Monthly Operating Rept for June 1988 for Callaway Unit 1.W/
ML20151F110
Person / Time
Site: Callaway Ameren icon.png
Issue date: 06/30/1988
From: Blosser J, Moose J
UNION ELECTRIC CO.
To:
NRC OFFICE OF ADMINISTRATION & RESOURCES MANAGEMENT (ARM)
References
ULNRC-1804, NUDOCS 8807260358
Download: ML20151F110 (7)


Text

'

DOCKET NO.

50-483 UNIT NAME CALLAWAY UNIT 1 DATE 7-11-88 COMPLETED BY J. H. Moose TELEPHONE 314/676-8243 PART A OPERATIONS

SUMMARY

The plant operated at approximately 100% power with the following exception. On 6/26/88, a turbine runback to 75% occurred when the "B" circulating water pump tripped due to a clogged stator cooling waterline. Return to full power was initiated approximately 30 minutes after initiation of the runtack.

PART B PORV AND SAFETY VALVE SUMPARY None l

Page 1 of 4 88072603DO 080630 M

PDR ADOCK 05000483 4

l R

PNU

\\

l

Part C AVERAGE DAILY U:11T POWER LEVEL DOCKET NO.

50-483 UNIT NAME CALLAWAY UNIT 1 DATE 7-11 88 COMPLETED BY J. H. Hoose TELEPHONE 314/676-8243 MONTH:

June 1988 AVERAGE DAILY POWER LEVEL AVERACE DAILY POWER LEVEL DAY (HWe-Net)

DAY (MWe-Net) 1 1149 17 1161 2

1155 18 1156 3

1164 19 1149 4

1170 20 1140 5

1169 21 1136 6

1164 22 1133 7

1160 23 1133 E

1154 24 1115 9

1172 25 1080 10 1175 2v 1123 11 1168 27 1167 l

12 1162 28 1158 13 1157 29 1155 14 1156 30 1169 15 1159 l

16 1161 Page 2 of 4

p 4

a.-

Part D.

OPERATINC DATA REPORT DOCKET NO.

L50-483 UNIT NAME CALLAWAY UNIT 1 DATE 7-11-88 COMPLETED BY J. M. Moose TELEPHONE 314/676 8243 OPERATING STATUS (YTD CUM )

1.

REPORTINC PERIOD: JUNE 1988 CROSS HOURS IN REPORTING PERIOD:

720 4367 30949.5 2.

CURRENTLY AUTHORIZED POWER LEVEL (MWt):

3565 MAX. DEPEND. CAPACITY (HWe-Net): 1120*

DESIGN ELECTRICAL RATING (MWe-Net):

1171 3.

POWER LEVEL TO kHICH RESTRICTED (IF ANY) (MWe-Net):

4 REASONS FOR RESTRICTION (IF ANY):

THIS HONTH YR TO DATE CUMULATIVE 5.

NUMBER OF HOURS REACTOR WAS CRITICAL...............

720 3960.3.

-25938.1-6 REACTOR RESERVE SHUTDOWN HOURS'.....................

0 0

0 7.

HOURS CENERATOR ON LINE............................

720 3907.0 25361.5 8.

UNIT RESERVE SHUTDOWN HOURS........................

0 0

0 9.

CROSS IEERMAL FRERGY GENERATED (MWH)...............

2,547,644 13,291,722 81,563,502 10 CROSS ELECTRICAL ENERGY GENERATED (MWH)............

868,735 4,520,954 27,562,674

~11.

NET ELECTRICAL ENERGY GENERATED (MhE)..............

829,643

-4,298,938 26,107,981 12.

REACTOR SERVICE FACTOR.............................

100 90.7 83.8 13.

REACTOR AVAILABILIIT FACIOR........................

100 (0.7 83.8 14 UNIT SERVICE FACTOR................................

100 89.5 81.9

15. UNIT AVAILAMILITY FACTOR...........................

100 89.5 81.9 16.

UNIT CAPACITY FACTOR (Us ing M)C)...................

102.9*

87.9*

75.3*

17. UNIT CAPACITY FACTOR (Using Design MWe)............

98.4 84.1 72.0

18. UNIT.~3RCED OUTACE RATE............................

0 5.80 4.35

19. SHUIDOWNS SCHEDULED OVER NEXT 6 MONTHS (TYPE, DATE, AND DURATION OF EACH):

20.

