ML20151F484
| ML20151F484 | |
| Person / Time | |
|---|---|
| Issue date: | 07/19/1988 |
| From: | Berlinger C Office of Nuclear Reactor Regulation |
| To: | Dorian T DOUB, MUNTZING & GLASGOW (FORMERLY DOUB & MUNTZING) |
| References | |
| NUDOCS 8807270106 | |
| Download: ML20151F484 (1) | |
Text
I JUL 191988
/
t
-Thomas F. Dorian Doub, Muntzing, and Glasgow Suite 400, 808 Seventeenth St., N.W.
Washington, D. C.
20006
Dear Mr. Dorian:
This is in response to your July 8 letter requesting information on how to obtain our biweekly listing of generic communications that the NRC staff is considering or developing. We do not maintain a mailing list for this listing.
However, the listing is sent to Dennis L. Fadden of the Institute of Nuclear Power Operations on a biweekly basis and a copy is sent to the Public Document Room at 1717 H Street, Washington, D. C.
20555.
Copies can be obtained from the Public Document Room.
I have enclosed a copy of our latest transmittal to INPO for your convenience.
Sincerely.
Original Signed By Carl H. Berlinger Carl H. Berlinger, Chief Generic Communications Branch Division of Operational Events Assessment Office of Nuclear Reactor Regulation
Enclosure:
As stated DISTRIBUTION w/ enclosure CERossi, NRR 1
CHBerlinger, NRR DCKirkpatrick, NRR WDLanning, NRR PDR
- DCS.
DOEA R/F OGCB R/F DKirkpatrick R/F 0
OGCB:DOEA:NRR C/0GCB:DOEA:NRR DCKirkpattck CHBerlinger i
07//ff/88/df6 07//p/88
{
g)YOD I
fs fro 72.70/06
?fo?/9 t
W DAG W//6 f
i f-JUL 71988 Dennis L. Fadden i
Institute of Nuclear Power Operations Suite 1500, 1100 Circle 75 Parkway Atlanta, Georgia 30339-3064
Dear Mr. Fadden:
Enclosed for your information is our biweekly listing of generic comuni-cations being considered or under development by the NRC staff. These include Bulletins (type coded BL on the list), Infonnation Notices (IN) and Generic Letters,(GL). This listing includes all proposed generic communications that had been reported to us by June 30, 1988.
Sincerely.
Original Signed By Carl H. Berlinger Carl H. Berlinger, Chief Generic Connunications Branch Division of Operational Events Assessment Office of Nuclear Reactor Regulation
Enclosure:
As stated i
r t
JUL 7 1983 Page No.
1 07/06/88 s
PROPOSED GENERIC COMMUNICATIONS IN PREPARATION WITHIN THE NRC TP ORIGIN.
SUBJECT CONTACT PHONE ISSUE DATE OFFICE IN NRR/DRIS ENVIRONMENTAL QUALIFICATION Steve (3G1) 07/31/88 RVIB OF LIMITOROUE MOV ACTUATOR Alexander 492-0995 TERMINAL BLOCKS t< MARATHON 1600 TERMINAL BLKS BL AEOD/DSP THIMBLE TUBE WEAR AND OTHER Jack Ramsey (301) 08/01/88 PROBLEMS ASSOCIATED WITH FLOW 492-1167 INDUCED VIBRATION.
IN NRR/ DEST RECENT EVENTS CONCERNING Vern Hodge (301) 07/30/88 SPLB CONTROL ROOM HABITABILITY.
492-1169 BL REGION HEAT EXCHANGER FOULING.
Vern Hodge (301) 09/01/88 492-1169 II IN NRR/DOEA BWR VESSEL OVERFILL EVENTS.
Pat (301) 07/15/88 EAB Baranowski 492-1156 GL NRR/DDEA ADEQUACY OF DESIGN CHANGE-
- Schulten, (301) 07/08/88 EAB EVALUATE CAPACITY &
Fields 492-1192 CAPABILITY OF ELEC POWER SYS TO SUPPLY LOADS FOLLOWING DESIGN CHANGE IN NRR/DCST ERRORS IN CALIBRATION OF Fred (301) 08/01/88 SICB LEAD / LAG AND RATE CIRCUITS IN Burrows 492-0783 REACTOR PROTECTION SYSTEMS.
IN NRR/ DEST UNINTENTIONAL FUEL POOL Vern Hodge (301) 08/01/88 SPLB DRAINAGES.
