9
%
.t
,
In Reply Refer To:
APR I l' M
Docket: 50-298/88-01
,
Nebraska Public Power District
ATTN: George A. Trevors
Division Manager - Nuclear Support
P.O. Box 499
Columbus, NE 68601
.
Gentlemen:
This refers to the Systematic Assessment of Licensee Performance (SALP) Board
Report of Cooper Nuclear Station.
The SALP Board met on March 9, 1988, to
evaluate the performance of the subject facility for the period August 1,
1986, through January 31, 1988. The performance analyses and resulting
evaluations are documented in the enclosed SALP Board Report.
The performance of your facility was evaluated in the selected functional
areas identified in Section IV of the enclosed SALP Board Report. Overall, we
find that site operations were well managed. . Particular strength was noted in
plant operations, radiological controls, fire protection, and licensing
activities. Additionally, positive trends were noted in your maintenance
program and security. While certain aspects of your outages control remained
,
at the high level previously assessed, the area of modification control
indicated a need for increased attention.
During a telephone conversation with you on March 30, 1988, an open meeting
between the Nuclear Regulatory Commission staff and Nebraska Public Power
District was scheduled for 9:00 a.m. April 20, 1988, at Cooper Nuclear Station
to discuss the SALP Board Report.
!
You may submit written consents regarding the SALP Board Report within 30 days
after the meeting.
Connents which you may submit are not subject to the clearance procedures of
-
the Office of Management and Budget as required by the Paperwork Reduction Act
of 1980, PL 96-511.
Sincerely,
l
ce'nal rigned W.
EUM D. :h:tb
m
E$
$
Robert D. Martin
D Ut
Regional Administrator
80
Enclosure:
R$
Appendix - SALP Board Report
['
50-298/88-01
O$
cc: (Next page)
8 3
- PE/DRP/g:c#ffpf
SRI jf>v ,,/
- DRP/C
- PM/NRR
NR
- DRSS
co~
GMadsen hm
WRBenne t
EJHoller WLong
JCa vo
RLBangart
O h~ t'/ //88
'/ /4 /88
/ /88
/ /88 g/g,/88
/ /88
- DRS
DRP G--
O
Reconcur
'JMilhoan LJCallan
RDMartin
EJHoller
p(
/ /88
'{ /15/88
'// ///8
y //r /88
- Previously Concurred
-
.
_
__
-
.. .
-__
,
t
',
e
I
Nebraska Public Power District
-2-
cc:
Cooper Nuclear Station
ATTN: Guy Horn, Division Manager
of Nuclear Operations
P.O. Box 98
Brownville, Nebraska 68321
Record Center, INP0
1100 Circle 75 Parkway
Suite 1500
Atlanta, Georgia 30339
Kansas Radiation Control Program Director
Kansas Radiation Control Program Director
Nebraska Radiation Control Program Director
bec distrib, by RIV:
RRI
R. D. Martin, RA
SectionChief(DRP/C)
Lisa Shea, RM/ALF
RPSB-DRSS
MIS System
RIV File
Project Engineer, DRP/C
RSTS Operator
W. Long, NRR Project Manager