ML20151G057

From kanterella
Jump to navigation Jump to search
Amend 60 to Provisional License DPR-45,revising Tech Specs in Response to 871112 & 880129 Application
ML20151G057
Person / Time
Site: La Crosse File:Dairyland Power Cooperative icon.png
Issue date: 04/11/1988
From: Rubenstein L
Office of Nuclear Reactor Regulation
To:
Shared Package
ML20151G055 List:
References
NUDOCS 8804190187
Download: ML20151G057 (5)


Text

>

s@REGuq

,4 kg UNITED STATES

) NUCLEAR REGULATORY COMMISSION WASHINGTON, D. C. 20555 ij t[ v ,/

DAIRYLAND POWER COOPERATIVE DOCKET NO. 50-409 ',.

LA CROSSE BOILING WATER REACTOR (LACBWR)

AMENDMENT TO PROVISIONAL LICENSE Amendment No. 60 License No. DPR-45

1. The Nuclear Regulatory Comission (the Comission) has found that:

A. The application for amendment filed by Dairyland Power Cooperative (the licensee), dated !!ovember 12, 1987 as revised January 29, 1988, complies with the standards and requirements of the Atomic Energy Act of 1954, as amended (the Act), and the Comission's regulations as set forth in 10 CFR Chapter I; B. The facility will be maintained in conformity with the application, the provisions of the Act, and the regulations of the Comission; C. There is reasonable assurance: (i) that the activities authorized s by this amendment can be conducted without endangering the health and safety of the public, and (ii) that such activities will be conducted in compliance with the Commission's regulations set forth in 10 CFR Chapter I; D. The issuance of this amendment will not be inimical to the comon defense and security or to the health and safety of the public; and E. The issuance of this amendment is in accordance with 10 CFR Part 51 of the Comission's regulations and all applicable requirements have been satisfied.

8804190187 080411 PDR ADOCK 05000409 P PDR

l 2. Accordingly, the license is amended by changes to the Technical Specifications as indicated in the enclosure to this license amendment, and paragraph 2.C.(2) of Provisional License No. DPR-45 is hereby amended to read as follows: ,

(2) Technical Specifications The Technical Specifications contained in Appendix A, as revised through Amendment No. 60, are hereby incorporated in the license.

The licensee shall maintain the facility in accordance with the Technical Specificationc. .

3. This license amendment is effective as of the date of issuance.

FOR THE NUCLEAR REGULATORY COMMISSION N dcdC.SM

[ n Lester S. Rubenstein, Director l Standardization and Non-Power Reactor Project Directorate Division of Reactor Projects III, IV, Y and Special Projects  !

Office of Nuclear Reactor Regulation l l

Enclosure:

(

Changes to the Technical i Specifications l Date of Issuance: April 11, 1988

1

. . I l

ENCLOSURE TO LICENSE AMENDMENT NO. 60 PROVISIONAL LICENSE NO. DPR-45 DOCKET NO. 50-409 Replace the following aages of the Appendix A Technical Specifications with the enclosed pages. T1e revised pages are identified by /.mendment number and -"-

contain a vertical line indicating the area of change.

Remove Pages Insert Paoes 6-0 6-0 6-4 6-4

P

', 6.0 ADMINISTRATIVE CONTROLS

============================v.======r=================r==========

6.1 Resp 0NSIBILITY 6.1.1 The Plant Superintendent shall be responsible for overall unit operation and shall delegate in writing the succession to this responsibility during his absence.

6.1.2 The Shift Supervisor (or during his absence from the Control Room, a designated individual) shall be responsible for Control Room command function.

A management directive to this effect, signed by the highest level of corporate management shall be reissued to all station personnel on an annual basis.

6.2 ORGANIZATION ,,

OFFSITE 6.2.1 The offsite organization for unit management and technical support shall be as shown on Figure 6.2 1-1.

UNIT STAFF 6.2.2 The unit organization shall be as shown on Figure 6.2.2-1 and:

a. Each on duty shift shall be composed of at least one Shift Supervisor with a Senior Reactor Operator License and one Operator, who is qualified as a Control Room watchstander.*
b. A qualified Control Room Operator or Shift Supervisor shall be within visual and/or audio distance of the Control Room annunciators.
c. All spent fuel handling shall be directly supervised by either a Licensed Senior Reactor Operator or Senior Reactor Operator Limited to Fuel Handling,
d. An indiv! dual qualified in radiation protection procedures shall be onsite when fuel is onsite or there is a potential for release of radioactive materials. At least one additional Operator and one Health Physics Technician shall be onsite when spent fuel or a spent fuel shipping cask is being handled or when any evolutions are being conducted in or above the Fuel Element Storage Well.
  • Shift crew composition may be one less than the minimum requirement for a period of time not to exceed 2 hours2.314815e-5 days <br />5.555556e-4 hours <br />3.306878e-6 weeks <br />7.61e-7 months <br /> in order to accommodate unexpected absence of on duty shift crew members provided immediate action is taken to restore the shift crew composition to within the minimum requirements. This provision does not permit any shift crew position to be unfilled upon shift change due to an oncoming shift crew member being late or absent.

6-0 Amendment No. 60 PCl-39

f I

I l '

f THIS PAGE INTENTIONALLY LEFT BLANK.

(

l l

l l

1 l

ll f

I l

l 1

l f

6-4 Amendment No. 60 PCI-39