthorized by this amendment can be conducted without endangering the health and safety of the public, and (ii) that such activities will be conductec in compliance with the Commission's regulations; D.

The issuance of this license arendment will not be inimical to the conron defense and security or to the health and safety of the public; and E.

The issuance of this amendment is in accordance with 10 CFR Part 51 of the Comission's regulations and all applicable requirenents have been satisfied.

8904190221 880411 DR ADOCK 0500

  • 8 4

.p.

P.

Accordingly, the license is anended by changes to the Technical Specifications as indicated in the attachment to this license amendment and Paragraph 2.C.(2) of Facility Operating License No. NPF-47 is hereby amended to read as follows:

(2) Technical Srecifications and Environmental Protection Plan The Technicc1 Specifications contained in Appendix A, as revised through Amendment No. 2v and the Envircorental Protection Plan contained in Appendix B, are hereby incorporated ia the licente. GSU shall operate the facility in accordance with the Technical Specifications and the Environmental Protection Plan.

3.

The license aner.drent is effective as of its date of issuance.

FOR THE NUCLEAR REGULATOPY COPMISSION n

C1, la dtH

/p slose A. Calvo Director Pro,iect Directorate - IV Division of Reacter Pro.iects - III, IV, Y and Special Projects Office of Nuclear Reactor Regulation

/.ttachment:

Changes to the Technical Specifications Date of Issuance: April 11,1988

ATTACFFENT TO LICENSE AMENDMENT NO. 20 FACILI'Y OPERATING LICENSE NO. NPF-47 DOCKET NO. 50-458 Peplace the following page of the Appendix "A" Technical Specifications with the enclosed page. The revised page is identified by Arendment nutber and contairs a vertical line indicating the area of change. Overleaf page l

provided to maintain document cerf oteness.

REMOVE PAGES INSERT PAGES 3/4 7 t 3/4 7-4 l

I i

i

1 PLANT SYSTEMS

' s ULTIMATE HEAT SINK LIMITING CONDITION FOR OPERATION 3.7.1.2 The standby cooling water storage basin shall be OPERABLE with:

a.

A mir.imum basin water level at or above elevation 111'10" Mean Sea Level USGS datum, and b.

A basin water temperature of less than or equal to 82'F.

c.

Two OPERABLE cooling tower fan cells (5 fans per cell) per division.

APPLICABILITY:

OPERATIONAL CONDITIONS 1, 2, 3, 4, 5 and *.

ACTION:

With the requirements of the above specification not satisfied:

With the basin water level less than 111'10" MSL or the temperature a.

greater than 82'F, then declare the SSW system inoperable and take the ACTION required by Specification 3.7.1.1.

b.

In OPERATIONAL CONDITION 1, 2, or 3 with any one fan cell inoperable, restore the inoperable fan cell to OPERABLE status within 30 days or be in at least HOT SHUTDOWN within the next 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> and COLD SHUTDOWN within the next 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br />, c.

In OPERATIONAL CONDITION 1, 2, or 3 with one fan cell per division inoperable, restore at least one to OPERABLE status within 7 days or be in at least HOT SHUTDOWN within the next 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> and in COLD SHUTDOWN within the next 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br />.

d.

In OPERATIONAL CONDITION 1, 2, or 3 with both fan cells in one divi-sion inoperable, restore at least one of the inoperable fan cells to OPERABLE status within 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br /> and with both SSW pumps in the other division inoperable, align the OPERABLE SSW pumps to the OPERABLE fan cells within 2 hours2.314815e-5 days <br />5.555556e-4 hours <br />3.306878e-6 weeks <br />7.61e-7 months <br /> or be in at least HOT SHUTDOWN within 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> and in COLD SHUTDOWN within the following 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br />.

e.

In OPERATIONAL CONDITION 1, 2, or 3 with the cooling tower fan cells otherwise inoperable be in at least HOT SHUTDOWN within the next 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> and in COLD SHUTDOWN within the next 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br />.

f.

In OPERATIONAL CONDITION 4, 5

  • with one or less fan cells OPERABLE, declare the SSW system inoperable and take the ACTION required by Specification 3.7.1.1.

The provisions of Specification 3.0.3 are not applicable.

RIVER BEND - UNIT 1 3/4 7-3 g

PLANT SYSTEMS SURVEILLANCE REQUIREMENTS 4.7.1.2 The standby cooling tower and water storage basin shall be determined OPERABLE:

a.

At least once per 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> by verifying the basin water level to be at least elevation 111'10".

b.

By verifying the arithmetical average

  • water temperature to be less l

than or equal to 82'F:

1.

At least once per 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br />, and 2.

At least once per 4 hours4.62963e-5 days <br />0.00111 hours <br />6.613757e-6 weeks <br />1.522e-6 months <br /> when the control room alarm is inoperable and the last recorded basin water temperature is greater than or equal to 75*F, and 3.

At least once per 2 hours2.314815e-5 days <br />5.555556e-4 hours <br />3.306878e-6 weeks <br />7.61e-7 months <br /> when the control room alarm is inoperable and the last recorded basin water temperature is greater than or equal to 80 F.

c.

At least once per 31 days by starting the cooling tower fans in each cell from the control room and operating each fan cell for et least 15 minutes.

  • The average shall include at least 4 op'erable sensors of which at least half shall be located above elevation 94'-0.

RIVER BEND - UNIT 1 3/4 7-4 Amendment No.20 i