Forwards Insp Repts 50-313/88-05 & 50-368/88-05 on 880229-06510 & Notice of Violation
ML20151F245
Person / Time
Site: Arkansas Nuclear  Entergy icon.png
Issue date: 07/13/1988
From: Callan L
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
To: Campbell G
ARKANSAS POWER & LIGHT CO.
Shared Package
ML20151F248 List:
References
NUDOCS 8807270002
Download: ML20151F245 (2)


See also: IR 05000313/1988005

Text

-

_ _ _

.

I

f-

JUL I 31988

In Reply Refer To:

. Dockets:

50-313/88-05

50-368/88-05

Arkansas Power & Light Company

ATTN: Mr. Gene Campbell

Vice President, Nuclear

Operations

P.O. Box 551

Little Rock, Arkansas 72203

Gentlemen:

This refers to the inspection conducted by Mr. J. R. Boardman of this office

during the periods of February 29 through March 4; March 21-25; April 4-8; and

June 6-10, 1988, of activities authorized by NRC Operating Licenses DPR-51 and

NPF-6 for the Arkansas Nuclear One, Units.1 and 2, and to the discussion of our

findings with Mr. J. Levine and other members of your staff at the conclusion

of the inspection.

The areas examined during this inspection were followup of issues identified in

NRC Inspection Report 50-313;368/87-23, and the licensee's responses to NRC Generic Letter 83-28, "Generic Implication of ATWS Events at the Salem Nuclear

Power Plant." Within these areas, the inspection consisted of selective

examination of procedures and representative records, interviews with

personnel, and observations by the NRC inspector.

The inspection findings are

documented in the enclosed inspection report.

During this inspection, it was found that certain of your activities were in

-

violation of NRC requirements.

Consequently, you are required to respond to

these violations, in writing, in accordance with the provisions of

Section 2.201 of the NRC's "Rules of Practice," Part 2, Title 10, Code of

Federal Regulations.

Your response should be based on the specifics contained

in the Notice of violation enclosed with this letter.

One of the apparent

violations (50-313;368/8805-04), which is described in paragraph 3.a. on page 19

of the enclosed inspection report, is not included in the appended Notice of

1

Violation. You are requested to be prepared to discuss all aspects of this.

violation with Region IV staff at a future meeting covering the Equipment

Qualification Inspection of Arkansas Nuclear One performed July 14-18, 1986

(NRC Inspection Report 50-313/86-23; 50-368/86-24).

At the time of the above meeting, you are also requested to be able to discuss

your corrective actions in response to the findings identified in paragraph 5

,

of this report.

Two unresolved items are identified in paragraphs 4 and 5 of the enclosed

inspection report.

1

RIV:RI*

C:0PS*

C:PSS*

D:DRS*

C:DRP/A*

JRBoardman/tw JEGagliardo

RElreland

JLMilhoan

DChamberlain

/ /88

/ /88

/ /88

/ /88

/ /88

D:DRP4

Reconcurq/(

  • previously concurred

LJCalun

JEGagliarbo

] ^)/88

7 /c /88

-

'\\\\

8807270002 880713

ADOCK0500g3

DR

_ _ .

.

..

.

'

.

.

Arkansas Power & Light Company

-2-

--The response directed by this -letter and the accompanying Notice is not subject

to the clearance procedures of the Office ofl Management and Budget as required

by the Paperwork Reduction Act of.1980,-PL~ 96-511.

Should you have any que-tions concerning this inspection, we will be pleased to

discuss them with you.

Sincerely,

Original SJgned By

L. J. Callan

L. J. Callan, Director

Division of Reactor Projects

~ Enclosures:

1.

Appendix A - Notice of Violation

2.

Appendix B - NRC Inspection Report

50-313/88-05

50-368/88-05

cc w/ enclosures:

Arkansas Nuclear One

ATTN:

J. M. Levine, Executive Director

Nuclear Operations

P.O. Box 608

Russellville, Arkansas 72801

Arkansas Radiation Control Program Director

bec to DMB (IE01)

bec distrib. by RIV:

  • RRI

R. D. Martin, RA

  • RPSB-DRSS
  • Section Chief (DRP/A)

Lisa Shea, RM/ALF

  • R:V File
  • DRP
  • MIS System

'

-*RSTS Operator

  • Project Engineer, DRP/A
  • G. Dick, NRR Project Manager
  • DRS
  • TSS

H. Scott, Acting E0

  • J.

Boardman

J. Gagliardo

R. Ireland

A. Johnson

  • w/766

i

.

. .

.

.J