492-1169 IN REGION MARKING, HANDLING, CONTROL, Bernard (301) 07/15/88 II STORAGE AND DESTRUCTION OF Mann 492-3138 SAFEGUARDS INFORMATION GL NRR/DLPO SAFETY PARAMETER DISPLAY Dick (301) 08/01/88 SYSTEM - ACCEPTABLE METHODS Eckenrode 492-1014 OF IMPLEMENTING REQUIREMENTS l
i GL RES/DE SAFETY RELATED MOTOR OPERATED Owen (301) 07/15/88 l
EIB VALVE TESTING AND INSPECTION Rothberg 492-3815 l
I GL NRR/ DEST INSTRUMENT AIR SYSTEM William (301) 08/01/88 SPLB PROBLEMS AFFECTING SAFETY Lefave 492-0862 RELATED EQUIPMENT T
IN RES/EME LIMITOROUE SMA SPRING Jerry (301) 07/29/88 DEFORMATION Weidenhamer 492-3839
Pcg3 No.
2 Q7/06/88 PROPOSED GENERIC COMMUNICATIONS IN PREPARATION WITHIN THE NRC i
TP ORIGIN.
SUBJECT CONTACT PHONE ISSUE DATE OFFICE IN NRR/DOEA CHANGE IN FORMAT FOR NRC Vern Hodge (301) 08/01/88 OGCB GENERIC CCMMUNICATIONS 492-1169 GL RES/DE SIPPLEMENT TO GENERIC LETTER John (301) 07/15/88 SSEB 87-11 DEALING WITH ARBITRARY O'Brien 869-8213 INTERMEDIATE PIPE RUPTURE REQUIREMENTS IN NRR/DOEA ENVIRONMENT ENDUCED FAILURES R F Scholl (301) 07/15/88 EAB OF SAFETY EQUIPMENT 492-1171 BL NRR/ DEST REQUIREMENTS FOR RESOLUTION W C Lyon (301) 07/29/88 SRXB OF GI99 FOR OPERATION WITH 492-0891 LOWERED RCS INVENTORY AND FOR RELATED ISSUES GL NRR/ DEST INSCRVICE INSPECTION OF WS (301) 01/30/89 EMTB PRESSURE RETAINING WELDS IN Ha:elten 492-0911 THE REACTOR VESSEL GL AEOD LICENSEE COMMITMENTS FOR John (301) 08'30/88 EMERGENCY RESPONSE DATA Hickman 492-4155 SYSTEM (ERDS) IMPLEMENTATION GL NRR/ DEST NRR RECOMMENDATION ON ISI OF Chen P Tan (301) 07/15/88 ESGB MARK I L II STEEL 492-0829 CONTAINMENTS, REFUELING CAVITIES L ASSOC DRAINAGE SYS j
IN NRR/DOEA EFFECTS OF SWITCHYARD R F Scholl (301) 07/15/88 OEAB MODIFICATIONS ON EMERGENCY 492-1171 POWER SOURCES IN NRR/DOEA SUPP TO IN 88-11: POTENTIAL R Scholl (301) 07/30/88 OEAB LOSS OF MCC AND/OR SWITCH 492-1171 BOARD FUNCTION DUE TO FAULTY TIE BOLTS IN NRR/DREP HIGH RADIATION HAZARDS FROM Charles (301) 07/15/88 RPB INCORE DETECTORS Hinson 492-3148 GL RES/DRPS INDIVIDUAL PLANT EXAMINATION Farouk (301) 08/15/88 RHFB FOR SEVERE ACCIDENT Eltawila 492-3543 VULNERABILITIES - 10 CFR 50.54 I
GL NRR/ DEST RESOLUTION OF GENERIC ISSUE Om P Chopra (301) 10/30/88 SELB B-56, DIESEL RELIABILITY 492-0835
e a
Pcgo No.
3 07/06/88 PROPOSED GENERIC COMMUNICATIONS IN PREPARATION WITHIN THE NRC TP ORIGIN.