IF SHUT DOWN AT END OF REPORTING PERIOD, ESTIMATED DATE OF STARIUP:

  • Ihe unit capacity factor (using MDC) reflecta use of the MDC value prior to uprating to 3565 MWt.

A uprated MDC value will not be determ87 d until late in 1988.

Page 3 of 4

,,_.. _ _ _. ~., _._.

h,,

Part E-UNIT SHUTD0kHS AND POWER REDUCIIONS DOCKET NO.

50-483 UNIT NAME CALLAWAY UNIT 1 DATE 7-11-88 COMPLETED BY J. M. Moose TELEPHONE

'314/676-8234 REPORT MONTH: JUNE 1988 METHOD OF TYPE SHUTTING DOWN F: PORCED DURATION THE REACTOR OR DATE S SCHEDULED (HOLRS)

REASON REDUCING POWER CORRECTIVE ACTIONS /COMENTS 13 6-26-88 F

0 A

4 Runback to 75% due to "B" circulating water pump trip on high stator ten.perature SUPf1ARY:

REASON METHOD As EQUIPMENT FAILURE (EXPLAIN) 1: MANUAL B: MAI!C. OR TEST 2: MANUAL SCRAM C: REFTJELING -

3: AUTOMATIC SCRAM D: REGULATORY RESTRICTION 4: OIEER (EXPLAIN)

E: OPERATOR TRAINING AND LICENSE EXAMINATION F: ADMINISTRATIVE G: OPERATIONAL ERROR (EXPLAIN)

H: OTHER (EXPLAIN)

Page 4 of 4 i

~

sus

/

UNION ELEN COMPANY Cokracy Plant

. July 11. 1988 Nuclear Regulatory Commission Document Control Desk L'

Washington, DC 20555 ULNRC-1804

Dear Sir:

DOCKET NUMBER 50-483 CALLAWAY PLANT UNIT 1 FACILITY OPERATING LICENSE NPF-30 MONTHLY' OPERATING REPORT JUNE 1988 The enclosed Monthly Operating Report for June 1988 is submitted pursuant to Section 6.9.1.8 of the Callaway Unit 1 Technical Specifica-t

~

tions.

. D. Blorser Manager, Callaway Plant JDB/

/

rj Enclosure I

cc: Distribution attached F

(

Mailing Address: RO. Box 620. Fuk>n, NO 65251

, -. -.. -., -, _ -,. _... -. _ -. ~ - - -.. - - - - - -. _ _.

cc distribution for~ ULNRC-1804 with enclosures Mr. Robert DeFayette. Chief Project Section 1A U. S. Nuclear Regulatory Comtission Region III 799 Roosevelt Road Glen Ellyn. IL 60137 Mr. Thomas Alexion (2 copies)

Office of Nuclear Reactor Regulation U. S. Nuclear Regulatory Commission i

Mail Stop P-316 7920 Norfolk Avenue Bethesda, MD 20014 NRC Resident Inspector Manager. Electric Department Missouri Public Service Commission P. O. Box 360 Jefferson City. MO 65102 8

_1 7'

bec distribution for ULNRC-1804 with enclosures Records Center Institute of Nuclear Power Operations Suite 1500 1100 Circle 75 Parkway Atlanta, GA 30339 I

American Nuclear Insurers Library

^

c/o Dottie Sherman The Exchange Suite 245 270 Farmington Avenue Farmington, CT 06032 Mark Parvin Callaway Project Manager Westinghouse Electric Corp.

P. O. Box 355 Pittsburgh, PA 15230 D. F. Schnell (400)

F. W. Brunson (470)

T. P. Sharkey A. P. Neuhalfen

=

W. R. Campbell A. C. Passwater/D. E. Shafer/D. J. Walker (470)

G. A. Hughes G. J. Czeschin' J. R. Peevy W. R. Robinson R. R. Roselius J. R. Polchow M. E. Taylor D. E. Young Z170.04 (QA Record)

S. L. Auston (NSRB) (470)

T. A. Moser J. M. Moose (2)

R. L. Kelly (460)

R. J. Irwin/J. M. Brown (490)

JDB Chrono 3456-0021.6 G56.37 N. Date l

l l

m

-