Text
,
RPR 0 81988 Cocket No. 50-213 DISTRIBUTION was 55EERTITi~
JPart1ow Mr. Edward J. Mroczka NRC & Local PORs TBarnhart(4)
Senior Vice President SVarga
'r.'anda Jones Nuclear Engineering and Operations BBoger EButcher Connecticut Yankee Atomic Power Company SNorris ACRS(10)
P. O. Box 270 AWang GPA/PA Hartford, Connecticut 06141-0270 OGL-WF ARM /LFMB CHagan Gray File
Dear Mr. Mroczka:
EJordan
SUBJECT:
ISSUANCE OF AMENDMENT (TAC h0. 67610)
The Cocmission has issued the enclosed Amendment No. 102 to Facility Operating License No. DPR-61 for the Haddam Neck Plant, in response to your application dated April 5, 1988.
The change revises Technical Specification Fioures 3.17-1A and B, "Axial offset" and Section 3.17.?, "Linear Heat Generation Rate." The change reduces'the Linear Heat Generation Pate (LHGR) by approximately 1KW/ft with a corresponding reduction in the axial offset limits for four-loop operation.
This reduction was necessary to assure the Haddam Neck Plant treets the Interim Acceptance Criteria (IAC) peak clad ten.perature limit of 2300*F with the recalculated lower Erergency Core Cooling System (ECCS) flow rates for large break Loss of Coolant Accidents (LOCAs). The NRC has reviewed the basis for these changes and agrees that based on the upgraded analysis the new limits will traintain the peak clad ten.perature below 2300'F.
I Your letter dated April 5,1988, requested that this arnendn:ent be treated as an er:ergency because insufficient tirre exists for the Commission's usual 30-day notice without preventing a normr.1 ascension to power up to the plant's j
licensed power level. The staff had limited power operation to 80 percent i
pcker until you provided analysis to assure that the IAC peak clad tenperature limit was not exceeded. This Technical Specification is necessary to assure the IAC peak clad terperature is not exceeded and the plant can resurre operation l
up to 100 percent power.
I 88041902040%$13 PDR ADOCK O PDR P
l 1
-2 A copy of the related Safety Evaluation is also enclosed. The notice of i
issuance and final determination of no significant hazards consideration and i
opportunity for hearing will be included in the Corrmission's bi-weekly Federal Register notice.
Sincerely, Original signed by Alan B. Wang, Project Manager Project Directorate I-4 Divisien of Reactor Projects I/II Office of Nucicar Reactor Regulation
Enclosures:
1.
Arendnent ?!o.102 to CPR-61 P.
Safety Evaluation cc w/enclosu, s:
See next page LA:PDI-4 FP PDI-4 PD:F Pr4 OGC j Gf:crris
/4 dm John z
8)/88 4/y,/00 4/g/88 4/[/88 4/f j
i I
(
r
.w Vr. Edward J. Mroczka Connecticut Yankee Atomic Power Company Haddam Neck Plant l
cc:
R. M. Kacich, Manager Gerald Garfield, Esquire Generation Facilities Licensing Cay, Rerry and Howard Northeast Utilities Service Company Counselors at Law Post Office Box 270 City Place Hartford, Connecticut 06141-0270 Hartford, Connecticut 06103-3499 D. O. Nordquist W. D. Rowberg, Vice President Fanager of Quality Assurance Nuclear Operations Northeast i;uclear Energy Company i
Northeast Utilities Service Company Post Office Box 270 i
Post Offict. Box 270 Hartford, Connecticut 06141-0270 Hartford, Connecticut 06141-0270 Kevin McCarthy, Director Regional Administrator Radiation Control Unit Region I Cepartment of Environrental Protection U. S. Nuclear Regulatory Comission 475 Allendale Road State Office Building King of Prussia, Penr.sylvania 194C6 Hartford, Connecticut 06106
)
Bradford S. Chase, Under Secretary Board of Selectmen Town Hall Energy Division Haddam, Connecticut 06103 Office of Policy and Management 80 Vashington Street J. T. Shedlosky, Resident Inspector Hartford, Connecticut 06106 Haddam Neck Plant D. B. Miller, Station Superintendent c/o U. S. Nuclear Regulatory Commissien Post Office Box 116 Haddam Neck Plant Connecticut Yankee Atomic Power Company East Haddam Post Office RFD 1 Post Office Box 127E East Haddam, Connecticut 06423 East Hampton, Connecticut 06424 1
l G. H. Bouchard, Unit Superintendent Haddam Neck Plant RFD !1 l
Post Office Box 127E East Hampton, Connecticut 06424 4
i
__