SUBJECT CONTACT PHONE ISSUE DATE OFFICE GL NRR/ DEST INSERVICE TESTING FOR PUMPS Ted (301) 09/03/88 L
492 O901 EMEB AND VALVES Sullivan IN NRR/DREP INTERPRETATION OF BIDASSAY John (301) 08/01/88 PRPB MEASUREMENTS Buchanan 492-1097 ASSESSMENTS OF INTAKES IN AEOD TESTING PRESSURIZER SAFETY Mary S (301) 07/15/88 VALVES WITH LOOP SEAL FILLED Wegner 492-7818 USING AN HYDRAULIC ASSIST DEVICE GL NRR/DOEA LINE ITEM TECHNICAL Tom Dunning (301) 08/01/88 OTSB SPECIFICATION IMPROVEMENT -
492-1189 REMOVAL OF FIRE PROTECTION REQUIREMENTS GL NRR/DOEA LINE ITEM TECHNICAL Tom Dunning (301) 09/01/88 OTSB SPECIFICATION IMPROVEMENT -
492-1189 REMOVAL OF CYCLE SPECIFIC PARAMETER LIMITS GL NRR/DOEA LINE ITEM TECH SPEC Tom Dunning (301) 09/15/88 OTSB IMPROVEMENT-RELOCATION OF 492-1189 RADIOLOGICAL EFFLUENT REQUIREMENTS TO OFFSITE DOSE CALCULATION MANUAL GL NRR/DOEA LINE ITEM TECHNICAL Tom Dunning (301) 10/15/88 OTSB SPECIFICATION IMPROVEMENT -
492-1189 REMOVAL OF COMPONENT LISTS IN NMSE/AB EVALUATION OF EXTERNAL Harriet (301) 08/01/88 EXPOSURE READINGS OF LICENSEE Karagianni 492-0366 PERSONNEL DOSIMETERS IN NRR/ DEST REPORT OF THE FAILURE OF A Kenneth (301) 07/15/88 EMEB MAIN STEAM ISOLATION VALVE AT Dempsey 492-0918 WATERFORD UNIT 3 IN REGION V FIRE IN PENETRATION SEALS Vern Hodge (301) 08/01/88 492-1169 i
IN NRR/DRIS POTENTIAL LOSS OF SAFE Joe (301) 07/29/88 VIB SHUTDOWN FUNCTION DUE TO Petrosino 4{2-0979 j
PREMATURE SCR FAILURE BL NRR/DRIS QUESTIONABLE CLASS 1E Joe (301) 07/29/88 VIB EQUIPMENT Petrosino 492-0979
i Pcg3 No.
4 07/06/88 PROPOSED GENERIC COMMUNICATIONS IN PREPARATION WITHIN THE NRC TP ORIGIN.
SUBJECT CONTACT PH.ONE ISSUE DATE OFFICE IN NRR/DRIS INADEQUATE FIRE DAMPER Joe (301) 09/30/88 VIB OPERABILITY TESTS UNDER AIR Petrosino 492-0979 FLOW CONDITIONS IN NRR/DRIS POTENTIAL PROBLEMS IN Joe (301) 07/15/88 VIB LICENSEE INSTALLED SILICONE Petrosino 492-0979 FOAM FIRE BARRIER PENETRATION SEALS l
IN NRR/DRIS POTENTIAL MANUFACTURER Joe (301) 10/30/08 VIB DEFECTS IN CUTLER HAMMER E-30 Petrosino 492-0979 SWITCHES MANUFACTURED PRIOR TO A CERTAIN DATE IN NRR/ DEST RECENT DISCOVERY OF Tero (301) 08/01/88 SPLB PHENOMENON NOT PREVIOUSLY Varjoranta 492-1063 CONSIDERED IN THE DESIGN OF SECONDARY CONTAINMENT PRESSURE CONTROL IN REGION FAILURE OF AMP-KYNAR SPLICES A.
S.
(312) 08/01/88 III AND THOMAS & BETTS NYLON WIRE Gautam 790-5523 CAPS DURING EQUIPMENT QUALIFICATION TESTING IN NRR/DOEA TRAPPED CONDENSATE IN STEAM Walt Jensen (301) 07/15/88 EAB GENERATOR LEVEL SENSING LINES 492-1190 CAUSED BY ERRORS IN NRR/DREP IMPROPER USE OF FLASHING Tom Essig (301) 08/23/88 RPB LIGHTS FOR HIGH RADIATION 492-1146 1
AREA CONTROLS GL NRR/ DEST MINIMUM EDGE DISTANCE FOR J Ma b R (301) 07/29/88 ESGB INSTALLATION OF ANCHORS IN Lipinski 492-1376 CONCRETE IN NRR/DOEA SLOWER-THAN-EXPECTED ROD DROP N Prasad (301) 07/08/88 OGCB TIMES Kadambi 492-1153 IN NRR/ DEST PROBLEMS IN VARIOUS EJ (301) 07/22/88 EMEB LICENSEE'S CHECK VALVE Sullivan 492-0901 TESTING PROGRAMS 4
t IN NRR/ DEST THERMAL STRATIFICATION P T Kuo (301) 08/30/88 l
EMEB INDUCED OVERSTRESS CONDITION 4(2-0907 OF SURGE LINE PIPING AT l
TROJAN
Flcg3 No.
5 07/06/88 PROPOSED GENERIC COMMUNICATIONS IN PREPARATION WITHIN THE NRC TP ORIGIN.
SUBJECT CONTACT PHONE ISSUE DATE OFFICE IN NRR/ DEST WATERFORD MSIV PROBLEMS DUE Ken Dempsey (301) 07/20/88 MEB TO FAILED GUIDE RAIL BOLTS 492-0918 l
l l
l T
v
,- -~
-y_,
-,,--.-.m,_,e v--p,r-,-m, r,pp,7--,3,, ye.
. q T y r-y e-ee-----ewe c-=--g